Power is not the only thing a data center can run out of.
Cooling takes water, and some towns have paused new connections, limited wells or written water into a moratorium. This page collects those limits in one place: moratoriums that cite water, the ones that restrict sewer, water-tap or groundwater service itself, state bills that name water, and each state's rules for a new large water user. Every row names its jurisdiction and its source.
Water is information on this site. It does not change a screen's score or a Go/No-Go call. A place with no row here has nothing on record with us, which is not the same as no limits.
Water restrictions on record
Sewer pauses, water-connection limits, groundwater caps and water-use rules that are not moratoriums are being researched and added here one at a time, each from the town, county or state's own record. None are listed yet. Know of one? Use the form at the bottom of this page.
Moratoriums that cite or restrict water
Data-center moratoriums recorded as in force or pending. Water service restricted means the recorded text names sewer, water supply or groundwater as the thing being limited. Water cited means water is listed among the reasons. Rows flagged “needs check” have not been confirmed against the jurisdiction's own record.
Alabama (7)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Anniston · City | In force | Water cited | Active as of 2026-09-23; Resolution 26-R-97 adopted 2026-08-18, effective immediately, scheduled for 12 months (to about 2027-08-18). |
| Foley · City | In force | Water cited | Active as of 2026-09-23; six-month moratorium adopted on final reading 2026-09-08 and in effect (to about early March 2027). |
| Harpersville · Town | In force | Water cited | Active as of 2026-09-23; six-month moratorium on zoning, rezoning, new business licenses and building permits for data centers (including cryptocurrency mining… |
| Leeds · City | In force · needs check | Water cited | Active as of 2026-07-31 (expires approximately 2027-06-08). [VERIFY instrument number; primary source (news-only evidence) not confirmed at confidence 0.65 in… |
| Pinson · City | In force | Water cited | Active as of 2026-09-23; one-year moratorium on new data-center proposals approved 2026-08-06. |
| Tarrant · City | In force | Water cited | Active as of 2026-09-23; one-year moratorium on data-center business licenses approved 2026-09-08. Mayor says listening sessions and town halls will follow. |
| Rogersville · Town | Pending | Water cited | Pending as of 2026-09-23; first reading held in July 2026, not yet voted. A Sept. 18, 2026 AL.com roundup independently confirms the town 'hasn't voted on it y… |
Arizona (1)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Pima County · County | In force | Water cited | Active as of 2026-09-23. 120-day moratorium on the acceptance/issuance of new data center permits in unincorporated Pima County, adopted 3-2 (Supervisors Chris… |
Arkansas (2)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Independence County · County | In force | Water cited | Active as of 2026-09-23. Adopted 2026-08-10 by unanimous vote under an emergency clause; runs through 2031-08-31, or until the Quorum Court determines a path f… |
| Union County · County | In force · needs check | Water cited | Active as of 2026-09-23; set to run through 2027-07-09 absent further action. Confirmed by South Arkansas Now's report of its own livestream coverage of the Ju… |
California (12)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Arcata · City | In force | Water cited | Active as of 2026-09-23. Adopted 5-0 on 2026-09-16, effective immediately for 45 days; staff to report back by Oct. 21 (day 35). |
| Calaveras County · County | In force | Water cited | Active as of 2026-09-23. Adopted 4-0 (Chair Stopper absent) on 2026-08-25; runs 45 days to 2026-10-09, extendable up to two years while county studies impacts. |
| Escondido · City | In force | Water cited | Active as of 2026-09-23. Adopted 5-0 on 2026-08-26; staff expected to report back by Oct. 10 with findings; can be extended 10 months 15 days, then up to one m… |
| Eureka · City | In force | Water cited | Active as of 2026-09-23. Adopted unanimously 2026-09-01, effective immediately for 45 days to 2026-10-16; extendable. |
| Gilroy · City | In force | Water cited | Active as of 2026-09-23. Adopted unanimously 2026-09-14, effective immediately for 45 days; staff to report back before expiration. |
| Lake Elsinore · City | In force | Water cited | Active as of 2026-09-23. Adopted unanimously 2026-08-25, effective immediately for 45 days. |
| Los Angeles County · County | In force | Water cited | Active as of 2026-09-23. On Sept. 17, 2026, LA County's Department of Regional Planning director issued a memorandum imposing an immediate, interim prohibition… |
| Palm Springs · City | In force | Water cited | Active as of 2026-09-23. 45-day urgency moratorium on new large-scale data center applications, adopted 2026-08-26, in effect through approximately 2026-10-10… |
| Patterson · City | In force | Water cited | Active as of 2026-09-23. Initial 45-day moratorium on data center construction adopted 2026-07-16; extended unanimously (4-0) on 2026-08-18 through 2027-07-15… |
| Richmond · City | In force | Water cited | Active as of 2026-09-23. 45-day urgency moratorium adopted 2026-09-15, prohibiting the establishment, construction, conversion, or expansion of any data center… |
| San Francisco · City | In force | Water cited | Board of Supervisors unanimously passed the 45-day moratorium on Oct 6 2026, effective immediately. Pauses new data centers and expansions of existing ones, in… |
| Tulare County · County | In force | Water cited | Active as of 2026-09-23. Adopted 4-1 on 2026-08-18 (45 days); extended 5-0 on 2026-09-22 by 10 months 15 days to 2027-08-17, the maximum extension available wi… |
Colorado (10)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Cedaredge · Town | In force | Water cited | Active as of 2026-09-23. Emergency moratorium adopted 6-1 on August 20, 2026 (Ordinance No. 2026-07), running through the earlier of February 20, 2027 or adopt… |
| Delta County · County | In force | Water cited | Active as of 2026-09-23. Confirmed via Delta County's own official website: Resolution R-18 'is scheduled to remain in effect until January 7, 2027, or until t… |
| Denver · City | In force | Water cited | Active as of 2026-09-23. Denver's own official city page confirms the moratorium runs 'from May 21, 2026 to May 21, 2027.' The city has begun forming a 20+ mem… |
| Grand County · County | In force · needs check | Water cited | Active as of 2026-09-23. Moratorium on data center construction adopted June 9, 2026, aligned to expire June 24, 2027 alongside the county's existing solar/win… |
| Johnstown · Town | In force | Water cited | Active as of 2026-09-23. 12-month moratorium on data center facility applications, adopted 5-1 on July 20, 2026 via Ordinance 2026-295. |
| Larimer County · County | In force | Water cited | The county's temporary moratorium on data center applications in unincorporated Larimer County remains in effect through February 2027 (per the county's own pa… |
| Lochbuie · Town | In force | Water cited | Active as of 2026-09-23. Five-year moratorium on new/expanded data center facility applications, adopted 6-1 on July 21, 2026. |
| Loveland · City | In force | Water cited | Active as of 2026-09-23. 12-month suspension on large-scale data center land use applications, adopted 7-2 on September 15, 2026, effective immediately, runnin… |
| Mead · Town | In force | Water cited | Active as of 2026-09-23. 12-month moratorium on data center development applications, adopted 4-2 on August 31, 2026. |
| Paonia · Town | In force | Water cited | Active as of 2026-09-23. One-year moratorium under Resolution 15-26, adopted August 11, 2026, refusing data center applications through August 11, 2027. |
Connecticut (2)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Morris · Town | In force | Water cited | Adopted. The Commission's own document repository shows the moratorium text moved from a 'generals' (draft/agenda-attachment) filing on 2026-04-15 to a 'regula… |
| Trumbull · Town | In force | Water cited | Active as of 2026-09-23. The Town Council unanimously adopted Resolution TC31-65 on 2026-09-09, imposing a 2-year moratorium (effective immediately) on the 'es… |
Florida (14)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| DeSoto County · County | In force | Water cited | Active as of 2026-09-23; one-year moratorium adopted 2026-07-28, with DCIP Group's pending rezoning applications exempted from its coverage. |
| Flagler County · County | In force | Water cited | Active as of 2026-09-23; one-year moratorium applying only to unincorporated Flagler County (does not affect projects within municipal boundaries such as Palm… |
| Holmes County · County | In force | Water cited | Active as of 2026-09-23; one-year countywide pause on new data-center and large-load-customer-facility development approvals in unincorporated Holmes County, a… |
| Lake County · County | In force | Water cited | Pause extended through June 2027, past the 2027 legislative session. A majority of commissioners currently favor a temporary pause over a permanent ban; at lea… |
| Leon County · County | In force | Water cited | Adopted. Large-load customer facilities including data centers, unincorporated areas only. |
| Levy County · County | In force | Water cited | Active as of 2026-09-23; one-year moratorium on data center development permits/orders in unincorporated Levy County, effective Oct 1, 2026 through Sep 30, 202… |
| Manatee County · County | In force | Water cited | Adopted. A 12-month moratorium on new data-center and other large-load development applications in unincorporated Manatee County (building permits, site plans,… |
| Marion County · County | In force | Water cited | Active as of 2026-09-23; 12-month moratorium adopted 2026-09-15, with an exemption for facilities under 50 MW that can still apply via Special Use Permit. |
| Martin County · County | In force | Water cited | Adopted. One-year moratorium on new large-scale/data center development in unincorporated Martin County. A hyperscale data-center application filed 2026-10-12… |
| North Port · City | In force | Water cited | Active as of 2026-09-23 (adopted the day before, 3-2); 18-month moratorium on new data-center applications, but the already-pending ~896,000 sq ft Deep Park da… |
| Putnam County · County | In force | Water cited | Active as of 2026-09-23; commissioners unanimously passed second reading Sept. 8, 2026, temporarily banning medium- and large-scale data center development cou… |
| Hillsborough County · County | Pending · needs check | Water cited | Pending as of 2026-09-23; commissioners voted Aug. 5, 2026 to direct the county attorney to draft a one-year AI data center moratorium, but SB 180 is understoo… |
| Minneola · City | Pending · needs check | Water cited | Pending as of 2026-09-23; City Council advanced a one-year moratorium ordinance in step with Lake County; language reportedly modeled on other Florida ordinanc… |
| Orange County · County | Pending · needs check | Water cited | Pending as of 2026-09-23; commissioners reached consensus around a 6-to-18-month pause on new AI data center applications; formal vote expected Dec. 1, 2026. [… |
Georgia (9)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Bloomingdale · City | In force | Water cited | Active as of 2026-09-23; moratorium adopted 2026-08-20 bars data center applications, permits and licenses in Bloomingdale through 2027-02-16. |
| Chamblee · City | In force | Water cited | Active as of 2026-09-23; 180-day moratorium adopted 2026-07-21 runs through 2027-01-16. |
| Chatham County · County | In force | Water cited | Active as of 2026-09-23; 155-day moratorium adopted 2026-09-11 on 10 MW+ data centers and large warehouse conversions in unincorporated Chatham County, expirin… |
| Clayton County · County | In force · needs check | Water cited | Active/extended as of 2026-09-23; the moratorium on new data center applications and permits in unincorporated Clayton County (originally passed Sept. 2, 2025;… |
| DeKalb County · County | In force | Water cited | Extended. Covers applications for new data centers and for expansions of existing data centers. County has said it is drafting an ordinance restricting data ce… |
| Meriwether County · County | In force | Water cited | Active/extended as of 2026-09-23; moratorium adopted 2026-02-24 and extended 2026-07-28 through 2026-11-21 while staff complete a data center ordinance. |
| Putnam County · County | In force · needs check | Water cited | Active as of 2026-09-23; three-month moratorium on new data centers, battery storage and solar farms effective 2026-08-18, running to about 2026-11-18; town ha… |
| Savannah · City | In force | Water cited | Active as of 2026-09-23; 155-day moratorium adopted 2026-08-27 on large-scale (10 MW+) data centers and warehouse conversions, running to about 2027-01-29 whil… |
| Toccoa · City | In force | Water cited | Active as of 2026-09-23; moratorium adopted 2026-07-27 runs until 2027-01-11. |
Idaho (2)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Bannock County · County | In force | Water cited | Active as of 2026-09-23. Moratorium on the receipt, processing, and approval of data center permit applications in unincorporated Bannock County, effective 202… |
| Elmore County · County | In force | Water cited | Active as of 2026-09-23. Emergency moratorium on the issuance of permits for data center development in unincorporated Elmore County, adopted unanimously 2026-… |
Illinois (10)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Champaign County · County | In force | Water cited | Active |
| City of Carbondale · City | In force | Water cited | Active one-year moratorium. |
| City of Effingham · City | In force | Water cited | Active 12-month moratorium. |
| Henry County · County | In force | Water cited | Active as of 2026-09-23; 12-month moratorium on new data center proposals in unincorporated Henry County, approved by the County Board on 2026-06-18 alongside… |
| Lawrence County · County | In force | Water cited | Active as of 2026-09-23. |
| Mattoon · City | In force | Water cited | Active as of 2026-09-23. Existing businesses that could meet the city's data-center definition may continue operating; the city will not accept new application… |
| Ottawa · City | In force | Water cited | Active as of 2026-09-23; extended through August 25, 2027. |
| Rockford · City | In force | Water cited | Active as of 2026-09-23. Explicitly does not apply to the Edson Road land where Monarch Energy has been pursuing a data center, because that land is already co… |
| Village of Godfrey · Village | In force | Water cited | Extended and active as of 2026-09-23. The Village Board unanimously approved a further 180-day pause on data-center applications at its August 4, 2026 meeting;… |
| Macon County · County | Pending · needs check | Water cited | Pending as of 2026-09-23. A draft 6-month moratorium ordinance was posted by the county on 2026-05-20; the county's Zoning Board of Appeals recommended lengthe… |
Indiana (6)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| DeKalb County · County | In force | Water cited | Active |
| Elkhart · City | In force | Water cited | Active as of 2026-09-23. The Elkhart Common Council voted 9-0 at an Aug. 27, 2026 special meeting to pause acceptance of new data center and battery energy sto… |
| Franklin County · County | In force | Water cited | Active as of 2026-07-31; the moratorium remains the operative instrument, and permanent replacement regulations are still in draft form. Per the Franklin Count… |
| Fulton County · County | In force | Water cited | Active |
| Pulaski County · County | In force | Water cited | Active |
| Owen County · County | Pending · needs check | Water cited | Pending as of 2026-09-23. The Owen County Planning Commission voted to recommend that the Board of Commissioners adopt a one-year moratorium on data center dev… |
Iowa (14)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Adair County · County | In force | Water cited | Active as of 2026-09-23. On Sept. 9, 2026 the Board repealed and rescinded Resolution No. 2026-45 (the Adair County Data Center Regulatory Ordinance) because t… |
| City of Ames · City | In force · needs check | Water cited | Active as of 2026-09-23; council appointed a 15-member Data Center Committee on 2026-09-22 to gather information during the pause. Lightedge has since shifted… |
| City of Cascade · City | In force | Water cited | Active as of 2026-09-23 per the June 2026 adoption; in July 2026 the council considered forming an advisory committee to draft data center rules. |
| City of Dubuque · City | In force | Water cited | Active as of 2026-09-23; six-month hold on hyperscale data center applications and utility requests adopted 2026-09-21 while the City Attorney drafts a long-te… |
| City of Waterloo · City | In force | Water cited | Active as of 2026-09-23; three-month pause from 2026-09-08. The council plans a separate vote on a six-month pause on hyperscale projects. |
| Emmet County · County | In force | Water cited | Active as of 2026-09-23; one-year moratorium adopted 2026-08-25 while the county rewrites zoning; no data center inquiries had been received. |
| Iowa County · County | In force | Water cited | Active as of 2026-09-23; runs to 2027-07-31 unless rescinded or extended. |
| Jefferson County · County | In force | Water cited | Active as of 2026-09-23; 12-month moratorium from 2026-08-11 on permits for construction or material expansion of data centers in unincorporated Jefferson Coun… |
| Johnson County · County | In force | Water cited | Extended 2026-10-15, Board of Supervisors, 5-0. Covers rezonings, subdivisions, site plans and building permits for data centers in unincorporated areas. |
| Louisa County · County | In force | Water cited | Active as of 2026-09-23 (18-month term, or until data center regulations are adopted). A separate cryptocurrency-mining moratorium (Ordinance 26-2) was advanci… |
| Palo Alto County · County | In force | Water cited | Active as of 2026-09-23; runs until 2027-07-08 or earlier passage of a data center ordinance. No data center ordinance was found in Palo Alto County minutes or… |
| Tama County · County | In force | Water cited | Active as of 2026-09-23 (indefinite; ends only after a comprehensive land use plan and a data mining/center ordinance are adopted). Tama County Board minutes f… |
| Union County · County | In force | Water cited | Active. Resolution #21 FYR 25/26 was adopted March 25, 2026, imposing a moratorium on construction of data centers and other high-density facilities "for a per… |
| City of Fairfax · City | Pending · needs check | Water cited | Pending as of 2026-09-23: advanced 3-1 on 2026-07-14; no report of final adoption was found. [VERIFY instrument number; adoption date not confirmed at confiden… |
Kansas (5)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Brown County · County | In force | Water cited | Active |
| Geary County · County | In force | Water cited | Active as of 2026-07-31 (adopted 2026-06-22, after this dataset's 2026-04-28 coverage cutoff) |
| Lawrence · City | In force | Water cited | Active as of 2026-09-23; runs through approximately 2028-07-14 or until repealed. As of a Sept. 21, 2026 follow-up report, the Planning Commission was recommen… |
| Miami County · County | In force · needs check | Water cited | Reported as active/in force as of a May 2026 KSHB follow-up story; exact current status as of 2026-09-23 not independently re-confirmed this pass. [VERIFY inst… |
| Riley County · County | In force · needs check | Water cited | Extended by County Commission resolution 2026-10-15. Suspends land use petitions and permits for data centers and battery storage in unincorporated areas. |
Kentucky (8)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Bell County · County | In force · needs check | Water cited | Active as of 2026-09-23. A Kentucky Lantern report (Aug. 4, 2026) found that despite the two-year moratorium, a contractor said Murray Industries owner Dale Mu… |
| Butler County · County | In force | Water cited | Active as of 2026-09-23; first reading approved 5-0 at the June 22, 2026 Fiscal Court meeting, second reading held July 13, 2026 (WNKY), after which the Judge-… |
| Logan County · County | In force | Water cited | Active as of 2026-09-23; no data center currently proposed for the county per county officials. |
| Lyon County · County | In force · needs check | Water cited | Active as of 2026-09-23 per the only reporting located (published Aug. 20-23, 2026); no follow-up on the ordinance's precise term, a committee's formation, or… |
