ISO New England (ISO-NE), large loads integration tariff revisions (FERC)
Large-load tariff for data centers: what is on file, the terms the filings state, and where each fact comes from. Terms a filing does not state are marked, never guessed.
StatusPending Last reviewed 2026-11-19
Applies atNot a retail tariff -- revisions to how ISO-NE integrates large loads onto its transmission system
What the filing saysPENDING at FERC. ISO-NE filed ER27-484-000, 'Revisions Related to the Integration of Large Loads to the Transmission System,' on Nov 13, 2026 under FPA section 35.13(a)(2)(iii), with a proposed Nov 14, 2026 effective date (read directly from FERC eLibrary's own filing index; the filed tariff/testimony text itself was not downloaded or read). Reported (RTO Insider, Nov 15, 2026, headline only read via the lead; the article itself was not opened this round): NEPOOL's Participants Committee voted to support most of ISO-NE's proposed large-load changes ahead of the FERC filing. No FERC order on ER27-484 was found as of Nov 17, 2026, and this does not change the terms of any New England state's retail utility entries above. Re-checked Nov 18, 2026 (ER27-484-000 reappeared as a new fercElectric lead with a Nov 18 Federal Register combined-notice-of-filings entry -- the original Section 205 notice, not an order; checked the Federal Register's own document index for the docket by number): still no order. UPDATE 2026-11-18: reported (Utility Dive, read directly, Nov 17, 2026), ISO-NE and the region's transmission owners say this filing (made Friday, Nov 13, 2026, consistent with ER27-484's filing date above) fully addresses FERC's show-cause order: on transparency, ISO-NE proposed maintaining a public list of the network upgrades identified for each large load, by upgrade type, with cost estimates; on resource adequacy, ISO-NE plans to require that large loads bring their own new capacity, with certain large loads excluded from ISO-NE's capacity market's installed capacity requirement. ISO-NE said it will work with stakeholders on further framework details, aiming to file a follow-up proposal at FERC later this year. Re-checked Nov 19, 2026: ER27-484-000 reappeared again in the fercElectric feed; the Federal Register's document index shows no notice or order newer than the Nov 18 combined notice already logged.
Stated terms
This tariff does not yet have terms we can tabulate. The status text above is what the filings and our source state. See the source below.
Source
FERC eLibrary's own Advanced Search index (elibrary.ferc.gov/eLibrarywebapi/api/Search/AdvancedSearch), queried directly 2026-11-17 for accession number 20261113-5007 (ER27-484); RTO Insider, 'NEPOOL PC Supports Most of ISO-NE's Proposed Large Load Changes' (headline read via the regulator-feeds lead, article not opened). Federal Register document index (federalregister.gov/api/v1/documents.json), queried directly 2026-11-18 and 2026-11-19 for "ER27-484": only the Nov 18, 2026 Combined Notice of Filings #2 (the original filing notice), no order. Utility Dive, 'Grid operators file closely watched large load interconnection reforms at FERC,' Ethan Howland, Nov. 17, 2026 (read directly, https://www.utilitydive.com/news/pjm-rto-large-load-interconnection-ferc-show-cause/874872/).
Get an email when this changes
Other utilities in Connecticut and Massachusetts and Maine and New Hampshire and Rhode Island and Vermont
Screening information from public filings, not legal or investment advice. Tariffs change; confirm the current terms with the utility and the commission before relying on them.