| Nicholasville · City | In force · needs check | Water cited | Active as of 2026-09-23 per the only reporting located; no update found in this pass. [VERIFY instrument number; primary source (news-only evidence) not confir… |
| Scott County · County | In force | Water cited | Extended and active as of 2026-09-23. The moratorium prohibits the Georgetown-Scott County Planning Commission's acceptance, processing, and approval of data-c… |
| Shelby County · County | In force · needs check | Water cited | Reported as introduced and scheduled for a July 21, 2026 second reading/effective date; this pass did not locate an independent, dated follow-up article confir… |
| Winchester · City | In force | Water cited | Active as of 2026-09-23. Applies within Winchester city limits only; the surrounding, unincorporated Clark County is not covered by this action (no Clark Count… |
Maine (6)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Bangor · City | In force | Water cited | Active as of 2026-07-31. Official City Council minutes confirm Ordinance 26-138 was adopted at the April 13, 2026 regular meeting: the Council first voted 9-0… |
| Brunswick · Town | In force | Water cited | Active as of 2026-07-31 (180-day window runs to approximately late November 2026). A July 27, 2026 Planning & Development staff memo to the Town Council confir… |
| Sanford · City | In force · needs check | Water cited | Extended and active as of 2026-09-23. Sanford City Council unanimously extended the emergency data-center moratorium by 180 days on 2026-08-04, now running thr… |
| Scarborough · Town | In force | Water cited | Active as of 2026-07-31 (180-day window runs to approximately early December 2026 absent extension or earlier replacement by permanent regulations). |
| Warren · Town | In force | Water cited | Active as of 2026-09-23. Voters approved the moratorium in near-unanimous fashion (per industry tracking, roughly 60 residents attended, nearly double normal t… |
| Westbrook · City | In force | Water cited | Active as of 2026-07-31 (180-day window runs to approximately late November 2026). The Council simultaneously referred a review of data-center definitions and… |
Maryland (9)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Baltimore County · County | In force | Water cited | Active as of 2026-09-23; extended through 2027-12-31 by Bill 79-26, passed unanimously by the County Council on 2026-09-22. The Planning Board approved its fin… |
| Calvert County · County | In force | Water cited | Active as of 2026-09-23. Effective 2026-08-28 through 2027-02-28 (or earlier if the Board terminates it by resolution upon finding conditions satisfied). No si… |
| Caroline County · County | In force | Water cited | Active as of 2026-09-23. Suspends acceptance, processing, review, and approval of applications, permits, and BZA/zoning-text-amendment requests for data center… |
| Prince George's County · County | In force | Water cited | Active as of 2026-09-23; unchanged since CR-066-2026 (adopted 2026-07-07, effective through 2028-07-07 or until comprehensive data-center zoning legislation, w… |
| Ridgely · Town | In force | Water cited | Active as of 2026-09-23; Town Commissioners approved a one-year moratorium on data centers within town limits in August 2026, following the Federalsburg data c… |
| Talbot County · County | In force | Water cited | Active as of 2026-09-23. Bars processing, review, and approval of applications, site plans, permits, and other authorizations (including zoning, occupancy, and… |
| Wicomico County · County | In force | Water cited | Active as of 2026-09-23. Bars the Department of Planning, Zoning and Community Development from accepting, processing, reviewing, or approving preliminary plan… |
| Anne Arundel County · County | Pending | Water cited | Pending as of 2026-09-23. A third source (GovTech, syndicating a Capital Gazette report) resolves the apparent conflict between the Baltimore Banner and the co… |
| Pocomoke City · City | Pending · needs check | Water cited | Pending as of 2026-09-23. Introduced in session on 2026-09-08; the Mayor and Council are continuing to discuss the proposal before any adoption vote. Once adop… |
Massachusetts (5)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Everett (restriction proposal, not moratorium) · City | In force | Water cited | Adopted and still in force as of 2026-09-23. The Everett City Council enrolled the Section 37 (Docklands Innovation District) zoning amendment on 2026-06-08 an… |
| Lowell · City | In force | Water cited | Active as of 2026-09-23. The 360-day moratorium (enacted 2026-03-10) remains in force. Markley Group sued the city over the moratorium and reached a settlement… |
| Westfield · City | In force | Water cited | Active as of 2026-07-31; one-year moratorium effective through 2027-07-06. |
| Plymouth · Town | Pending · needs check | Water cited | Pending as of 2026-09-23; Select Board voted unanimously Aug. 25, 2026 to recommend the article; Town Meeting vote scheduled Oct. 17, 2026, which has not yet o… |
| Southbridge · Town | Pending · needs check | Water cited | Pending as of 2026-09-23; joint Town Council/Planning Board public hearing held Sept. 16, 2026, but the Council had not taken a final vote. Under the town's pr… |
Michigan (45)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Green Lake Township (Grand Traverse County) · Township | In force | Water service restricted | Active as of 2026-09-23; one-year moratorium on data centers and industrial- or commercial-scale water extractors/users, effective 2026-05-16, runs to 2027-05-… |
| Ypsilanti Community Utilities Authority · Utility-authority | In force | Water service restricted | Active as of 2026-04-29 |
| Allen Park · City | In force | Water cited | Active as of 2026-09-23; the six-month emergency moratorium adopted 2026-06-09 runs to about early December 2026. |
| Ann Arbor Charter Township · Township | In force · needs check | Water cited | Active as of 2026-09-23; 12-month moratorium adopted 2026-02-16 runs to approximately 2027-02-16. No later action located. [VERIFY instrument number; primary s… |
| Big Rapids Charter Township · Township | In force | Water cited | Active as of 2026-04-29 |
| Bowne Township (Kent County) · Township | In force · needs check | Water cited | Active as of 2026-09-23 (presumed); 12-month data center moratorium voted 2026-02-23 would run to about February 2027; formal adopting instrument not located.… |
| Brandon Township · Township | In force | Water cited | Extended as of 2026-09-23; the board unanimously extended the moratorium for another 180 days in mid-September 2026, so it runs to about late April 2027 while… |
| Cascade Charter Township (Kent County) · Township | In force | Water cited | Active as of 2026-09-23; Resolution 024-2026 (adopted and effective 2026-05-27) runs six months to about 2026-11-27, extendable by up to six months. It succeed… |
| Chikaming Township · Township | In force | Water cited | Active as of 2026-09-23; Ordinances 167 and 168 (adopted 2026-06-16) pause acceptance and processing of data center applications for one year, to about 2027-06… |
| Dearborn Heights · City | In force · needs check | Water cited | Active as of 2026-09-23; the 365-day moratorium adopted 2026-02-24 runs to about 2027-02-24. [VERIFY instrument number; primary source (news-only evidence) not… |
| Delta County · County | In force | Water cited | Active as of 2026-09-23; the 12-month moratorium adopted 2026-07-21 runs to about 2027-07-21. The Planning Commission's 2026-08-31 agenda carried a Data Center… |
| Dexter Township · Township | In force | Water cited | Extended and active as of 2026-09-23; original 180-day term (from 2026-02-17) was extended by Resolution No. 26-711 on 2026-07-21 for a further 180 days (to ro… |
| Dorr Township · Township | In force · needs check | Water cited | Reported adopted in late February 2026 for 12 months; presumed active as of 2026-09-23 (no repeal found). [VERIFY instrument number; primary source (news-only… |
| East Lansing · City | In force | Water cited | Extended; active as of 2026-09-23 through 2027-03-17 after the council's unanimous 2026-08-11 extension; draft zoning language expected fall 2026. |
| Erie Township · Township | In force | Water cited | Active as of 2026-09-23; one-year moratorium under Ordinance No. 132 (effective date listed as 2026-03-16 on the ordinance, running to about 2027-03-16). Plann… |
| Fenton Township · Township | In force | Water cited | Active as of 2026-09-23; Ordinance No. 867, adopted 2026-02-17 and effective 2026-02-22, bars the establishment and use of data centers for 12 months (to about… |
| Freedom Township · Township | In force | Water cited | Active as of 2026-09-23; Ordinance No. 56 effective 2026-03-18 for 365 days (to about 2027-03-18). |
| Frenchtown Charter Township (Monroe County) · Township | In force | Water cited | Active as of 2026-09-23 (presumed); six-month moratorium under Zoning Ordinance No. 300-19 adopted 2026-04-28 runs to roughly late October/November 2026 depend… |
| Garfield Charter Township (Grand Traverse County) · Township | In force | Water cited | Active as of 2026-09-23; twelve-month moratorium on data centers and cryptocurrency mining facilities effective 2026-08-25 runs to 2027-08-25 unless ended earl… |
| Genoa Charter Township · Township | In force | Water cited | Extended; active as of 2026-09-23. Resolution 260817-B (2026-08-17) extended the moratorium six months beyond the initial six-month period (to roughly February… |
| Grand Blanc Township · Township | In force · needs check | Water cited | Active as of 2026-09-23. Township Supervisor Scott Bennett said in a township social-media update that the moratorium remains in place through January 2027 and… |
| Green Charter Township · Township | In force | Water cited | Active as of 2026-04-29 |
| Groveland Township · Township | In force | Water cited | Active as of 2026-09-23; the one-year moratorium adopted 2026-02-09 runs to about 2027-02-09 while the township drafts data-center regulations. |
| Hagar Township · Township | In force · needs check | Water cited | Active as of 2026-09-23. WSJM (July 17, 2026) quotes Township Supervisor Izzy DiMaggio confirming the board adopted the one-year moratorium. A later Tri-City R… |
| Holly Township · Township | In force · needs check | Water cited | Extended as of 2026-09-23; a 2026-07-15 resolution continued the moratorium through 2027-02-15 while the planning commission prepares data-center regulations (… |
| Kalamazoo · City | In force | Water cited | Active as of 2026-09-23; resolution moratorium runs through 2027-08-16. The City Commission gave first reading on 2026-09-21 to a zoning ordinance amendment em… |
| Kalamazoo Township · Township | In force | Water cited | Active as of 2026-09-23; Ordinance No. 647 took effect on publication after the 2026-07-27 adoption and runs 12 months unless regulations are adopted earlier. |
| Manchester Township · Township | In force | Water cited | Active as of 2026-09-23. Ordinance No. 116 (adopted 2025-10-14) runs for the earlier of two years or the Township's implementation of data center regulations;… |
| Marshall · City | In force | Water cited | Active as of 2026-09-23; the City Council's 365-day moratorium approved 2026-08-03 bars approval of data centers until about 2027-08-03 while the city drafts n… |
| Melvindale · City | In force · needs check | Water cited | Reported active as of 2026-06-04; adopted 2026-05-20; term and end date not located, no later action found as of 2026-09-23. [VERIFY instrument number; primary… |
| New Buffalo Township · Township | In force | Water cited | Active as of 2026-09-23; one-year moratorium adopted 2026-04-08. In Aug. 2026 the board denied a permit for a storage yard linked to the data center project. |
| Norvell Township · Township | In force | Water cited | Active as of 2026-09-23; 12-month moratorium adopted 2026-06-08, running to roughly mid-June 2027. |
| Oneida Charter Township · Township | In force | Water cited | Extended; active as of 2026-09-23. Resolution No. 2026-07-14 (adopted 2026-07-14) extended the moratorium from its 2026-07-24 expiry to 2027-01-24 while the Pl… |
| Oshtemo Charter Township · Township | In force | Water cited | Active as of 2026-09-23; one-year moratorium adopted 2026-03-10, effective on publication; township prioritizing BESS ordinance first. |
| Pere Marquette Charter Township · Township | In force | Water cited | Active as of 2026-09-23; one-year data center moratorium under Ordinance No. 162 (adopted 2026-08-11) and zoning Ordinance No. 163 (effective 2026-09-06), runn… |
| Pontiac · City | In force | Water cited | Active as of 2026-09-23. Resolution No. 26-126 (adopted June 16, 2026) extended the moratorium for an additional six months following its original July 20, 202… |
| Portage · City | In force | Water cited | Active as of 2026-09-23; runs to 2026-12-31. On 2026-09-22 the city development officer told council the moratorium may need to be extended because rezoning wo… |
| Rochester Hills · City | In force | Water cited | Extended as of 2026-09-23; the City Council unanimously extended the Ordinance No. 201 moratorium on 2026-08-10, and it now runs to 2027-03-04 while the city d… |
| Saginaw · City | In force · needs check | Water cited | Extended; active as of 2026-09-23. The City Council voted 6-3 on 2026-04-27 (Mayor Moore, Mayor Pro Tem Garcia and Councilwoman Seals opposed) to extend the mo… |
| Solon Township (Kent County) · Township | In force | Water cited | Active as of 2026-09-23; the six-month moratorium adopted 2026-02-09 was extended six months on 2026-07-13 and codified by a zoning amendment adopted 2026-09-1… |
| Stronach Township (Manistee County) · Township | In force | Water cited | Active as of 2026-09-23; data center moratorium resolution adopted 2026-06-10 runs through 2026-12-31 unless extended. |
| Waterford Township · Township | In force | Water cited | Active as of 2026-09-23; the original moratorium runs until 2026-10-01. On 2026-09-14 the Board of Trustees introduced Ordinance 2026-Z-012 (and a companion re… |
| White Lake Township · Township | In force | Water cited | Extended; active as of 2026-09-23. Resolution #26-021, approved 2026-07-21, extends the moratorium from 2026-08-18 through 2027-02-12; the Community Developmen… |
| Williamstown Township · Township | In force | Water cited | Active as of 2026-09-23; one-year term from publication (2026-02-25). On 2026-08-26 the Planning Commission postponed draft data center regulations pending com… |
| Ypsilanti · City | In force | Water cited | Active as of 2026-09-23; the 365-day resolution adopted 2026-03-03 runs to about 2027-03-03, and the latest 60-day emergency zoning-permit moratorium (Ordinanc… |
Minnesota (11)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Blue Earth County · County | In force | Water cited | Active as of 2026-09-23. One-year moratorium (through approximately 2027-08-25) on permitting of data centers in unincorporated Blue Earth County while staff e… |
| Eagan · City | In force | Water cited | Active as of 2026-09-23; in effect through February 17, 2027 unless ended sooner. The City is defending a lawsuit filed in Dakota County District Court by Eaga… |
| Hastings · City | In force | Water cited | Active as of 2026-09-23. One-year moratorium (through approximately 2027-08-17, though city staff indicated they may finish sooner) on accepting, reviewing, or… |
| Le Sueur County · County | In force | Water cited | Active per primary county agenda item and official notice |
| Lonsdale · City | In force | Water cited | Active as of 2026-09-23; the April 30, 2026 adoption date is now confirmed (Interim Ordinance 2026-342, 5-0 vote), so the one-year term runs through approximat… |
| Mankato · City | In force | Water cited | Active as of adoption (2026-07-13), post-dating this dataset's 2026-04-28 coverage cutoff |
| North Mankato · City | In force | Water cited | Active as of 2026-09-23. One-year moratorium (through approximately 2027-09-21) pausing new data centers from being considered or constructed, with an option t… |
| Plymouth · City | In force | Water cited | Active as of 2026-09-23. One-year moratorium (through approximately 2027-09-08) on new data centers larger than 50,000 square feet; does not affect the city's… |
| St. Joseph · City | In force | Water cited | Active as of 2026-09-23. City Council approved Ordinance 2026-004 following a public hearing on 2026-06-15, pausing all data center land use applications for u… |
| Waite Park · City | In force | Water cited | Active as of 2026-05-04/05-05 per KNSI reporting; city intends to use the study period to research data center regulation in nearby communities and draft new r… |
| Woodbury · City | Pending · needs check | Water service restricted | Pending as of 2026-09-23 (the scheduled vote date itself); the City Council was scheduled to consider the proposed interim ordinance at its September 23, 2026… |
Missouri (3)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Ava · City | In force | Water cited | Active as of 2026-09-23; set to expire 2027-07-01 absent repeal, modification, or extension. |
| Cedar County · County | In force | Water cited | Active as of 2026-09-23; set to expire 2027-09-08 absent a single permitted extension of up to six additional months. Residents and at least one local business… |
| Pacific · City | In force | Water cited | Active as of 2026-09-23. Unlike most moratoria, developers may file a waiver to have a pending application considered anyway, and the board may end the stay ea… |
Nebraska (1)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Cass County · County | In force | Water cited | Active as of 2026-09-23. Adopted 2026-08-11 on a unanimous 5-0 vote following a Planning and Zoning Commission recommendation (7-1, mid-July 2026) for an 18-mo… |
Nevada (4)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Nye County · County | In force | Water cited | Active as of 2026-09-23. The countywide temporary moratorium adopted June 2, 2026 remains in force outside Hydrographic Basin 162, per Nevada Current (2026-08-… |
| Reno · City | In force · needs check | Water cited | Active/extended as of 2026-09-23. Confirmed via the City of Reno's own official Development Services 'Initiatives and Updates' page (primary/official source, n… |
| Wells · City | In force | Water cited | Active as of 2026-09-23. 12-month moratorium adopted June 23, 2026 (Resolution No. 26-06), running through approximately June 23, 2027 unless repealed, modifie… |
| White Pine County · County | In force | Water cited | Active as of 2026-09-23. 180-day moratorium adopted July 22, 2026 (Resolution No. 2026-18), running through approximately January 18, 2027 while staff study wa… |
New Hampshire (2)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Bow · Town | In force · needs check | Water cited | Reported as adopted (Planning Board voted unanimously for a one-year moratorium) around Sept. 17, 2026, one week before this research date. A town-meeting vote… |
| Town of Nottingham · Town | In force | Water cited | Active as of 2026-09-23. Nottingham voters approved the Temporary Moratorium on Data Centers Ordinance 1,335-143 at the September 8, 2026 special town election… |
New Jersey (3)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Asbury Park · City | In force · needs check | Water cited | Active as of 2026-09-23. On 2026-06-10 the City Council unanimously adopted Resolution 2026-264, which (a) urges Gov. Sherrill and the legislature to enact a s… |
| Sayreville · Town | In force | Water cited | Enacted per the borough's official adoption notice; active as of 2026-07-31 |
| Mullica Township · Township | Pending | Water cited | Pending as of 2026-09-23. Ordinance 09-2026 was introduced (first reading) at the Township Committee's August 25, 2026 meeting and referred to the Planning Boa… |
New Mexico (4)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Colfax County · County | In force | Water cited | Active as of 2026-09-23. Colfax County Commissioners unanimously adopted Ordinance No. 2026-02, a one-year moratorium on establishing or expanding data centers… |
| Rio Communities · City | In force | Water cited | Active as of 2026-09-23. Council approved 4-0 (reported as Monday, 2026-08-24/26) a 365-day moratorium on undefined uses over 20,000 sq ft in commercial/indust… |
| Santa Fe County · County | In force | Water cited | Active as of 2026-07-31; the county stated no data center proposal was then pending in Santa Fe County |
| Socorro County · County | In force | Water cited | Active as of 2026-07-31 (adopted 2026-06-09, one-year term). Blue Ribbon Committee named 2026-07-29 and is actively working; committee must report at least two… |
New York (8)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| LeRay · Town | In force | Water cited | Active as of 2026-09-23, running to approximately August 2027 per two trackers (industry tracking lists it 'In force'). |
| Manlius · Town | In force | Water cited | Adopted; one-year moratorium in effect. |
| Newfield · Town | In force | Water cited | Active as of 2026-09-23. One-year moratorium on data processing centers and cryptocurrency mining operations; directs the Planning Board (or another select com… |
| Town of Orangetown · Town | In force | Water cited | Active as of 2026-09-23, running approximately 180 days from adoption. Applications for data storage facilities submitted before 2026-07-01 (including DataBank… |
| Town of Tyre · Town | In force | Water cited | Active as of 2026-09-23. A public hearing on the proposed one-year moratorium was held 2026-07-22 (Seneca County); the town's official Local Law Filing PDF for… |
| Buffalo · City | Pending · needs check | Water cited | Pending as of 2026-09-23. A full Buffalo Common Council vote was reported as scheduled for approximately September 29, 2026 (after this research pass's as-of d… |
| Enfield · Town | Pending · needs check | Water cited | Pending as of 2026-09-23, and delayed. A councilperson's first-hand August 2026 account of the August 12, 2026 Town Board meeting states the Board 'held off ac… |
| Mamakating · Town | Pending · needs check | Water cited | Pending/drafting authorized as of 2026-09-23. At its September 15, 2026 meeting the Town Board unanimously voted to have Town Attorney Benjamin Gailey draft a… |
North Carolina (24)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Alamance County · County | In force | Water cited | Active as of 2026-09-23; one-year moratorium adopted 2026-08-17 (to about 2027-08-17) while the county drafts regulations. |
| Camden County · County | In force | Water cited | Active as of 2026-09-23; moratorium in effect 2026-08-03 through 2027-01-03 unless UDO amendments (listing the uses as prohibited pending study) are approved f… |
| Chatham County · County | In force | Water cited | Active as of 2026-09-23 until 2027-02-11 (or earlier adoption of zoning rules). On 2026-09-17 Superior Court Judge John Morris granted summary judgment to Eco… |
| City of Greensboro · City | In force | Water cited | Active as of 2026-09-23; 180-day moratorium on data centers over 10 MW runs until 2027-02-14 while council holds expert work sessions and considers Land Develo… |
| City of Hendersonville · City | In force | Water cited | Active as of 2026-09-23; City Council adopted the 12-month data center moratorium (Ordinance #O-26-29) on 2026-09-03, effective on adoption and expiring about… |
| Davie County · County | In force | Water cited | Active as of 2026-09-23 through 2027-07-05; bars permits and rezonings for data centers countywide under county zoning jurisdiction. Adopted 5-0 on 2026-07-06… |
| Gates County · County | In force | Water cited | Active. Ordinance in force from December 17, 2025 through December 17, 2026, per the signed, executed instrument now posted by the county. |
| McDowell County · County | In force | Water cited | Active as of 2026-09-23; six-month moratorium adopted 2026-08-31 while staff and the planning board draft rules. Separate from the county's 2023 cryptocurrency… |
| Nash County · County | In force | Water cited | Active as of 2026-09-23; effective immediately on 2026-09-08 and in place until 2027-06-30 or earlier adoption of zoning regulations; applies to unincorporated… |
| Orange County · County | In force | Water cited | Active |
| Surry County · County | In force | Water cited | Extended; active as of 2026-09-23 and set to expire 2028-07-20. The county's Development Services moratorium page and the posted July 20, 2026 extension ordina… |
| Swain County · County | In force | Water cited | Active |
| Town of Apex · Town | In force | Water cited | Active |
| Town of Boone · Town | In force | Water cited | Active |
| Town of Canton · Town | In force | Water cited | Active |
| Town of Cary · Town | In force | Water cited | Active as of 2026-09-23; 18-month moratorium adopted 2026-08-27, running to about 2028-02-27, while staff conduct technical studies, community engagement and r… |
| Town of Clyde · Town | In force | Water cited | Active. |
| Town of Holly Springs · Town | In force | Water cited | Active as of 2026-09-23 through 2027-06-16 (or earlier UDO amendments); applies in town and extraterritorial jurisdiction. The Land Use Advisory Committee is r… |
| Town of Nashville · Town | In force | Water cited | Active as of 2026-09-23 through 2027-07-23 (or earlier adoption of zoning regulations). |
| Vance County · County | In force | Water cited | Active as of 2026-09-23; 60-day moratorium adopted 2026-09-14, ending 2026-11-13 or on adoption of the pending zoning text amendment. |
| Warren County · County | In force | Water cited | Active as of 2026-09-23; 12-month moratorium adopted 2026-08-19 (to about 2027-08-19). |
| Watauga County · County | In force | Water cited | Active as of 2026-09-23; the Board of Commissioners unanimously adopted a one-year countywide data center moratorium on 2026-04-21 (to about 2027-04-21). No re… |
| Yadkin County · County | In force | Water cited | Active as of 2026-09-23; two-year moratorium adopted 2026-08-17 applying to unincorporated Yadkin County (not Yadkinville or other towns). |
| Beaufort County · County | Pending | Water cited | Pending as of 2026-09-23; official public hearing and vote scheduled for 2026-10-05. |
Ohio (52)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Lima · City | In force | Water service restricted | Active as of 2026-09-23; 18-month moratorium adopted 2026-09-14 runs to about 2028-03-15 unless council adopts standards sooner. |
| Alliance · City | In force | Water cited | Active as of 2026-07-31 (adopted 2026-07-06); a sub-committee on data centers was formed for future workshops and public discussion. |
| Athens · City | In force | Water cited | Active as of 2026-09-23; one-year moratorium adopted 2026-08-03 runs to about 2027-08-03, extendable one year administratively. |
| Athens Township (Athens County) · Township | In force | Water cited | Active as of 2026-09-23; 12-month moratorium adopted 2026-08-01 runs to about 2027-08-01 (applies to the zoned portion of the township). |
| Boardman Township · Township | In force | Water cited | Active as of 2026-09-23; one-year moratorium adopted 2026-04-28 runs to about 2027-04-28. |
| Braceville Township · Township | In force · needs check | Water cited | Active as of 2026-09-23; six-month moratorium effective 2026-06-02 runs to about 2026-11-29. No extension or repeal found. [VERIFY instrument number; primary s… |
| Brooklyn · City | In force · needs check | Water cited | Active as of 2026-09-23 (presumed); 180-day moratorium passed about June 2026 runs to roughly December 2026. Exact dates unverified. [VERIFY instrument number;… |
| Bucyrus · City | In force | Water cited | Active as of 2026-09-23; renewable two-year moratorium adopted 2026-05-04 as an emergency runs to about 2028-05-03. |
| Canton Township · Township | In force | Water cited | Active |
| Carrollton · Village | In force | Water cited | Active as of 2026-09-23; open-ended moratorium on data centers in the village under Ordinance 2026-10 (passed 2026-05-27, effective about 30 days later), with… |
| Cincinnati · City | In force | Water cited | Active as of 2026-09-23; IDC Overlay District No. 89 (a review requirement, not a full ban) runs through 2027-02-11 after the 2026-04-01 nine-month extension.… |
| City of New Carlisle · City | In force | Water cited | Active through approximately 2027-03-04 |
| Clay Township (Montgomery County) · Township | In force | Water cited | Active as of 2026-09-23; 12-month moratorium adopted 2026-04-07 runs to about 2027-04-07. |
| Cleveland · City | In force | Water cited | Active; a three-month moratorium on new standalone/principal-use data center projects and expansions took effect upon passage on 2026-07-15, running through ap… |
| Commercial Point · Village | In force | Water cited | Active but under legal challenge as of 2026-09-23; 18-month moratorium adopted 2026-05-04 (to about November 2027); K-Nova II filed a mandamus action in the Oh… |
| Eastlake · City | In force | Water cited | Active as of 2026-09-23; five-year moratorium adopted 2025-11-25 runs to about 2030-11-25. |
| Fairborn · City | In force | Water cited | Active as of 2026-09-23; 12-month moratorium (Resolution 38-26) adopted 2026-08-17 runs to about 2027-08-17. A separate, earlier 180-day data center (crypto-mi… |
| Findlay · City | In force | Water cited | Active |
| Freedom Township (Portage County) · Township | In force | Water cited | Active as of 2026-09-23; one-year moratorium adopted 2026-03-19 runs to about 2027-03-19. |
| Garrettsville · Village | In force | Water cited | Active as of 2026-09-23; 12-month moratorium adopted 2026-08-12 runs to about 2027-08-12 unless ended earlier by new data center regulations. |
| Geneva · City | In force | Water cited | Active as of 2026-09-23; 12-month moratorium adopted 2026-06-08 (emergency) runs to about 2027-06-08. |
| Girard · City | In force · needs check | Water cited | Active as of 2026-09-23; one-year emergency moratorium on data center permits passed 2026-07-13, running to about 2027-07-13. [VERIFY instrument number] |
| Green Township (Harrison County) · Township | In force | Water cited | Active as of 2026-09-23; 12-month moratorium on all new development adopted 2026-07-14 runs to about 2027-07-14. WTOV9 (2026-08-11) reports the zoning commissi… |
| Hamilton Township (Warren County) · Township | In force | Water cited | Active as of 2026-09-23; Resolution 26-0520B suspends zoning permits/approvals for new Large-Scale Data Centers until 2027-05-20. |
| Hudson · City | In force | Water cited | Active as of 2026-09-23; six-month moratorium adopted 2026-07-14 runs to about mid-January 2027, extendable six months. |
| Jefferson · Village | In force | Water cited | Active as of 2026-09-23; 12-month moratorium adopted 2026-08-17 (emergency) runs to about 2027-08-17. |
| Kent · City | In force | Water cited | Active |
| Middlefield · Village | In force | Water cited | Active as of 2026-09-23; 12-month moratorium passed 2026-07-09 runs to about 2027-07-09. |
| Monroe Township (Adams County) · Township | In force · needs check | Water cited | Active as of 2026-09-23; 12-month moratorium adopted in early March 2026 runs to about March 2027 (exact end date unknown). [VERIFY instrument number; primary… |
| Monroeville · Village | In force | Water cited | Active as of 2026-09-23; one-year moratorium adopted 2026-02-24 runs to about 2027-02-24. Council is holding work sessions on overlay or conditional-use zoning… |
| Morgan Township (Butler County) · Township | In force · needs check | Water cited | Active as of 2026-09-23 (per OCJ map, one-year moratorium from March 2026 to about March 2027); trustees plan to review draft data center zoning in October 202… |
| Muhlenberg Township (Pickaway County) · Township | In force | Water cited | Active as of 2026-09-23; 12-month moratorium adopted 2026-02-02 runs to 2027-02-03 per trustee statement. |
| New Franklin · City | In force | Water cited | Active as of 2026-09-23; six-month stay adopted 2026-05-20 runs to about mid-November 2026 (2026-11-16 to 2026-11-20). |
| North Ridgeville · City | In force | Water cited | Active as of 2026-09-23; 12-month moratorium adopted 2026-05-18 (effective immediately) runs to about 2027-05-18. |
| Painesville Township · Township | In force | Water cited | Active as of 2026-09-23; 12-month zoning moratorium adopted 2026-05-12 runs to about 2027-05-12. |
| Prairie Township (Franklin County) · Township | In force | Water cited | Active as of 2026-09-23; six-month moratorium adopted 2026-04-15 expires 2026-10-15 unless extended; data center zoning amendments in draft (open houses June 2… |
| Richfield · Village | In force | Water cited | Extended and active as of 2026-09-23; 180-day moratorium of 2026-03-03 was followed by an additional 180-day moratorium adopted 2026-09-03 running to about 202… |
| Shalersville Township · Township | In force · needs check | Water cited | Trustees extended the moratorium (previously due to expire 2026-11-03) by six months, denying a request from Geis Construction/Shalersville Holdings to lift it… |
| Sunbury · City | In force | Water cited | Active as of 2026-09-23; moratorium adopted 2026-04-15 runs through 2027-01-31 unless extended or lifted. |
| Tallmadge · City | In force | Water cited | Active as of 2026-09-23; Ordinance 2026-38 (six-month moratorium, public hearing closed 6:30 p.m. with no comment, adopted 7-0 the same evening on 2026-04-13)… |
| Trenton Township (Delaware County) · Township | In force | Water cited | Active as of 2026-09-23; 12-month moratorium adopted 2026-04-01 runs to 2027-04-01. |
| Twinsburg · City | In force | Water cited | Active as of 2026-09-23; 12-month moratorium adopted 2026-04-14 runs to about 2027-04-14. |
| Upper Sandusky · City | In force | Water cited | Active as of 2026-09-23; six-month moratorium approved in July 2026 runs to about January 2027 while the Planning Commission considers standards for 'High Reso… |
| Urbana · City | In force | Water cited | On 2026-11-03 voters approved a charter amendment permanently banning construction of new data centers (unofficial count ~77% in favor; certification due 2026-… |
| Vermilion Township (Erie County) · Township | In force | Water cited | Active as of 2026-09-23; 12-month moratorium adopted 2026-03-04 runs to 2027-03-04 unless repealed earlier or superseded by zoning amendments. |
| Village of Lordstown · Village | In force | Water cited | Active (extended) as of 2026-09-23; the second 180-day moratorium, passed as an emergency on 2026-06-15, took effect 2026-07-05 and runs to about 2027-01-01. B… |
| Warren · City | In force | Water cited | Active as of 2026-09-23; one-year moratorium approved 2026-09-09 (effective date not confirmed, so end is approximately September/October 2027); Data Center Re… |
| Washington Township (Franklin County) · Township | In force · needs check | Water cited | Original term ended 2026-09-05 (per Resolution #2026.02.10.005). As of 2026-09-23 a further extension is pending confirmation: the trustees' 2026-09-08 agenda… |
| Weathersfield Township · Township | In force | Water cited | Extended; active as of 2026-09-23. Six-month moratorium adopted 2026-04-30 was due to expire in October 2026 and was extended in early September 2026 by six mo… |
| Willoughby · City | In force | Water cited | Active as of 2026-09-23; one-year moratorium passed 2026-07-14 runs to about 2027-07-14, extendable by up to six months. |
| Xenia · City | In force | Water cited | Active as of 2026-09-23; one-year moratorium passed 2026-06-25 (effective about 2026-07-25) runs to about 2027-07-25. |
| Perry · Village | Pending | Water cited | Pending as of 2026-09-23. Ordinance 2026-13 was read a first time 2026-08-13 and scheduled for a second reading 2026-09-10; the next regular meeting is 2026-09… |
Oklahoma (6)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Edmond · City | In force | Water cited | Active as of 2026-09-23; runs through 2026-12-31 or the effective date of a duly-adopted data-center regulation, whichever is earlier, per Section 3 of Ordinan… |
| Norman · City | In force | Water cited | Active as of 2026-09-23; runs through June 9, 2027 or the effective date of new data-center zoning regulations, whichever is earlier, per Ordinance No. O-2526-… |
| Oklahoma City · City | In force | Water cited | Active, as amended, as of 2026-09-23; runs through Dec. 31, 2026 or the effective date of new data-center zoning-code amendments, whichever is earlier (Ordinan… |
| Pawhuska · City | In force | Water cited | Active as of 2026-09-23; runs through Dec. 31, 2026 or earlier adoption of data-center regulations. The pause halted the proposed Buckley Bros Holdings convers… |
| Seminole Nation of Oklahoma · Tribal | In force | Water cited | Active as of 2026-09-23. TR 2026-38 bars 'any inquiries, discussions, and/or developments concerning any entity seeking to develop a data center of any size wi… |
| Shawnee · City | In force | Water cited | Active as of 2026-09-23. Moratorium adopted Aug. 17, 2026 on a unanimous 7-0 vote, effective immediately, freezing new data-center applications through Dec. 31… |
Oregon (3)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Clackamas County · County | In force | Water cited | Adopted. Applies to data center development in unincorporated Clackamas County. |
| Salem · City | In force | Water cited | Active as of 2026-09-23. Moratorium halts construction of all data centers (as a primary use) and accessory data centers with facility capacity greater than 2… |
| Woodburn · City | In force | Water cited | Active as of 2026-09-23. Moratorium prevents city planning staff from considering any new data center land-use application, effective 2026-09-14 through 2027-0… |
Pennsylvania (2)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Brookville Borough · Other | In force | Water cited | Active as of 2026-09-23, running toward its computed 180-day expiry (~2026-12-13/14). Adopted by unanimous Borough Council motion on 2026-06-16, pausing data c… |
| Clinton Township (Wayne County) · Township | In force · needs check | Water cited | Active as of 2026-09-23; the moratorium's precise end date is not independently confirmed (estimated late October 2026 from a six-month term starting April 30,… |
Rhode Island (1)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Westerly · Town | In force | Water cited | Active as of 2026-09-23. The Westerly Town Council adopted a one-year moratorium on all data centers by voice vote at its July 27, 2026 meeting after a public… |
South Carolina (5)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Fairfield County · County | In force | Water cited | Active as of 2026-09-23; adopted Sept. 14, 2026. The county will not accept or act on new data center applications or permits for 12 months from the ordinance'… |
| Laurens County · County | In force | Water cited | Active as of 2026-09-23; adopted 6-0 on Sept. 14, 2026. Applies only to unincorporated Laurens County; the cities of Laurens and Clinton retain control over da… |
| Spartanburg County · County | In force | Water cited | Active as of 2026-09-23; adopted on third reading Sept. 21, 2026 by a 5-1 vote (Coker dissenting). The moratorium applies to data centers exceeding a combined… |
| York County · County | In force | Water cited | Active as of 2026-07-31; may be extended by resolution if more study time is needed. Applies only in unincorporated areas; vested projects, including approved… |
| Mount Pleasant · Town | Pending · needs check | Water cited | Pending as of 2026-09-23; Planning Commission recommended a 120-day moratorium on data center applications on Aug. 31, 2026 (first-reading council discussion h… |
Tennessee (18)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Bristol · City | In force · needs check | Water cited | Active as of 2026-09-23. Ordinance 25-20 (two years, through 2027-10-24) is still described as in force by Tennessee Lookout (2026-07-30); no amending or repla… |
| Charleston · City | In force · needs check | Water cited | Active as of 2026-09-23; 12-month moratorium adopted on second reading 2026-09-08 while the Municipal Planning Commission drafts zoning standards. [VERIFY inst… |
| Cocke County · County | In force | Water cited | Active as of 2026-09-23; one-year moratorium through 2027-06-30 while the Planning Commission drafts ordinance amendments. |
| Crossville · City | In force | Water cited | Active as of 2026-09-23; Ordinance 26-0286 adopted on third and final reading 2026-08-11, imposing a 24-month moratorium (through about 2028-08-11) on new cond… |
| Dickson County · County | In force · needs check | Water cited | Active as of 2026-09-23; six-month moratorium adopted 2026-07-20. [VERIFY instrument number; primary source (news-only evidence) not confirmed at confidence 0.… |
| Kingston Springs · Town | In force · needs check | Water cited | Active as of 2026-09-23; 12-month moratorium adopted on second reading 2026-08-20. [VERIFY instrument number; primary source (news-only evidence) not confirmed… |
| Maury County · County | In force | Water cited | Active as of 2026-09-23; 12-month moratorium in unincorporated Maury County adopted 2026-07-20; a proposed two-year term was rejected on the county attorney's… |
| Moore County · County | In force | Water cited | Active as of 2026-09-23; Metro Council gave final approval April 20, 2026 to a two-year moratorium on new data centers and similar high-impact computing facili… |
| Morgan County · County | In force · needs check | Water cited | Active as of 2026-09-23 per news reporting; two-year resolution adopted 2026-06-12. [VERIFY instrument number; primary source (news-only evidence) not confirme… |
| Rhea County · County | In force | Water cited | Active as of 2026-09-23; temporary moratorium in effect since 2026-07-21 while the Rhea County Regional Planning Commission studies standards. |
| Sevierville · City | In force | Water cited | Active as of 2026-09-23; Ordinance O2026-011 was adopted on third and final reading 2026-08-17 (unanimous), imposing an 18-month moratorium on data centers and… |
| Sparta · City | In force | Water cited | Active as of 2026-09-23; Ordinance 26-1003 passed second and final reading 2026-07-16, imposing a 180-day moratorium on new data-center development in Sparta (… |
| Spring City · Town | In force | Water cited | Active as of 2026-09-23; two-year moratorium approved on final vote 2026-07-30. |
| Unincorporated Hamilton County · County | In force · needs check | Water cited | Active as of 2026-09-23 per news reporting; one-year moratorium on new data centers in unincorporated Hamilton County approved unanimously 2026-07-15, running… |
| White County · County | In force · needs check | Water cited | Active as of 2026-09-23 per news reporting; the indefinite resolution remains on the books, but without county zoning it has limited legal force: a rumored 4.9… |
| Wilson County · County | In force | Water cited | Active as of 2026-09-23; the data center committee finalized a draft zoning resolution on 2026-09-15 for the Planning and Zoning Committee in October, and an e… |
| Hamblen County · County | Pending · needs check | Water cited | Pending as of 2026-09-23; recommended by the Planning Commission 2026-07-06; County Commission adoption not found. [VERIFY instrument number; adoption date not… |
| Roane County · County | Pending · needs check | Water cited | Pending as of 2026-09-23; awaiting a Regional Planning Commission recommendation and a final commission vote. [VERIFY instrument number; adoption date; primary… |
Texas (4)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Hays County · County | In force · needs check | Water cited | Active as of 2026-09-23; Commissioners Court adopted a resolution on 2026-06-23 creating an emergency water-protection review period that pauses approvals for… |
| Lavon · City | In force | Water cited | Active as of 2026-09-23; City Council unanimously approved a 90-day moratorium on data center projects on 2026-08-07, running to on or about 2026-11-05, with t… |
| Fort Worth · City | Pending · needs check | Water cited | Pending as of 2026-09-23. Fort Worth has not yet adopted a data center moratorium; the Aug. 11, 2026 Council action only began the required legal process (two… |
| Lubbock · City | Pending · needs check | Water cited | Pending as of 2026-09-23 (adopted same day as this research date). The Council voted 5-2 to adopt a resolution starting the moratorium process; while the ordin… |
Utah (3)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Clearfield · City | In force | Water cited | Active as of 2026-09-23. The Clearfield City Council voted 4-0 on September 8, 2026 to adopt a 180-day moratorium prohibiting data center development in the ci… |
| Grand County · County | In force | Water cited | Active as of 2026-09-23. Confirmed via Grand County's own signed July 7, 2026 Commission meeting minutes: the Commission voted 7-0 to adopt the ordinance/tempo… |
| Milford · City | In force | Water cited | Active as of 2026-09-23. |
Vermont (1)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Morristown · Town | In force | Water cited | Active as of 2026-09-23. The interim zoning bylaw (dated 2026-08-31) blocks consideration of applications for data centers and other defined 'high-impact uses'… |
Virginia (1)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Virginia Beach · City | In force | Water cited | Active as of 2026-09-23. Virginia Beach City Council unanimously adopted a 12-month moratorium on new data center permits on August 18, 2026, the same night Ch… |
Washington (13)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Cle Elum · City | In force | Water cited | Active as of 2026-09-23. Six-month emergency moratorium adopted 2026-07-31; a public hearing was scheduled for 2026-09-08. The moratorium may not stop the Blue… |
| Kittitas County · County | In force | Water cited | Active as of 2026-09-23. Originally adopted as an emergency six-month moratorium on 2026-08-10 (prompted by concern over a possible Cle Elum-area project); the… |
| La Conner · Town | In force | Water cited | Active as of 2026-09-23. Six-month emergency moratorium on accepting data center permit applications within town limits, adopted 2026-07-28; a public hearing w… |
| Lincoln County · County | In force | Water cited | Active as of 2026-09-23; RCW 36.70A.390 follow-up public hearing scheduled for Oct. 5, 2026. |
| Marysville · City | In force | Water cited | Active as of 2026-07-31; six-month moratorium effective 2026-07-13. |
| Mount Vernon · City | In force | Water cited | Active as of 2026-09-23. Six-month moratorium on data center permit applications, adopted 2026-08-12 (Councilmember Andrew Vander Stoep dissenting); no data ce… |
| Pierce County · County | In force | Water cited | Active as of 2026-09-23. Prohibits filing, processing, or approval of permits for new and expanded data centers exceeding 10 megawatts in unincorporated Pierce… |
| Port Angeles · City | In force | Water cited | Active as of 2026-09-23; council held a required public hearing Sept. 16, 2026 and kept the moratorium unchanged while staff drafts permanent regulations. |
| Renton · City | In force | Water cited | Active as of 2026-09-23. Moratorium on filing, acceptance, processing, and approval of applications/permits for the siting, establishment, or expansion of larg… |
| Skagit County · County | In force | Water cited | In effect in unincorporated Skagit County (outside incorporated cities and towns); a public hearing required under RCW 36.70A.390 was held 2026-07-14. |
| Skamania County · County | In force | Water cited | Active as of 2026-09-23. County-wide moratorium on data center development, adopted by motion and then as Resolution 2026-22 on 2026-08-18; zero applications f… |
| Spokane County · County | In force | Water cited | Active as of 2026-09-23. Four-month pause (same legal effect as a moratorium) on acceptance/processing of County data center building permits in unincorporated… |
| Yakima County · County | In force | Water cited | Active as of 2026-09-23. Six-month moratorium (Resolution 210-2026) preventing acceptance of land use or building permits for data centers in unincorporated Ya… |
Wisconsin (10)
| Jurisdiction | Phase | Water | Status on record |
|---|---|---|---|
| Bellevue · Village | In force | Water cited | Active as of 2026-09-23; adopted unanimously August 12, 2026 after a public hearing the same evening. Gives the village board time to review an ordinance that… |
| Chippewa County · County | In force | Water cited | Active as of 2026-09-23; adopted 18-0 and effective immediately August 11, 2026. Because it was enacted through the county's zoning ordinance, it applies only… |
| City of Madison · City | In force | Water cited | Active |
| Dodge County · County | In force | Water cited | Active as of 2026-09-23; adopted 29-2 (Supervisors Jayme Klockow and Robert Ballweg dissenting; 2 absent) on August 18, 2026, applying to County Zoned unincorp… |
| Manitowoc County · County | In force | Water cited | Active as of 2026-09-23. Confirmed directly against the final adopted ordinance text (No. 2026/2028-10, county code Sec. 8.495): an earlier planning-commission… |
| Oneida County · County | In force | Water cited | Active as of 2026-09-23; adopted unanimously August 18, 2026, for a one-year period that can be extended if regulation drafting takes longer. Does not apply to… |
| Sauk County · County | In force · needs check | Water cited | Active as of 2026-09-23; adopted 27-1 on September 15, 2026. Legal counsel drafted the measure with an 18-month term (rather than 12) based on case law treatin… |
| Winnebago County · County | In force | Water cited | Active as of 2026-09-23; passed in a voice vote at the Aug. 18, 2026 meeting, with District 24 Supervisor Andy Buck as the lone apparent dissenter (his prior m… |
| Milwaukee · City | Pending | Water cited | Pending as of 2026-09-23. The City Plan Commission is scheduled to hold its hearing and make a recommendation on September 28, 2026; the proposal still require… |
| Vilas County · County | Pending | Water cited | Pending as of 2026-09-23. The Vilas County Zoning & Planning Committee held a public hearing on the proposed ordinance on 2026-09-23 (the date of this research… |
State bills and orders that mention water
| State | Bill | Status | Last action | What it says |
|---|---|---|---|---|
| Arizona | HB2467 (2026) | Withdrawn from House Commerce Committee, reassigned to AI and Innovation Committee, no further action; died at Sine Die 2026-06-13 | 2026-01-22 | …ter tax relief and add data center requirements, including energy and water constraints. |
| Arizona | HB2702 (2026) | Withdrawn from House Commerce Committee, reassigned to AI and Innovation Committee, no further action; died at Sine Die 2026-06-13 | 2026-01-22 | …incentive rollback with tax distribution mechanisms tied to solar and water programs. |
| Arizona | HB2738 (2026) | Withdrawn from House Commerce Committee, reassigned to AI and Innovation Committee, no further action; died at Sine Die 2026-06-13 | 2026-01-22 | …des as a condition of tax-relief certification and add annual energy, water, and compliance reporting. |
| Arkansas | HB1444 (2025) -> Act 548 | Enacted as Act 548, signed 2025-04-10 | 2025-04-10 | …t least $2 billion of investment over 10 years; included electricity, water systems, storage, cooling, and related infrastructure. |
| Arkansas | SB10 (2025) | Died in Senate committee at Sine Die adjournment, 2025-05-05 | 2025-05-05 | Proposed to amend the Arkansas Data Centers Act of 2023 and regulate water-use and electric-grid impacts from blockchain networks and digital asset mining. |
| Arkansas | SR7-SR12 and HR1010-HR1015 (2026 fiscal session) | All Senate resolutions (SR7-SR12) failed third-reading floor votes 2026-04-21 and formally died at Sine Die adjournment 2026-04-29; all Hou… | 2026-04-29 | …six-month advance notice before land acquisition or construction, and water-use monitoring. |
| California | AB1577 (2025-2026) | Passed Assembly; read second time and amended, re-referred to Senate Appropriations 2026-07-02 (hearing set 2026-08-03) | 2026-07-02 | …ting to CEC on data center location, floor area, electrical capacity, water and energy consumption, PUE, WUE, onsite generation, generator fuel, procurement, and noise; local agencies would receive data at permitting sta… |
| California | AB2619 (2025-2026) | Passed Assembly; read second time and amended, re-referred to Senate Appropriations 2026-07-02 (hearing set 2026-08-03) | 2026-07-02 | Would revive and expand water-use reporting for data centers and require DWR/CEC guidance on water-efficient data center practices. |
| California | AB93 (2025-2026) | Vetoed by Governor 2025-10-11; consideration of veto stricken from file 2026-01-22 | 2026-01-22 | Would have required data center water-use estimates and annual water-use reporting tied to business licenses and permits. |
| California | SB887 (2025-2026) | Passed Senate; read second time and amended, re-referred to Assembly Appropriations 2026-06-29 (hearing set 2026-08-05) | 2026-06-29 | …development project streamlining if they meet conditions for energy, water, infrastructure costs, labor, and community benefits. |
| Colorado | HB26-1030 | Postponed indefinitely by House Energy and Environment Committee (vote 11-2) 2026-05-07 | 2026-05-07 | …nvestment threshold, job and labor commitments, utility consultation, water stewardship, backup power requirements, and targeted resource acquisition authority. |
| Colorado | SB25-280 | Laid over unamended (amendments failed) in Senate Appropriations Committee 2025-05-08; bill died with adjournment of the 2025 session | 2025-05-08 | …nt credits, utility consultation, renewable/clean energy commitments, water stewardship, and annual compliance reports. |
| Colorado | SB26-102 | Postponed indefinitely by Senate Transportation and Energy Committee (vote 9-0) 2026-05-11 | 2026-05-11 | …collective load; includes renewable energy and hourly matching rules, water/electricity reporting, infrastructure cost contracts, model codes, site assessments, cumulative impact analysis, public engagement, community be… |
| Connecticut | HB05076 (2025) | Referred to Joint Committee on Energy and Technology 2025-01-10; no further action recorded on the bill's CGA history; died in committee at… | 2025-01-10 | …t renewable energy, use storage and modern grid infrastructure, adopt water conservation measures, and report energy, water, and emissions data. |
| Connecticut | SB01292 (2025) | Joint Favorable Substitute 2025-03-18; filed with Legislative Commissioners' Office and reported out 2025-04-07 with File No. 538 and Senat… | 2025-04-07 | …ll would require AI data center quarterly reports and DEEP energy and water efficiency regulations; substitute bill would require a state study of AI data center energy efficiency requirements. |
| Delaware | SB 205 | No further action recorded after being reported Out of Committee to the Ready List on 2026-03-11; died with the 153rd General Assembly's se… | 2026-03-11 | …nsmission certificate, add distribution-company requirements, and add water-supply review. |
| Florida | CS/CS/HB 1007 (2026) | Laid on table 2026-03-11; substance moved via companion CS/CS/SB 484, which was enacted as Ch. 2026-65 | 2026-03-11 | …y requirements for certain data centers, PSC large-load tariff rules, water-permit limits, and reclaimed-water provisions. |
| Florida | CS/CS/SB 484 (2026) | Approved by Governor 2026-05-07; Chapter No. 2026-65, effective 2026-07-01 | 2026-05-07 | …llows curtailment for grid stability; creates large-scale data center water-permit requirements; requires hearings for certain consumptive use applications; authorizes reclaimed-water requirements; directs OPPAGA study. |
| Georgia | SB 421 (2026) | Died at sine die 2026-04-02; last action Senate Read and Referred 2026-01-27, no committee action recorded | 2026-01-27 | …nter Transparency Act"; would address transparency around utility and water-use data and local nondisclosure agreements (per bill capture at legis-ga-gov-legislation-72340.md). |
| Idaho | H0609 (2026) | Introduced 2026-02-09; reported printed and referred to House Revenue & Taxation 2026-02-10; no further action recorded; died at 2026 sine… | 2026-02-10 | …rowed data center tax exemptions, added electricity cost-recovery and water-notice qualification criteria, prevented stacking with the new capital investment property tax exemption, and added a 2036 sunset review. Not a… |
| Idaho | H0895 (2026) | Passed House 58-10-2 (2026-03-20) and Senate 32-1-2 (2026-03-31); signed by Governor 2026-04-02; Session Law Chapter 291; effective 2026-07… | 2026-04-02 | …ata centers beginning construction on or after 2026-07-01 may not use water for cooling as a consumptive use unless supplied by a municipal, water district, or water and sewer district water system. Legislative findings… |
| Idaho | H0897aaS (2026) | Passed House 68-0-2 on 2026-03-23; passed Senate as amended 34-0-1 on 2026-04-01; returned to House and referred to Revenue & Taxation for… | 2026-04-02 | …uired utility cost recovery for new qualifying data centers, required water-consumption notice to local water providers and IDWR, required annual forgone-sales-tax reports, and required 5-year reports on jobs, investment… |
| Illinois | HB5513 (Hyperscale Data Centers / POWER Act companion) | Assigned to Executive Committee 2026-02-24; re-referred to House Rules Committee (Rule 19(a)) 2026-03-27; co-sponsors continued to be added… | 2026-05-27 | House companion to SB4016 with environmental, water, energy, public-benefit, reporting, and solar permitting provisions. |
| Illinois | SB2181 (Data Center Reporting) | Moved to Executive Committee 2026-01-27; to AI and Social Media Committee 2026-02-04; amendment filed 2026-03-31; committee deadline chain… | 2026-05-22 | Creates Illinois Data Center Energy and Water Reporting Act; annual energy and water reporting to IPA; IPA ratepayer-impact study; confidentiality, public access, enforcement, and penalties. |
| Illinois | SB3120 (DCEO-Data Centers) | To AI and Social Media Committee 2026-02-18; committee deadline chain extended 2026-03-27 to 2026-04-24 to 2026-05-15 to 2026-05-22; re-ref… | 2026-05-22 | Conditions data center incentive qualification on water stewardship strategy disclosure and requires DCEO reporting on recipient water stewardship strategies. |
| Illinois | SB3761 (Data Centers-Various) | To AI and Social Media Committee 2026-02-25; Rule 2-10 deadline chain extended 2026-03-27 to 2026-04-24 to 2026-05-15 to 2026-05-22; re-ref… | 2026-05-22 | …0-day preconstruction disclosure to ICC, public meeting requirements, water-use disclosures to DNR, penalties up to $10,000 per violation, and utility tariff review. |
| Illinois | SB3830 (Data Centers-Various) | To AI and Social Media Committee 2026-02-25; Amendment No. 2 filed 2026-04-27; Rule 2-10 deadline chain extended 2026-03-27 to 2026-04-24 t… | 2026-05-22 | Similar clean energy self-direct and utility tariff framework; adds water discharge pollutant identification, DNR water-use disclosure, Water Use Act changes, and groundwater emergency provisions. |
| Illinois | SB4004 (Aquifer Protection Act) | To AI and Social Media Committee 2026-02-25; Rule 2-10 deadline chain extended 2026-03-27 to 2026-04-24 to 2026-05-15 to 2026-05-22; Senate… | 2026-06-17 | Creates Data Center Water Transparency and Aquifer Protection Act; bars data centers from using Mahomet Aquifer water beginning 2027; bars permits for Mahomet withdrawals… |
| Illinois | SB4016 (Hyperscale Data Centers / POWER Act) | To AI and Social Media Committee 2026-02-25; Rule 2-10 deadline chain extended 2026-03-27 to 2026-04-24 to 2026-05-15 to 2026-05-22; re-ref… | 2026-05-30 | …eview, public notice, community benefit agreements, NDA restrictions, water-impact permits, quarterly water reporting, water scarcity plans, energy and water reporting to ICC, hyperscale self-direct program, funds suppor… |
| Indiana | HB 1043 | Died without a committee hearing in House Natural Resources; session adjourned sine die 2026-02-27 with no further action recorded. | 2026-01-08 | Would require data center water regulation through a DNR consumption permit framework before operation. |
| Indiana | HB 1297 | Died before receiving a hearing in House Utilities, Energy and Telecommunications; session adjourned sine die 2026-02-27. | — | Water Intensive Facilities: would have authorized Indiana to deny economic incentives to data centers and other large industrial water users unless fa… |
| Indiana | HB 1406 | Enacted as Public Law 162; received by the Governor 2026-03-06 and signed 2026-03-12. | 2026-03-12 | …with IEDC, to study data center tax incentives, utility-cost impacts, water-supply impacts, and environmental impacts, with report due to the interim study committee on fiscal policy by 2026-11-01. |
| Iowa | HF2001 (2026) | Died in House Commerce Committee (no action after introduction 2026-01-13); 2026 Sine Die 2026-05-03 | 2026-01-13 | Would require water-efficient cooling technology for new data centers, encourage nonpotable and recycled water, require reporting, and authorize penalties. |
| Iowa | HF2447 / HF2690 (2026) | Died in House Commerce Committee after amendments filed 2026-03-12 as HF2690; no floor vote before 2026 Sine Die 2026-05-03 | 2026-03-12 | Would require quarterly water and energy reports, DNR and Iowa Utilities Commission publication, and a separate electric service classification and tariff for data centers to… |
| Kansas | HB 2433 floor amendment (2026) | Sen. Michael Murphy's Committee of the Whole floor amendment (carrying data-center-moratorium-style language) was ruled germane and then re… | 2026-03-12 | …ter moratorium language similar to SB 531 as an amendment to a county water-authority bill; Wichita Eagle reported 12-22 floor vote; [VERIFY exact vote-journal entry from Senate Journal of 2026-03-12]. |
| Kansas | SB 400 (2026) | Died in Committee 2026-04-10 (Senate Committee on Utilities); last substantive action before that was referral to committee on 2026-01-28. | 2026-04-10 | Would require data centers to use closed-loop cooling systems to mitigate water consumption. |
| Kentucky | HB 593 (2026 RS) | Passed House 2026-03-04 (90-8); died in Senate committee at 2026 RS sine die (2026-04-15); last recorded action 2026-03-31 | 2026-03-31 | …rce rules for large loads, and protections against shifting electric, water, wastewater, and gas infrastructure costs to other customers. |
| Kentucky | SB 319 (2026 RS) | Died in Senate Committee on Committees at 2026 RS sine die (2026-04-15); last recorded action 2026-03-02 | 2026-03-02 | …agricultural land within the prior 10 years, and would add energy and water efficiency engagement terms to incentive agreements. |
| Kentucky | SB 330 (2026 RS) | Died in Senate Committee on Committees at 2026 RS sine die (2026-04-15); last recorded action 2026-03-02 | 2026-03-02 | …re disclosure of project owner, location, incentives, utility demand, water use, infrastructure upgrades, and mitigation commitments. |
| Louisiana | HB1206 (2026 RS) | Died in House Natural Resources and Environment Committee; last action was committee consideration 2026-04-28, no report issued; 2026 RS ad… | 2026-04-28 | Would define data centers at 100 MW or more, require water permits for facilities exceeding 100 million gallons per year, require quarterly water-use reports, require parish notice and public hearings be… |
| Louisiana | HCR61 (2025 RS) | Adopted by House 93-0 on 2025-06-08; received by Senate same day but never brought up for concurrence -- returned to Senate calendar subjec… | 2025-06-09 | …onsultation for data centers and natural resource planning, including water and energy impacts. |
| Michigan | SB 761 (2025) | Introduced 2025-12-18; referred to Senate Committee on Energy and Environment; no further action as of 2026-07-31 | 2025-12-18 | Prohibits water withdrawal permits for users averaging over 2,000,000 gallons/day for consumptive use. |
| Michigan | SB 762 (2025) | Introduced 2025-12-18; referred to Senate Committee on Energy and Environment; co-sponsors added 2026-06-24 and 2026-07-01; still pending,… | 2026-07-01 | Requires data-center energy and water usage reporting through amendment to MCL 460.5a. |
| Michigan | SB 763 (2025) | Introduced 2025-12-18; referred to Senate Committee on Energy and Environment; co-sponsors added 2026-06-24 and 2026-07-01; still pending,… | 2026-07-01 | Bars water utilities from passing data center infrastructure costs onto residential customers. |
| Minnesota | 2025 1st Special Session HF 16 / Chapter 12 | Approved by Governor 2025-06-14, 2025 1st Special Session Chapter 12 | 2025-06-14 | …ed a statewide data-center regulatory package. Key provisions include water preapplication review for data centers proposing more than 100,000,000 gallons per year of consumptive use, permit conditions for large water ap… |
| Minnesota | HF 3793 (2026) | Died in House Environment and Natural Resources Finance and Policy Committee (last log entry: author added 2026-05-13); Sine Die 2026-05-18 | 2026-05-13 | Would require certain users of large amounts of groundwater to apply for their own water-use permit instead of modifying an existing municipal permit. Data centers are one target use in captured hea… |
| Minnesota | SF 4298 / HF 4888 (2026) | Died in committee, both chambers (SF4298 no action after referral 2026-03-09; HF4888 last co-author added 2026-05-05); Sine Die 2026-05-18 | 2026-05-05 | …with possible extension to 2028-01-01. Report topics include energy, water, metals, localized impacts, listed species, Tribal treaty rights, economic impacts, suitable locations, and public comment. |
| Minnesota | SF 5100 (2026) | Died in Senate Energy, Utilities, Environment, and Climate Committee (no action after referral 2026-04-13); Sine Die 2026-05-18 | 2026-04-13 | Would modify water preapplication evaluation criteria, solar standard treatment, qualified large-scale data center fees, electricity tax treatment, and energy gene… |
| Mississippi | SB3410 (2026) | Approved by Governor 2026-04-08; enacted as Chapter 936, Laws of 2026, effective upon passage | 2026-04-08 | …h data center or related technology facility developers/operators for water and wastewater infrastructure, reclaimed water delivery, wastewater treatment, capacity guarantees, assignment rights, rates, and terms up to 30… |
| Missouri | HB 2239 (2026) | Referred to House Emerging Issues Committee 2026-05-15 (last recorded action, the day of constitutional adjournment); no hearing was ever s… | 2026-05-15 | …ater IT load and major expansions; requires closed-loop or equivalent cooling, annual environmental and health reports, water and air monitoring, public health complaint reporting, and penalties. |
| Missouri | HB 3362 (2026) | Public Hearing Completed in House Conservation and Natural Resources Committee 2026-03-30 (last recorded action); no committee vote, Do Pas… | 2026-03-30 | …ns, new generating capacity, or infrastructure upgrades; also creates water-resource protections. |
| Missouri | HB 3364 (2026) | Public Hearing Completed in House Conservation and Natural Resources Committee 2026-03-30 (last recorded action); no committee vote, Do Pas… | 2026-03-30 | …mpanion or related industrial utility user bill with major industrial water-user permit language. |
| Missouri | HB 3390 (2026) | Referred to House Emerging Issues Committee 2026-05-15 (last recorded action, the day of constitutional adjournment); no hearing was ever s… | 2026-05-15 | …oval, ratepayer cost-shift, incentive affidavit, and major industrial water-user permit provisions. |
| Montana | HJ46 / LC0933 | Passed House 2025-04-16; tabled in Senate committee 2025-04-24; died in standing committee 2025-05-22 | 2025-05-22 | …mpacts on grid adequacy, electric rates, stranded utility investment, water demand, affordability, and regulatory safeguards. Not a moratorium bill. |
| Nebraska | LB1010 (2026) | Enacted; approved by Governor on 2026-04-14 (passed Final Reading 49-0-0 on 2026-04-10). | 2026-04-14 | …ailment procedures, annual data center reports on electricity demand, water use, incentives, energy measures, renewable commitments, and service life, plus decommissioning-cost responsibility and community benefit agreem… |
| New Jersey | A3966 (2026-2027) | Reported from Assembly Environment and Solid Waste Committee with amendments and referred to Assembly Appropriations Committee, 2026-03-16;… | 2026-03-16 | …DEP to study short- and long-term effects of large-scale data center water use. |
| New Jersey | A5294 / S4402 (2026-2027) | Introduced 2026-06-18, referred to Assembly Science, Innovation and Technology Committee | 2026-06-18 | …ewide framework governing siting, land use approval, energy sourcing, water use, and environmental impacts of large-load data center development. This is the most comprehensive data-center siting/regulation bill of the 2… |
| New Jersey | S3379 / A4096 / A4696 (2026-2027) | S3379 amended and passed the Senate, then amended in Assembly Telecommunications and Utilities, substituted for A4096, and passed both hous… | 2026-06-30 | Requires semi-annual data center water and energy usage reports to BPU for three years, with performance metrics for data centers receiving state incentives. |
| New Jersey | S4293 (2024-2025) | Passed both houses 2025-06-30; conditionally vetoed 2025-10-20; the 221st Legislature adjourned in January 2026 without the Legislature eve… | 2025-10-20 | Would require data center owners and operators to report water and energy usage to BPU. |
| New Mexico | HM 45 (2026), Importance of Water in Taos | Referred to House Agriculture, Acequias and Water Resources Committee 2026-02-03; Action Postponed Indefinitely; memorial not adopted befor… | 2026-02-03 | Memorial requesting Water Quality Control Commission attention to a Taos County produced-water petition. Findings expressly state that AI, quantum computing, and data cen… |
| New York | S6394A / A9086A (2025-2026) | S6394 amended to print B and recommitted to Senate Energy and Telecommunications on 2026-05-30; A9086 amended to print B and recommitted to… | 2026-06-01 | …uires data center disclosure reporting, public engagement, energy and water reporting, renewable-energy requirements, and surcharge or discount mechanisms tied to affordability and grid impacts. |
| Ohio | HB 646 | Passed House 97-0 on 2026-03-18; Senate Energy Committee reported and then recommitted the bill to itself on 2026-06-10; no further Senate… | 2026-06-10 | …udy Commission to study environmental impacts, grid and rate effects, water and wastewater, noise, light, local economy, farmland, national security, and opposition messaging; report due within six months if enacted. |
| Ohio | HB 784 | Introduced 2026-03-24; referred to House Energy Committee on 2026-03-25; no further action as of 2026-07-31. | 2026-03-25 | Requires monthly and yearly data center water consumption reporting and prohibits data center water-use information in nondisclosure agreements with political subdivisions. |
| Ohio | SB 378 | Introduced 2026-03-16; referred to Senate Public Utilities Committee on 2026-03-25; no further action as of 2026-07-31. | 2026-03-25 | Responsible Water Use by Data Centers Act; requires data centers to pay attributable water/sewer infrastructure costs, creates water-use permitting/reporting, and… |
| Oklahoma | HB 3394 (2026) | Died in House committee; last action 2026-02-12 (referred to Energy and Natural Resources Oversight/Energy) | 2026-02-12 | …nd reporting for hyperscale data centers, including electric load and water-use information. |
| Oklahoma | SB 1488 (2026) | Died in Senate Appropriations Committee; last action 2026-04-14 (House principal author added) | 2026-04-14 | …01 and direct the Oklahoma Corporation Commission to study impacts on water supply, utility rates, land use, property values, and other issues. |
| Oklahoma | SB 259 (2026) | Enacted; approved by Governor on 2026-05-20 | 2026-05-20 | Groundwater metering/permitting bill (originally introduced 2025-02-03, carried into the 2026 session of the same 60th Legislature), amended by commit… |
| Oregon | HB 3698 (2025) | Died in House Climate, Energy, and Environment Committee upon 2025 Regular Session adjournment sine die (2025-06-27); not enacted | 2025-06-27 | Would require data centers to report quarterly water and electricity use to state agencies, require ODOE to publish summaries, and direct EQC to adopt emissions standards for standby generators use… |
| Pennsylvania | HB2150 | Passed House 133-68 on 2026-04-13; referred to Senate Environmental Resources and Energy Committee 2026-04-23; no further Senate action thr… | 2026-04-23 | Requires annual energy and water consumption reporting by data centers and imposes penalties. |
| Pennsylvania | HB2246 | Passed House 116-84 on 2026-04-27; referred to Senate Environmental Resources and Energy Committee 2026-05-01; no further Senate action thr… | 2026-05-01 | Amends Title 27 water resources provisions for covered data centers; requires water-use review/reporting for facilities with proposed consumptive use above 100,000 ga… |
| Rhode Island | H7331 (2026) | Committee recommended measure be held for further study, 2026-04-07 (dead for 2026 session; no further action through 2026-07-31) | 2026-04-07 | …re costs; bars cost recovery from non-data-center customers; requires water-use reports and possible water-efficiency plans. |
| Rhode Island | S2776 (2026) | Committee recommended measure be held for further study, 2026-03-10 (dead for 2026 session; no further action through 2026-07-31) | 2026-03-10 | …to H7331, with 50 MW threshold, electric cost-allocation provisions, water reporting, and site-restoration assurance. |
| South Carolina | H. 4583 (2026) | Prefiled 2025-12-16; introduced and read first time 2026-01-13; referred to House Labor, Commerce and Industry Committee; sponsors White, R… | 2026-02-18 | …bars state and local taxpayer-funded incentives, requires closed-loop water or liquid cooling with zero net water withdrawal and discharge, imposes strict liability and insurance/bonding, and sets employment/reporting re… |
| South Carolina | S. 724 (2026) | Prefiled 2025-12-10; introduced and read first time 2026-01-13; referred to Senate Judiciary Committee; no further action as of 2026-07-31 | 2026-01-13 | Requires annual water-use reporting to DES for commercial data centers with 100 MW or greater peak demand that use 3 million or more gallons per month; includes audit… |
| South Carolina | S. 784 (2026) | Introduced and read first time 2026-01-13; referred to Senate Judiciary Committee; scrivener's error corrected 2026-01-14; no further actio… | 2026-01-14 | …minimum billing, termination cost recovery, collateral, PSC approval, water reporting, and data center tax-exemption cutoff revisions. |
| South Carolina | S. 867 (2026) | Introduced 2026-01-29; referred to Senate Agriculture and Natural Resources Committee; favorable committee report 2026-04-28; scrivener's e… | 2026-05-06 | …es a DES Data Center Development Office, tiered state siting permits, water-efficiency standards, infrastructure adequacy review, environmental review, decommissioning/financial assurance, noise/light/vibration controls,… |
| South Carolina | S. 902 (2026) | Introduced and read first time 2026-02-10; referred to Senate Judiciary Committee; no further action as of 2026-07-31 | 2026-02-10 | …edures, intervention rights, environmental and infrastructure review, water and operational efficiency standards, annual reporting, decommissioning, and utility cost-allocation safeguards. |
| South Dakota | HB 1005 (2026) | Deferred to the 41st legislative day by House State Affairs on 2026-02-04 (Yeas 9, Nays 3); no further action recorded (bill died). | 2026-02-04 | …sed in qualified data centers, with investment and job thresholds and water-provider notice. |
| South Dakota | SB 128 (2026) | Deferred to the 41st legislative day by Senate State Affairs on 2026-02-18 (Yeas 5, Nays 3); no further action recorded (bill died). | 2026-02-18 | Would have updated large-use customer utility rules, imposed water-provider notice and closed-loop cooling requirements on data centers, and required quarterly water reporting. |
| South Dakota | SB 135 (2026), Data Center Bill of Rights for Citizens | Passed Senate 60-7 and House 11-0 (amended); Senate concurred in House amendments 33-1 on 2026-03-10; signed by Gov. Larry Rhoden on 2026-0… | 2026-03-30 | …ption of local data center ordinances and resolutions; requires local water-provider compatibility determinations and semiannual water reporting. |
| South Dakota | SB 234 (2026) | Deferred to the 41st legislative day by Senate State Affairs on 2026-02-18 (Yeas 5, Nays 4); no further action recorded (bill died). | 2026-02-18 | …s from sales and use tax, subject to utility cost-shift avoidance and water-provider notice. |
| South Dakota | SB 235 (2026) | Do Pass Amended failed 4-5 in Senate State Affairs, then deferred to the 41st legislative day 5-4 on 2026-02-18; no further action recorded… | 2026-02-18 | Amendment would have combined data center cost-allocation and water provisions with a 100 MW data center threshold; original bill also addressed purchasing and tax treatment. |
| Tennessee | HB2061 / SB1682 | SB1682 failed in Senate Commerce & Labor Committee for lack of a second 2026-03-03; HB2061 taken off notice in House Business & Utilities S… | 2026-03-11 | …ata centers over 20 MW to register with TPUC and require electric and water utilities to report usage and rates for public monthly reports. |
| Tennessee | HB2392 / SB2653 | HB2392 taken off notice in House Agriculture & Natural Resources Subcommittee 2026-03-18; SB2653 stalled in Senate Commerce & Labor General… | 2026-04-07 | …r Impact Review Act." Would require data centers over 20 MW to obtain water and wastewater operator board permits and report water source, daily/peak/annual water use, cumulative impacts, drought planning, reuse, wastewa… |
| Tennessee | HB2456 / SB2112 | HB2456 failed in House Business & Utilities Subcommittee 2026-03-18 (2 ayes-5 noes); SB2112 stalled in Senate State & Local Government Gene… | 2026-03-24 | …rtment of Revenue and require fuel suppliers, electric utilities, and water utilities to report fuel, electricity, water usage, and rates. |
| Utah | HB0076 (2026) | Passed House 2026-01-29 (72-0-3, as substituted); Senate committee substituted/favorably recommended 2026-03-03; failed initial Senate floo… | 2026-03-23 | Data Center Water Transparency Amendments. Requires notice and water reporting for certain large data centers, including pre-construction communication with water… |
| Vermont | H.727 (2025-2026) | Passed House and Senate, vetoed by Governor Scott, veto sustained on House reconsideration vote (Yeas 83, Nays 52; 90 Yeas of 135 needed to… | 2026-05-29 | …mand management provisions, energy efficiency consultation, quarterly water and energy reporting, Act 250 jurisdiction for data center construction, closed-loop cooling preference, water withdrawal permits, PFAS monitori… |
| Virginia | HB153 (2026) | Passed House 2026-01-29 (90-Y 7-N); incorporates HB511 (McAuliff) 2026-01-23; passed Senate with substitute 2026-03-11 (26-Y 14-N); confere… | 2026-04-13 | …more near homes or schools within 500 feet; allows optional review of water, agriculture, parks, historic sites, and forestland. |
| Virginia | HB1601 (2025) | Passed House 2025-01-23 (57-Y 40-N); passed Senate with substitute 2025-02-12; conference report agreed to 2025-02-22; enrolled 2025-03-07;… | 2025-05-02 | …s, with mandatory noise review within 500 feet and optional review of water, agriculture, parks, historic, and forest impacts. |
| Virginia | HB338 (2024) | Passed House 2024-02-13 (55-Y 42-N); Senate continued the bill to 2025 in General Laws and Technology (9-Y 3-N 3-A) 2024-02-28; Left in Gen… | 2024-11-19 | …before data center siting approvals; House-passed version focused on water use and carbon emissions. |
| Virginia | HB496 (2026) | Passed House 2026-02-17 (74-Y 23-N); passed Senate with substitute 2026-03-04 (25-Y 15-N); conference report agreed to 2026-03-14; enrolled… | 2026-04-13 | Requires registered water users that provide offsite water to report potable and reclaimed water volumes supplied to data centers with DEQ air permits, along with other u… |
| Virginia | SB552 (2026) | Prefiled 2026-01-14; referred to Senate Agriculture, Conservation and Natural Resources; failed to report (defeated) there (7-Y 7-N) 2026-0… | 2026-02-02 | …viewed site assessments, public hearings, standards for noise, light, water, air, traffic, and proximity impacts, civil penalties, and enforcement authority for large data centers. |
| Virginia | SB553 (2026) | Passed Senate 2026-02-09 (25-Y 15-N); passed House with substitute 2026-03-02 (81-Y 18-N); conference report agreed to 2026-03-14; enrolled… | 2026-04-13 | Companion / identical enacted water-reporting bill. |
| Washington | HB 2515 (2025-26) | Passed House 2026-02-14 (51-41) with floor amendments; in Senate referred to Environment, Energy & Technology then Ways & Means; returned t… | 2026-03-12 | …e demand, including utility tariffs/policies, cost-shift protections, water and energy reporting, clean-energy requirements, demand response, and a 0.5 cent/kWh ELEUF fee. |
| West Virginia | HB 4832 (2026) | Introduced and referred to House Energy and Public Works 2026-01-26; no further action; died at 2026-03-14 sine die adjournment | 2026-01-26 | Would designate data centers as high-volume water users, require high impact data center water-use reporting, and authorize limits on withdrawals that would adversely affect state water resource… |
| West Virginia | HB 5590 (2026) | Introduced and referred to House Energy and Public Works 2026-02-16; no further action; died at 2026-03-14 sine die adjournment | 2026-02-16 | Would create a water-quantity disclosure and review framework for high impact data centers, including pre-construction public notice and annual actual-use reporting. |
| Wisconsin | AB722 / SB729 | AB722 introduced 2025-12-03 (Assembly Energy and Utilities); SB729 introduced 2025-12-02 (Senate Utilities, Technology and Tourism, public… | 2026-04-06 | …ees, very large customer class, renewable tariff, building standards, water reporting, labor standards, data center energy reporting, and rulemaking. |
| Wisconsin | AB840 / SB843 | AB840 introduced 2026-01-09, passed Assembly 2026-01-20 (53-44, Assembly Substitute Amendment 1 adopted); received by Senate, committee rec… | 2026-03-23 | …tions, onsite or directly accessible renewable resources, closed-loop cooling, annual water reporting, bonding, and reclamation for large data centers. |
| Wisconsin | SB1061 / AB1099 | SB1061 (statewide data center moratorium, creating Wis. Stat. 134.44) introduced 2026-02-26, referred to Senate Utilities, Technology and T… | 2026-03-23 | …a planning authority, cost-shift protections, subsidy limits, public water and power reporting, pollution safeguards, renewable energy requirements, labor standards, NDA limits, local referendum approval, and enforcemen… |
State water rules for a new large user
Orientation only, not legal advice. Water law changes and is applied basin by basin; confirm with the state water agency and a water attorney. A state missing from this list has not been researched yet.
Alabama
Who regulates: ADECA Office of Water Resources (OWR) for withdrawal registration; ADEM handles separate matters such as NPDES/wastewater discharge and air permits.
How a new large user gets water: A facility with the capacity to withdraw 100,000 gallons/day or more (threshold read directly from ADECA's own water-management page) must file a Declaration of Beneficial Use with OWR, one per withdrawal/diversion point (separate forms for surface water and groundwater). OWR then issues a Certificate of Use (not a permit) listing the registered withdrawal points; certificate holders must report actual withdrawal, diversion and consumption volumes to OWR annually. All public water systems must register regardless of volume. Filing is through OWR's 'eWater' portal. A user must separately coordinate with ADEM and/or the US Army Corps of Engineers as applicable; OWR registration does not substitute for those. The underlying statute (Code of Alabama Title 9, Chapter 10B) and administrative rule (ADECA Admin Code Ch. 305-7-9) were cited in search summaries, not opened in full text.
Data centers: No Alabama-specific water statute or regulation aimed at data centers was found, and no 2026-session bill creating one (this was not an exhaustive legislative search). Local water-capacity friction is emerging as a real issue: Rogersville's water board (Lauderdale County, TVA territory) has stopped issuing new construction water meters because the system is at capacity, citing data-center speculation, even though no company has confirmed concrete plans there.
Checked 2026-11-02 · medium confidence. Sources: ADECA: Water Management · Alabama Administrative Code Ch. 305-7-9, Water Use Reporting Program (not opened in full) · WAFF: Rogersville considering pause on data center development as water system hits capacity
Arkansas
Who regulates: Arkansas Natural Resources Commission / Natural Resources Division (part of the Arkansas Department of Agriculture)
How a new large user gets water: Read directly from the Commission's own fact sheet: Act 81 of 1957 requires annual registration of all surface-water diversions above 1 acre-foot/year (325,851 gal/yr); Act 1051 of 1985 requires annual registration of all non-domestic groundwater withdrawals from wells with a maximum potential flow rate of 50,000 gallons/day or more (reporting window Oct 1-Mar 1, 0/yr fee per Act 154 of 1991). A new large user registers and pays the fee -- there is no permit-to-use step unless the well falls inside a Commission-designated Critical Ground Water Area, where Act 154 lets the Commission require a water right; outside such areas there is no cap on withdrawal and no approval/denial step.
Data centers: No Arkansas data-center-specific water statute, rule, or pending bill found.
Checked 2026-11-06. Sources: Arkansas Natural Resources Commission: Water-use Registration Program fact sheet (Act 81/1051/154) · Arkansas Dept. of Agriculture, Natural Resources Division: Water Use Registration (non-agricultural usage)
Arizona
Who regulates: Arizona Department of Water Resources (ADWR)
How a new large user gets water: Inside Active Management Areas (Phoenix, Prescott, Tucson, Pinal, Santa Cruz, Douglas, Willcox) groundwater use is restricted and large users typically rely on a designated provider or existing grandfathered rights. Rural groundwater outside AMAs is largely unregulated. Not confirmed from ADWR pages (403). UPDATE (2026-11-01): KJZZ reports a Morrison Institute (2025) study found at least nine Arizona water utilities have adopted their own 'large-volume water user' ordinances that impose added conditions on their biggest customers generally -- not data-center-specific, and the article does not name the utilities or the conditions. Checked while researching a NeoTeo piece on Phoenix data-center water estimates; that piece's own underlying figure (a Ceres study projecting a national/regional rise to 14.5B gal/yr at power plants) is not Phoenix-specific and was not added here as not citable to a concrete AZ number.
Data centers: No enacted AZ water law on data centers found. Cooling-water caps HB 2467 and HB 2820, audit bill HB 2738 all failed per WSWC report (June 2026).
Checked 2026-11-01 · low confidence. Sources: KJZZ (news, last resort): What is an AMA · WSWC Data Centers Topical Report June 1 2026 · KJZZ: Arizona data centers drive up water demand, but not the way you might think
California
Who regulates: California State Water Resources Control Board (water rights, generally); California Energy Commission (CEC) and local land-use agencies for the new data-center reporting laws.
How a new large user gets water: Not researched this cycle beyond the data-center-specific laws below.
Data centers: Gov. Newsom signed a package of seven data-center bills on Sept 21, 2026 (date read directly from the Ballard Spahr legal alert; leginfo.legislature.ca.gov itself returned 403 on three direct attempts this cycle -- billTextClient, billHistoryClient and billStatusClient URLs for AB 1577 -- so the Legislature's own bill-status page could not be reached and this is sourced to secondary legal-alert/news coverage instead, as noted in each source below). AB 1577 (Bauer-Kahan) as enacted is described by the Ballard Spahr alert as an ENERGY reporting bill: data centers with 10kW+ load must report location/size, power usage effectiveness, and onsite-generator fuel use to the CEC, and disclose expected annual energy consumption and sound levels to local land-use agencies when seeking discretionary approval -- the alert does not describe a water-reporting duty under the enacted AB 1577. (Note: an April 8, 2026 Assembly Utilities & Energy Committee analysis of an earlier amended version of AB 1577, read directly, did include monthly water-consumption and 'water usage effectiveness' reporting to the CEC -- that appears to have been narrowed out of AB 1577 and moved to companion bills by enactment.) The water-specific pieces of the Sept 21 package are AB 2469 and AB 2619 (per BHFS and WaterWorld, not independently read): proposed data centers must disclose to local governments/water suppliers their water consumption, available water supply, water-efficiency measures and drought planning, assess impacts on local supply, and pay for any needed system upgrades.
Checked 2026-11-01 · medium confidence. Sources: Assembly Utilities and Energy Committee analysis of AB 1577 (Bauer-Kahan), April 8, 2026 hearing (PDF) · Ballard Spahr: California Signs Sweeping Data Center Energy Laws · Brownstein Hyatt Farber Schreck: What California's New Data Center Laws Mean for Developers and Operators · WaterWorld: California enacts new water disclosure requirements for data centers
Colorado
Who regulates: Division of Water Resources / State Engineer; Colorado Ground Water Commission (Designated Basins); water courts for decrees
How a new large user gets water: No new data-center-specific path. Usually buy water from a municipal/district provider or acquire and change an existing right via water court. New wells need a State Engineer permit; Designated Basins (8, eastern plains) are permitted by the Ground Water Commission.
Data centers: No enacted Colorado data-center-specific water law. Both 2026 session bills died: HB26-1030 (Colorado Data Center Development Authority + 100% sales/use tax exemption on qualified purchases for 20 years) was postponed indefinitely by the House Energy and Environment Committee 11-2 on May 7, 2026; its Senate companion SB26-102 (would have set 30MW single-facility / 60MW combined "large-load" data-center thresholds, required DPHE electricity/water-use reporting starting 2028, and other requirements) was postponed indefinitely by the Senate Transportation & Energy Committee on May 11, 2026 after an earlier amendment failed in committee Mar 18, 2026. Local moratoria exist (Denver, Logan, Larimer) per news.
Checked 2026-11-06 · medium confidence. Sources: CSU Water Knowledge - Groundwater Rights · WSWC Data Centers Topical Report June 1 2026 · BillSponsor: Colorado SB26-102 (2026) full history · Colorado Newsline: Both Colorado data center bills rejected in final days of 2026 legislative session
Connecticut
Who regulates: Connecticut Department of Energy and Environmental Protection (DEEP).
How a new large user gets water: A new large water user generally needs a DEEP diversion permit. Individual permits require DEEP to find the diversion 'necessary,' consistent with the state's long-range water resource plan, and not harmful to the environment or other water users; individual permits run up to 25 years. Lower-impact cases (e.g. withdrawals up to 250,000 gallons/day from surface water or an aquifer) can instead use a general permit under SS22a-378a ('authorization required'). The annual fee for a consumptive-use permit is $750 (SS22a-379). This run relied on search-engine-extracted content from DEEP's own fact sheets and public-notice pages, not a personally verified full-text fetch of the statute itself, so confidence is MEDIUM rather than HIGH.
Data centers: No Connecticut data-center-specific water rule found. A separate, more developed state track exists for electric-load tariffs (HB 5469, the colocated-large-load bill) but no water-specific data-center law or bill was identified this cycle; a CBIA (business lobby) reference to a pending bill that would newly require some existing large users to get DEEP diversion permits is general large-water-user legislation, not data-center-specific, and was not independently confirmed as to session/year.
Checked 2026-11-05 · medium confidence. Sources: CT DEEP: Water Diversion Policy Act permitting (fact sheet/public-notice pages)
Florida
Who regulates: Florida Dept. of Environmental Protection (DEP), which has general supervisory authority (s. 373.016(3)), plus the 5 regional water management districts (South Florida, St. Johns River, Southwest Florida, Suwannee River, Northwest Florida WMDs), which actually issue CUPs under s. 373.219(1) and their own rules (e.g. Fla. Admin. Code Ch. 62-41, 40C-2, 40E-2).
How a new large user gets water: A new large user applies for an Individual CUP from the water management district covering its site once use exceeds the district's permitting threshold (thresholds and exact application forms are set district-by-district; the 100,000 gallons/day figure recurs across districts for individual-permit review versus a general/no-notice permit for smaller use, but this run did not open a specific district's current threshold table). The applicant must show the withdrawal is reasonable-beneficial (an amount necessary for economic and efficient use, for a reasonable purpose), will not interfere with existing legal users, and is consistent with the public interest; districts may add criteria such as not causing harm to water resources or minimum flows/levels. Not independently read from a specific WMD's rule text this cycle -- the doctrine and process above come from a secondary synthesis of Florida Administrative Code citations (Cornell Law's mirror of Fla. Admin. Code R. 62-40.410 and 40C-2.301), not DEP's or a WMD's own page read directly.
Data centers: SB 484 (Ch. 2026-65, signed by Gov. DeSantis May 7, 2026, most provisions effective July 1, 2026; the land-use-authority provisions took effect immediately on signing). Read directly from the Governor's own press release (flgov.com): it creates a dedicated CUP review process for large-scale data centers, requires water management districts/DEP to deny a CUP to a large-scale data center where the proposed use would be harmful to the water resources of the area, allows/promotes reclaimed water as part of that permitting process, requires a major modification to be treated as a new application, and explicitly preserves local government zoning/permitting/land-use authority -- a locality may set stricter standards or reject a data center project outright. News coverage (DataCenterDynamics, GovTech, Fox35/Fox13, Broadband Breakfast) adds detail not confirmed directly from the primary text: a reported 50MW monthly-peak-load threshold for the reclaimed-water/conservation-plan/public-meeting requirements, a 100,000-gallons/day threshold triggering additional disclosure and a hearing, a bar on shifting data-center infrastructure costs to residential/small-business ratepayers, and a required OPPAGA study due 2027-07-01. The enrolled bill text itself (flsenate.gov) was not opened this cycle.
Checked 2026-11-05 · medium confidence. Sources: Florida Governor's Office: Governor DeSantis signs data center regulations (SB 484) -- read directly · DataCenterDynamics: Florida enacts data center law covering ratepayer protections, water use, and local zoning powers · GovTech: Florida bill creates data center guardrails for state · Cornell Law (Fla. Admin. Code mirror): Rule 62-40.410, Water Supply Protection and Management
Iowa
Who regulates: Iowa Department of Natural Resources (DNR)
How a new large user gets water: A new large industrial water user applies to Iowa DNR for a water-use permit once it crosses the 25,000 gallons/day threshold (confirmed by direct read of IAC 567-50.4, not just the secondhand DNR-geologist quote this was previously sourced to). Many Iowa data centers instead rely on a municipal water utility (e.g. West Des Moines Water Works), whose own permit then governs the aggregate draw.
Data centers: No Iowa-specific data center water statute was found; the legislature reportedly rejected a bill that would have required DNR to individually assess aquifer sustainability per withdrawal request (reported, not independently read). Jordan Aquifer rule, now read directly at IAC 567-50.11(2): Jordan aquifer water-use permits are issued on a five-year cycle (567-50.11(2)"d"), and new water withdrawals for industrial or power-generation use at a single plant location may not exceed 2,000 gpm (567-50.11(2)"b" -- the prior Sierra-Club-newsletter figure is confirmed correct). Palo's new EU-1 zoning ordinance (see docs/data/local-ordinances/IA.json) explicitly defers all water oversight to Iowa DNR rather than setting an independent local standard -- criticized by residents as inadequate. Microsoft's West Des Moines campuses use 2-7% of monthly water pumped by West Des Moines Water Works, peaking at ~11.5 million gallons/month (~6% of peak summer use); the utility imposed lawn-watering bans amid 2025-2026 drought stress and reportedly told Microsoft in 2023 it would only accept additional data centers if peak water use were significantly reduced. Microsoft says newer buildings use 'zero-water' cooling technology. UPDATE (2026-11-02, reported via Radio Iowa/aggregator): at an Oct. 22, 2026 public open house for Google's proposed Palo campus, Google gave new detail on jobs, taxes and construction but left water consumption and electricity demand unresolved -- no water study has been completed or released for the Palo site; see docs/data/planned-project-water.json for the project's own reported water figure.
Checked 2026-11-02. Sources: Iowa Administrative Code 567, Chapter 50 (Water Use Permits) -- read directly, rules 50.4 and 50.11(2) · Axios Des Moines: West Des Moines, insurance, finance, new industries, data center (Microsoft water-use figures) · KCRG: Palo data center ordinance defers water oversight to Iowa DNR
Idaho
Who regulates: Idaho Department of Water Resources (IDWR), which processes permit applications, issues permits/licenses, and decides protests
How a new large user gets water: Read directly, idwr.idaho.gov: a new large user files a permit application and fee with IDWR; staff do a completeness review; IDWR publishes notice in the county newspaper of the point of diversion, and others may protest within 10 days of the second notice; unresolved protests go to a hearing (a hearing officer's recommended order, then a final order from the IDWR director), which can take months to years; once a permit issues it sets a deadline to complete the appropriation, after which the holder files proof of beneficial use (confirmed by a field exam) and IDWR issues a license. An application seeking more than IDWR's typical benchmark rates must document the need. An application with no protests and no problems takes about 3 months.
Data centers: Idaho HB 895 (2026 session, Session Law Chapter 291; read directly from the Idaho Legislature's own bill page), signed Apr 2, 2026 and effective Jul 1, 2026, adds limitations on data centers' consumptive water use for cooling and directs IDWR to weigh the bill's legislative findings when evaluating new water rights for data centers; it passed the House 58-10-2 and the Senate 32-1-2. Secondary coverage (Idaho Capital Sun, Idaho Conservation League -- not independently opened this cycle) describes the core rule as: new data centers must be non-consumptive (e.g. closed-loop cooling) or must contract with existing Idaho water-right holders for supply, unless served by a municipal/public system. The full statute text and the IDWR implementation approach were not opened this cycle. Separately, Idaho Power's Schedule 20 and 2026's Idaho Code 61-335 large-load contract law (see this state's tariff entry) are not water-specific but govern the same large data center loads.
Checked 2026-11-04 · medium confidence. Sources: IDWR: Water Rights (process overview) · Idaho Legislature: H0895 (2026) bill page
Illinois
Who regulates: No single state agency issues a water-rights permit for a new large user; Illinois State Water Survey (ISWS) and Illinois Dept. of Natural Resources study/advise, and the Water Use Act lets Soil and Water Conservation Districts recommend emergency withdrawal restrictions. Not confirmed from a state agency's own permitting page.
How a new large user gets water: No general water-rights permit regime for a new large user was found; a new user typically contracts with a municipal/regional water utility or drills a well under the Water Use Act's reasonable-use rule. The Act requires notice of planned withdrawals above 100,000 gpd (agricultural, irrigation and domestic uses exempt); Lake Michigan diversions are separately capped and allocated under the Great Lakes Compact/US Supreme Court decree, not this Act.
Data centers: No Illinois data-center-specific water statute or permit found this cycle.
Checked 2026-10-31 · medium confidence. Sources: ISWS: Illinois Ground Water Law (PDF) · farmdoc illinois: Using Groundwater (summary of the Water Use Act of 1983)
Indiana
Who regulates: Indiana Department of Natural Resources (DNR), Water Rights and Use Section; Natural Resources Commission.
How a new large user gets water: Get water from a municipal utility, or register a significant water withdrawal facility (capable of withdrawing more than 100,000 gpd) within three months of completion and report annually (IC 14-25-7). Registration page describes no capacity permit.
Data centers: No enacted data-center water law found. HB 1043 (2026; DNR permit for data centers using 10M+ gal/month) was referred to House Natural Resources; HEC said 2/5/26 it got no hearing and had no clear path. Governor's statewide water inventory/plan reported due end of 2026 (search result only, not opened).
Checked 2026-10-28 · medium confidence. Sources: Indiana DNR - Significant Water Withdrawal Facility Registration · HEC - HB 1043 Data Center Water Regulation · The Reporter - Burton data center water permit bill (news, last resort)
Kansas
Who regulates: Kansas Department of Agriculture, Division of Water Resources (DWR), under the Chief Engineer.
How a new large user gets water: A new large (non-municipal-supply) industrial water user must apply for and obtain a Permit to Appropriate Water for Beneficial Use (DWR Form 1-100, filing fee required) before diverting water, unless it purchases treated water from an existing public supplier (a city or rural water district), in which case no separate DWR permit is needed by the end user. The Chief Engineer must deny a new permit application if the proposed use would impair existing water rights. New groundwater permits are unavailable in areas administratively 'closed' to new appropriation (common in western-Kansas groundwater management districts); there, the only path is to buy an existing water right and apply to change its use, place of use, or point of diversion, with the converted quantity capped at the original right's historical consumptive use. Once granted, a permit must be perfected by actually diverting and using the water for the authorized purpose within a set period, after which DWR issues a Certificate of Appropriation specifying the perfected amount.
Data centers: None confirmed directly. Search coverage referenced a DWR 'data center FAQ' (reportedly May 2026) classifying data-center cooling water as industrial use, but DWR's own site (agriculture.ks.gov) returned HTTP 403 on every attempt to open it, so this could not be verified firsthand. Locally, Finney County's April 2026 special-use-permit attachment for data centers requires a water-use feasibility study as a county (not state) requirement, and Butler County's pending Resolution 26-40 (read directly) would require a water-use feasibility study and mandate closed-loop cooling as a local zoning condition, not a state water-law requirement.
Checked 2026-11-03 · medium confidence. Sources: Foulston Siefkin LLP -- Water Rights · Kansas DWR -- Water Appropriation (exists but returned HTTP 403 on every attempt; not opened)
Kentucky
Who regulates: Kentucky Energy and Environment Cabinet (EEC), Department for Environmental Protection, Division of Water
How a new large user gets water: Read directly, Kentucky Revised Statutes and Kentucky Administrative Regulations: KRS 151.140 prohibits any person, business, industry, city, county, water district or other political subdivision from withdrawing, diverting or transferring public water from a stream, lake, groundwater source or other body of water without a permit from the cabinet, with exceptions for farm/household use (including irrigation), withdrawals below the regulatory threshold, water used by steam-generating plants of PSC-regulated/certificated utilities, and water injected underground in oil/gas production. 401 KAR 4:010 sets that threshold at an average withdrawal rate of more than 10,000 gallons per day (surface water, springs or groundwater); a withdrawal at or below that constant rate needs no permit, while an irregular withdrawal may still need one if it represents a significant share of the available supply or if the data is needed for water-resource planning. A permit issued more than six months before its effective date must include a project financing plan, a project schedule from funding approval to the start of withdrawals, and quarterly status reports. All permittees must record and report withdrawals (monthly, on DEP 0056/DEP 8058, or more often if the division requires it for impact, planning or data reasons). A data center's cooling-water withdrawal of more than 10,000 gal/day -- a low bar most qualifying projects under this routine's threshold would clear many times over -- would need a Division of Water withdrawal permit; neither statute nor regulation describes a separate or heightened process for a large industrial or data-center user.
Data centers: No enacted Kentucky statute or regulation is water-specific to data centers. HB 856 (introduced March 3, 2026) would have required data center operators to submit a water-feasibility study to the cabinet before operating and report annual water use (including cooling); it was referred to the House Natural Resources & Energy committee March 10, 2026 and did not pass before the session closed April 15, 2026. SB 319, which would have required water/energy-efficiency consultation with local officials as a condition of state tax-exemption agreements, was referred to committee March 2, 2026 and likewise did not pass. Separately (not a water-specific rule), Gov. Beshear's Aug. 6, 2026 executive order requires data-center developers to submit an energy plan to the EEC and directs the PSC to prevent utilities from shifting data-center-driven costs to other ratepayers; it does not impose a water-specific requirement.
Checked 2026-11-03. Sources: Kentucky Revised Statutes KRS 151.140 (water withdrawal permit requirement), read directly via FindLaw · 401 KAR 4:010 (water withdrawal permit criteria and reporting), read directly, Kentucky LRC · WKMS/WKYU: Kentucky data center regulations stripped from bill as legislative session closes
Louisiana
Who regulates: No single regulator. Candidates by water type/area: the Louisiana Office of Conservation (Dept. of Energy and Natural Resources) for designated critical groundwater areas; the Capital Area Ground Water Conservation Commission for groundwater in Capital Region parishes; the Sparta Groundwater Conservation District Commission for the Sparta Aquifer parishes in north Louisiana (relevant to the Caddo/Bossier/Shreveport data-center cluster); no dedicated statewide surface-water-withdrawal permitting regulator currently exists.
How a new large user gets water: Surface water: draw rights flow from riparian land ownership under the Civil Code; there is currently no statewide surface-water withdrawal permit requirement (a pending 2026 bill, HB1209, would create one; not confirmed passed). Groundwater outside a designated commission/critical area: effectively unregulated at the state level beyond standard well-driller licensing, with no permit or registration required purely by volume. Groundwater inside a CAGWCC-jurisdiction parish: a well expected to produce 50,000 gallons/day or more requires a CAGWCC permit, with plans ideally filed about 30 days ahead (figure from a secondary mirror of the Louisiana Administrative Code Title 56, Part V; the primary text returned 403/410 on direct fetch and was not independently opened). Groundwater inside a declared 'critical ground water area' (e.g., the Sparta Aquifer parishes, declared 2004-2005): no outright permit, but monthly usage reporting is required above a stated threshold for non-domestic wells (sourced to older compliance-report summaries, not the current order text).
Data centers: HB1206 (Rep. Joy Walters), read directly on the Louisiana Legislature's own site (legis.la.gov), is titled 'WATER/DRINKING WATER: Provides relative to permitting and reporting of water usage at data centers,' shown as 'Pending House Natural Resources - Considered 4/28/26.' Secondary reporting (not independently verified) describes the committee deferring it 11-0 on that date and a substitute version that would have the Dept. of Energy and Conservation oversee data-center water withdrawals above 100 million gallons/year. Related, not data-center-specific bills found on the legislature's site but not opened: HR20 (Caddo Lake industrial water-use study), HB1209 (general surface-water withdrawal framework), HB599 (bars selling Louisiana surface water out of state), HR315 (groundwater-conservation-district study for the Chicot, Southern Hills and Mississippi aquifers).
Checked 2026-11-02 · medium confidence. Sources: Louisiana Legislature: HB1206 bill information · Regulations.Justia: Louisiana Administrative Code Title 56, Part V (Capital Area Ground Water Conservation Commission) -- not opened directly, 403/410 on fetch · Justia: Louisiana Revised Statutes 9:1104, 2012 edition (not opened directly)
Massachusetts
Who regulates: Massachusetts Department of Environmental Protection (MassDEP).
How a new large user gets water: Any new water withdrawal over 100,000 gallons/day requires a Water Management Act ('WM-03') permit from MassDEP; MEPA environmental review is also triggered at the same 100,000 gallons/day threshold for new withdrawals, including volume increases at existing sources. Permits can run up to 20 years. This run could not get a direct fetch of mass.gov's own WM-03 program page (consistent HTTP 403 on repeated attempts) or the statute page, so this rests on search-engine-extracted snippets of the official text plus one trade-press secondary source, not a page personally opened and read in full -- confidence MEDIUM, not HIGH.
Data centers: No MA-specific data-center water permit track was found; a large new data center would go through the same generic WM-03 process as any other large industrial water user (MassDEP's published WM-03 decisions include renewals/transfers for industrial users, but none found for a data center specifically). Gov. Healey's Executive Order 658 (signed Sept 8, 2026, per secondary trade-press coverage, not independently opened) separately requires data centers over 25MW peak demand to show compliance with 'applicable state water, wastewater, and stormwater requirements' as a state-permitting condition, and reportedly directs MassDEP to publish municipal guidance for evaluating data center water/wastewater/stormwater impacts by Dec. 31, 2026 -- this is a permitting-process directive layered on the existing WM-03 regime, not a new water rule of its own.
Checked 2026-11-05 · medium confidence. Sources: Mass.gov: WM-03 Water Management Act withdrawal permits
Maryland
Who regulates: Maryland Department of the Environment (MDE), Water and Science Administration
How a new large user gets water: Any new withdrawal from state surface or groundwater requires an MDE Water Appropriation and Use Permit (valid up to 12 years, no application fee, ~18-month typical approval time per Maryland OneStop). MDE's own 'Water Appropriations or Use Permits' page (read directly) states the review standard as 'reasonable for the stated purpose' with 'no unreasonable impact on the resource or other users.'
Data centers: MDE's own Data Centers page (read directly) states there is no separate data-center-specific water-permit category: a data center needing cooling water must get a standard appropriation permit with explicit withdrawal limits, OR draw from a local utility operating under that utility's own existing permit. Per a July 29 2026 MDE briefing to Baltimore County staff (REPORTED, via a secondary summary of the briefing, not the briefing document itself): as of mid-2026 MDE had not yet issued any standalone appropriation permit specifically to a data center; large data-center water needs so far have been met via a county's existing appropriation (e.g. Quantum Frederick) or reclaimed wastewater. Executive Order 01.01.2026.16 ('Responsible Data Center' framework, Gov. Wes Moore, reported Sept 23-24 2026; the signed order text itself was not independently opened, so this part is REPORTED/secondary, not HIGH) reportedly applies to new data-center development of ≥25MW projected demand, creates a Data Center Accountability Task Force (confirmed via the Maryland State Archives manual page, read directly) and a public monthly Data Center Dashboard (not yet found live), and directs MDE to require proof of adequate water availability without harming existing users.
Checked 2026-11-01. Sources: MDE: Water Appropriations or Use Permits · MDE: Data Centers · Maryland Manual (State Archives): Maryland Data Center Accountability Task Force
Maine
Who regulates: Maine Department of Environmental Protection (DEP), Bureau of Land and Water Quality.
How a new large user gets water: Under Site Law, DEP must review, and can require a permit for, developments that may substantially affect the environment (a commonly-cited practical trigger is projects over 20 acres, per a secondary legal summary, not independently verified against the statute's exact acreage language); review weighs a proposed groundwater withdrawal's effect on state waters, on existing nearby users/wells, and cumulative effects with existing withdrawals, and substitutes for a separate Stormwater Management Law permit. Separately, the Water Withdrawal Reporting Program requires filing (confirmed directly from the Legislature's own current page for 38 M.R.S. S470-D, which shows no repeal and the most recent amendment as PL 2011 c.657) once withdrawals cross 20,000 gallons/day from a river/stream/brook or adjacent groundwater (lower, percentage-based threshold if the watershed exceeds 75 sq mi), or 50,000 gallons/day for groundwater more than 500 feet from surface water; filed reports are confidential, not public records. No fee to file.
Data centers: No Maine data-center-specific water statute or bill was found. LD 307 (the 20MW data-center moratorium bill) addressed electricity/permitting, not water; it passed both chambers but was vetoed by Gov. Mills on 2026-04-24, and the Legislature failed to override 2026-04-29. Water has come up only in local debate (developer claims at Jay that a data center would use 'far less water than the paper mill' it replaces, unverified; Scarborough councilors citing marsh/water-supply concerns; Wiscasset's disputed load estimate raising grid, not water, concerns) and in disputed developer marketing claims (e.g., Loring LiquidCool's 'zero water' immersion-cooling claim, not independently verified against an engineering filing).
Checked 2026-11-06 · medium confidence. Sources: Maine DEP: Site Location of Development Act ('Site Law') · Maine Legislature: 38 M.R.S. S470-D, Water Withdrawal Reporting Program (current text)
Michigan
Who regulates: Michigan Dept. of Environment, Great Lakes, and Energy (EGLE), Water Use Program.
How a new large user gets water: Municipal supply, or a new large quantity withdrawal (over 100,000 gpd capacity) run through the Water Withdrawal Assessment Tool and registered; failing the tool goes to EGLE site-specific review. Over 2 MGD needs a Part 327 permit. (EGLE pages returned 403; taken from search summaries.)
Data centers: No enacted data-center water law found. Pending, not passed (news only): Senate package of 6/18/26 incl. SB 1046 (consumptive-use permits/hearings; reported 550,000 gpd trigger, 2 MGD cap), SB 762 annual water/energy reports; House HB 6138 and HB 6265. Status from bill trackers/news, not legislature site.
Checked 2026-10-28 · low confidence. Sources: Michigan Public - New data center regulations proposed in Senate (news, last resort)
Minnesota
Who regulates: Minnesota Department of Natural Resources (DNR), Division of Ecological and Water Resources / Waters
How a new large user gets water: A new large water user applies to DNR for a water-use appropriation permit once it crosses the 10,000 gal/day or 1,000,000 gal/year threshold. Many data centers instead draw from a municipal water system, which may trigger the data-center-specific conditions below if volume is large enough even though the data center itself never applies directly. Read directly from Minn. Stat. 103G.271, subd. 5b, via revisor.mn.gov.
Data centers: Minn. Stat. 103G.271, subd. 5b (read directly) applies to new/modified water-use permits for a 'data center' (statutory term) where proposed new/additional consumptive use exceeds 100,000,000 gallons/year, and to existing permits where the permittee will supply more than 100,000,000 gallons/year to a data center. For those, DNR must ensure public health/safety/welfare is adequately protected, that water-conservation and efficient-use measures were considered (efficient fixtures, water recycling, reclaimed water, closed-loop systems), and that conflicts are addressed under Minn. Rules pt. 6115.0740; the commissioner must require an aquifer test under Minn. Stat. 103G.287 if needed to confirm the public-health/safety/welfare condition. Minn. Stat. 103G.265, subd. 5 (not independently read; MEDIUM confidence from a search snippet) reportedly lets DNR engage with a data-center developer before a formal application when expected use exceeds 100,000,000 gallons/year. Permit application/reporting fees reportedly increased effective Jan 1, 2026 (Minnesota Reformer, not independently read).
Checked 2026-11-01. Sources: Minnesota Revisor of Statutes: Minn. Stat. 103G.271, subd. 5b (read directly) · Axios: Microsoft's West Des Moines water use context (cross-state comparison; Minnesota DNR permit threshold corroboration)
Missouri
Who regulates: Missouri Department of Natural Resources (DNR), Division of Geology & Land Survey / Water Resources Center
How a new large user gets water: Read directly, Revisor of Statutes: RSMo 256.400 defines a 'major water user' as anyone with equipment able to withdraw 100,000 gallons/day or more from any water source; RSMo 256.410 requires a major user to file an annual registration (Jan 1-Mar 31) before withdrawing. DNR's own fact sheet separately states a practical registration trigger of 70 gallons/minute (about 100,800 gal/day, roughly consistent). There is no permit denial/approval step for an ordinary new large user -- it is registration and reporting only, not a permit-to-use system. A separate 2025 law (SB 82, Water Preservation Act, RSMo 640.406, read directly) requires a DNR permit only to export water out of state; it exempts use within 30 miles of Missouri's border and bottled/single-container water, so it does not bind an ordinary in-state data center withdrawal.
Data centers: No enacted Missouri water law is data-center-specific. Several 2026 bills died without a hearing or vote before the session ended May 15, 2026, including HB 2239 (would have mandated closed-loop/low-water cooling at 100MW+ with annual DNR reports), a DNR-permit-for-large-water-users package, HB 3364 (DNR permit review for major industrial water users), and HB 3390 (utility impact-fee bar).
Checked 2026-11-02. Sources: Missouri DNR: A Summary of Missouri Water Laws (pub1350) · Revisor of Statutes: RSMo 256.400 (major water user, definitions) · Revisor of Statutes: RSMo 256.410 (major water user registration) · Missouri DNR: water export permit (RSMo 640.406)
Mississippi
Who regulates: Mississippi Department of Environmental Quality (MDEQ), acting through its Permit Board and the Commission on Environmental Quality
How a new large user gets water: Read directly, 11 Miss. Admin. Code Pt. 7, Ch. 1, Rule 1.2.A (via Cornell Law's regulations mirror): no person may use water without first obtaining a Permit Board permit unless specifically exempted by statute or the regulation itself. Rule 1.4.A's exemptions are narrow -- only single-household domestic wells and wells with a surface-casing diameter under 6 inches -- so an industrial-scale well needs a permit regardless of volume. Rule 1.4.D, also read directly, separately bars any once-through, non-contact cooling-water use above 20,000 gallons/day anywhere in the state without Permit Board approval, which bears directly on data-center cooling. Miss. Code Ann. Section 51-3-7 (read via a secondary source, Justia, after a direct fetch for that statute section returned a 403) lets the Permit Board require permits for withdrawals of 20,000 gallons/day or more once the Commission has declared a 'water use caution area.'
Data centers: No enacted Mississippi water law is data-center-specific. SB 3410 (reported signed by the Governor April 8, 2026, bill text not independently opened) authorizes the City of Brandon and the West Rankin Utility Authority to enter water/wastewater infrastructure agreements with data-center developers.
Checked 2026-11-02. Sources: 11 Miss. Code R. Section 7-1.2 (Permitting), via Cornell Law regulations mirror · 11 Miss. Code R. Section 7-1.4 (Groundwater Withdrawals), via Cornell Law regulations mirror · Miss. Code Ann. Section 51-3-7, via Justia · MDEQ: Water Availability and Use permit forms
Montana
Who regulates: Montana Department of Natural Resources and Conservation (DNRC), administering the Montana Water Use Act of 1973; Montana DEQ separately regulates wastewater discharge and air permits tied to data center power/cooling
How a new large user gets water: Read directly, DNRC 'Water Rights Permitting Criteria and Process' guide: a new user applies to DNRC, which evaluates six statutory criteria (physical availability, legal availability, no adverse effect on senior/prior appropriators, adequacy of the diversion/conveyance system, beneficial use without waste, and a possessory interest in the place of use). DNRC issues a draft Preliminary Determination within 60 days (if a pre-application meeting was held) or 120 days; for applications received on or after Jan 1, 2024, an objection period opens only if a public comment was filed (Form 654), and objections are limited to the criteria actually commented on (Sec. 85-2-307(5)(c) and 85-2-308(1)(b), MCA, as cited in the guide). If no comments or objections are filed, the permit issues without a contested hearing.
Data centers: Read directly, Montana DEQ's 'Data Centers in Montana' FAQ: unless a facility is served by an existing system that already holds its own water rights, DNRC approval under the Water Use Act is required for the water supply of any cooling technology; a separate DEQ permit is required to discharge non-contact cooling water, and open-loop geothermal systems using altered water need a Montana Ground Water Pollution Control System permit. No Montana statute or DNRC/DEQ rule singles out data centers for a different permitting track than any other new large water user; advocacy group Upper Missouri Waterkeeper (not an official source) argues data centers can get county land-use approval via special-use permits before any water-impact disclosure, and is pushing to have data centers defined as a distinct regulated water-use class.
Checked 2026-11-04. Sources: Montana DNRC: Water Rights Permitting Criteria and Process (PDF) · Montana DEQ: Data Centers in Montana -- Frequently Asked Questions (PDF, hosted via Montana Chamber of Commerce)
North Carolina
Who regulates: NC Dept. of Environmental Quality (DEQ), Division of Water Resources (DWR).
How a new large user gets water: A non-agricultural user that withdraws 100,000 gallons or more of ground or surface water in any one day (or transfers that much surface water between river basins) must register the withdrawal with DWR within two months of starting it; this is a registration, not a permit, and DWR issues nothing back. A full water-use permit is required only inside a designated Capacity Use Area (e.g., the Central Coastal Plain) for groundwater withdrawals over 100,000 gpd. Elsewhere, no state appropriation permit gates a new large surface-water user; a developer typically contracts with a municipal/regional utility or drills a well subject to the registration rule. G.S. 143-215.22H is the registration statute (an earlier search citing 143-215.22A for this appears to be a mis-cite).
Data centers: No enacted NC data-center-specific water statute found this cycle. SB 730 (2026, passed the NC House per a backfill lead) would require hyperscale data centers to attest closed-loop/liquid cooling and let DEQ set water-use standards; its Senate/enactment status was not confirmed from a primary legislative source this cycle.
Checked 2026-10-31 · medium confidence. Sources: NC DEQ: Water Use Reporting · NC DWR: Water Use Data Collection (WUDC) FAQ
North Dakota
Who regulates: North Dakota Department of Water Resources (DWR), Water Appropriation Division (statutory successor to the former State Water Commission; some older URLs still resolve under swc.nd.gov).
How a new large user gets water: Read directly from DWR's own appropriation page: any industrial water use requires a water permit before water is put to beneficial use (N.D.C.C. 61-04-02); there is no de minimis exemption for industrial use, unlike domestic/municipal/livestock/recreational use (exempt below 12.5 acre-feet/year). A new large industrial user files a Conditional Water Permit application (SFN 60157). DWR must find under N.D.C.C. 61-04-06 that a prior appropriator's rights will not be unduly affected, the means of diversion are adequate, the use is beneficial, and the appropriation is in the public interest, and will grant a permit only if unappropriated water exists. The conditional-permit fee is $250 (industrial use of 1 acre-foot or less) or $1,000 (more than 1 acre-foot). After the works are built, DWR inspects and, if compliant, issues a Perfected Permit establishing the water right; an Annual Use Form is due every March 31. A Temporary Permit (SFN 60158, $75-$200) covers use under 12 months or excess water but creates no permanent right. Industrial use ranks below municipal use in statutory priority (N.D.C.C. 61-04-06.1).
Data centers: None found. No statute, rule or DWR guidance document specifically addresses data centers. The state's operational large-industrial-water framework (the Industrial Water Depot Request bulk-water-sale process) was built mainly for oilfield/hydraulic-fracturing use, not data centers. Reported data-center cooling in North Dakota so far appears to be handled via closed-loop systems (Applied Digital's Harwood project) or trucked-in water (Applied Digital's Oliver County project) rather than new DWR permits; no DWR permit filing was found tied to any tracked North Dakota data-center project.
Checked 2026-11-03. Sources: ND Dept. of Water Resources -- Water Appropriation · ND Water Appropriation Division -- Water Permits · N.D.C.C. 61-04-06 (permit criteria), secondary compilation
Nebraska
Who regulates: Nebraska Dept. of Water, Energy & Environment / Dept. of Natural Resources (NeDNR) for surface water; each local Natural Resources District (NRD) for groundwater, under its own Integrated Management Plan and well-registration/allocation rules
How a new large user gets water: A new large water user either contracts with a municipal/public utility (e.g. Google Lincoln pays LES/the City of Lincoln $10M for a dedicated pipeline to the Northeast Water Resource Recovery Facility; Google Omaha gave the Metropolitan Utilities District $3M toward a $17M national leak-detection grant), or registers its own well(s) through the local NRD. Confirmed by direct read of dwee.nebraska.gov and dnr.nebraska.gov pages (e.g. https://dwee.nebraska.gov/node/5636, 'Groundwater Natural Resources Districts (NRDs)').
Data centers: No data-center-specific NRD or state water rule was found; this is an open regulatory gap, not a confirmed absence of concern -- the public objection pattern in the Hallam/Cass/Gage county data-center fights centers on private-well-interference fears from exactly this gap. A 2026 law reportedly requires NDWEE to begin collecting annual water-use/energy-demand data from data center developments (thecooldown.com, citing Flatwater Free Press/Grist; LOW/MEDIUM confidence, secondary coverage only, bill text not independently read).
Checked 2026-11-01 · medium confidence. Sources: Nebraska Dept. of Water, Energy & Environment: Groundwater Natural Resources Districts (NRDs) (read directly) · The Reader: Google gives $3 million to MUD to reduce water use in Omaha
New Hampshire
Who regulates: New Hampshire Department of Environmental Services (NH DES).
How a new large user gets water: A permit is required for an average withdrawal of 40 gallons/minute or 57,600 gallons/day or more. Under Env-Wq 403.21, DES 'shall not issue a new large groundwater withdrawal permit' if it determines, after agency review and public comment, that the withdrawal would cause unmitigated adverse impacts. The leading NH Supreme Court case interpreting this regime, In re Town of Nottingham (re: the USA Springs water-bottling proposal), predates data centers entirely. This run's direct fetch of des.nh.gov's own large-groundwater-withdrawal page returned HTTP 403, so this rests on a search-engine summary that appears to quote the DES page's own text and RSA citations, corroborated by secondary legal-reference sites (regulations.justia.com, the NH General Court's own RSA 485-C text pages) -- 'read indirectly,' not a personally confirmed direct read, hence MEDIUM confidence.
Data centers: No New Hampshire data-center-specific water rule found. The state's live data-center fight is almost entirely about electric-load tariffs and construction moratoria (see this state's tariff entry and BACKFILL_LOG), not water; no data-center water bill or DES rule naming data centers was identified this cycle.
Checked 2026-11-05 · medium confidence. Sources: NH DES: Large Groundwater Withdrawal permitting (RSA 485-C:21-25, Env-Wq 403)
New Jersey
Who regulates: NJ Department of Environmental Protection (NJDEP), Bureau of Water Allocation & Well Permitting
How a new large user gets water: A diversion of ground or surface water exceeding 100,000 gallons/day for more than 30 days in any 365-day period (non-agricultural/non-aquaculture use) requires a Water Allocation Permit, Water Use Registration, or Permit-by-Rule. Application is via form BWA-001A (new/major modification) plus a Water Allocation Availability Screening Tool on the NJDEP Online portal; renewal uses BWA-001B; a Highlands-region form (BWA-001HL) applies to sites in the NJ Highlands. This threshold and process description is from WebSearch's own summarization of NJDEP's program page content -- a direct WebFetch of the live page (nj.gov/dep/watersupply/a_allocat.html) returned only a bare page stub both times attempted, so treat as MEDIUM confidence pending a successful direct read.
Data centers: No data-center-specific NJDEP water statute or rule found. Gov. Sherrill signed legislation (reported, not independently read) requiring data-center facilities to report energy AND water usage to the state, as part of the same package as the NJEDA tax-credit repeal -- a reporting mandate, not a new permitting regime. Enabling statute: Water Supply Management Act, N.J.S.A. 58:1A-1 et seq. (P.L. 1981, c.262, amended P.L. 2007, c.246); 58:1A-6 (permits in water-stressed regions) and 58:1A-7 (diversion permits, critical-area criteria) read via Justia's codification, not NJDEP's own compiled text. Implementing regulations N.J.A.C. 7:19 (Subchapter 2: permit/registration procedure; Subchapter 3: fee classes by mgm/month; Subchapter 11 section 7:19-11.4: large-user contingency plans -- conservation measures, alternative-supply description, shutdown procedures) read directly via regulations.justia.com and law.cornell.edu.
Checked 2026-11-01 · medium confidence. Sources: Justia: N.J.S.A. 58:1A-6 and 58:1A-7 (Water Supply Management Act) · Justia/Cornell: N.J.A.C. 7:19 Water Supply Allocation rules · NJDEP: Water Allocation program page (fetch returned a page stub only; cited for the threshold/form description per WebSearch summary)
Nevada
Who regulates: Nevada Division of Water Resources / State Engineer
How a new large user gets water: Obtain a water right via State Engineer application, usually by buying/changing an existing right or buying from a utility; many of 256 basins are over-appropriated and the State Engineer can designate Critical Management Areas. Basin-specific availability not confirmed.
Data centers: EO 2026-005 (signed ~Sept 18, 2026) 'Nevada Standard for Responsible Data Center Development' requires developers seeking tax abatement to meet local water standards (news only; primary text not found). No state water statute on data centers found. UPDATE (2026-10-31): basin-level scarcity is also driving county-level bans: Nye County adopted a permanent ban on new data centers in the Pahrump Valley (Hydrographic Basin 162), 5-0 on Aug 18, 2026, citing the basin's over-appropriated status -- a county/land-use ban, not a state water-permitting rule.
Checked 2026-10-31 · low confidence. Sources: Nevada Division of Water Resources · Nevada Legislature Research Division - water overview 2019 · Fox5 Vegas (news, last resort): Lombardo EO · Pahrump Valley Times: Nye County approves data center moratorium/ban (Basin 162)
New York
Who regulates: NYS Department of Environmental Conservation (DEC), Division of Environmental Permits.
How a new large user gets water: Read directly from DEC's own regulatory page (dec.ny.gov/regulatory/permits-licenses/wastewater-stormwater-water-withdrawal/water-withdrawal): a new large water user whose system is designed for 100,000 gallons/day or more must obtain a Water Withdrawal Permit under ECL Article 15, Title 15 before withdrawing, and must report withdrawal volumes annually once permitted. This run did not independently open the underlying statute text (ECL 15-1501/15-1502) or the implementing regulation (6 NYCRR Part 601), so the exact application process, review criteria, and any permit-vs-registration or major/minor project distinctions below the headline threshold are not confirmed beyond what the regulatory summary page states.
Data centers: No New York data-center-specific water law is enacted yet. Two bills are pending, neither read directly from bill text (reported only, via bill-tracker pages): the Responsible Data Center Development Act (A11560/S10642; reported 20MW threshold, moratorium plus an 18-month study; reported to have passed both chambers in June 2026 and awaiting Gov. Hochul's signature or veto, with a reported December 2026 decision deadline) and S10487, a 'data center water stewardship and reuse act' (would reportedly require large facilities to reach at least 60% recycled/non-potable water use by 2035, plus public water-use-effectiveness reporting; reported still in the Senate Environmental Conservation committee as of May 2026). Separately, Gov. Hochul's Executive Order 62 (reported signed July 14, 2026) pauses new discretionary DEC permits for data centers of 50MW or more for one year, with exemptions for already-deemed-complete applications and for manufacturing/research/education/medical back-office facilities -- this is a permitting pause, not a water-specific rule, and its primary text (governor.ny.gov) was not opened directly this cycle.
Checked 2026-11-05 · medium confidence. Sources: NYSDEC: Water Withdrawal permitting (read directly)
Ohio
Who regulates: Ohio Department of Natural Resources (ODNR), Division of Water Resources; Great Lakes Compact permits under ORC 1522.
How a new large user gets water: Most data centers buy from a public water system and need no registration. Own withdrawals with capacity over 100,000 gpd must register (ORC 1521.16, no fee, not a permit). Permit for new consumptive use over 2 MGD (ORC 1521.23); lower Lake Erie basin thresholds under ORC 1522.12.
Data centers: No data-center-specific water law found enacted. ODNR Director testimony (5/27/26, House Select Committee on Data Centers): all Ohio data centers tie to public systems so ODNR has no visibility into their water use; no data center holds a high-capacity permit; ORC 1521.23(D)/(E) exemptions noted.
Checked 2026-10-28 · medium confidence. Sources: ODNR Director Mertz testimony to Select Committee on Data Centers, 5/27/2026 (PDF)
Oklahoma
Who regulates: Oklahoma Water Resources Board (OWRB).
How a new large user gets water: Non-domestic groundwater or stream use needs an OWRB permit filed before use; groundwater permits are sized to land owned or leased over a basin (default 2 ac-ft/acre where no yield set). Data centers have mostly bought from municipal or rural water systems, which needs no state permit.
Data centers: SB 259 (Groundwater Modernization Act), reported enacted 2026: a data center seeking a groundwater permit must use recirculating/low-consumptive cooling (no open evaporative). Annual use reporting; one source says effective Nov 1, 2026. Utility-purchase loophole; fix bill expected. Per news; enrolled text not read.
Checked 2026-10-28 · medium confidence. Sources: OWRB Apply for a Water Permit · HPPR: A loophole leaves Oklahoma data center water consumption largely untracked (news, Jul 27, 2026) · HPPR: Oklahoma lawmakers add data center restrictions to groundwater metering measure (news, Apr 14, 2026)
Oregon
Who regulates: Oregon Water Resources Department (OWRD)
How a new large user gets water: A new large water user applies to OWRD for a water-right permit, later perfected into a certificate, with priority dating to the application (standard prior-appropriation permitting). In large parts of the Umatilla Basin -- Oregon's main data-center hub (Morrow/Umatilla Counties) -- new groundwater appropriation is foreclosed by name: the Ordnance, Butter Creek, and Stage Gulch Critical Groundwater/Study Areas were closed to further appropriation by Director's Order in 1976, 1986, and 1985 respectively, and groundwater within 5 miles of several municipal wells (Hermiston, Pendleton, Umatilla, Stanfield, etc.) is reserved for municipal/domestic use absent a hydraulic barrier -- read directly from the Oregon Administrative Rules (OAR 690-507, the Umatilla Basin Program). This effectively pushes data centers in that basin toward municipal water contracts or surface-water rights rather than new groundwater permits.
Data centers: No Oregon data-center-specific water statute was found; OWRD has a pending 2026 rulemaking package (Phase 2, OAR 690 divisions) but nothing data-center-specific was identified. Real-world strain is documented in Morrow County: 30+ data centers built since 2011 around Boardman; cooling-concentrated wastewater is land-applied by the Port of Morrow onto farmland and seeps into groundwater already carrying nitrate contamination known since the 1990s (one resident's well tested at 52 mg/L nitrate against a 10 mg/L legal limit); facility reports show data centers using over 1 million gallons of water in a single month. Which specific facilities hold their own water rights versus municipal service was not determined.
Checked 2026-10-31 · medium confidence. Sources: Oregon Administrative Rules OAR 690-507-0070 (Umatilla Basin Program groundwater closures), read via law.cornell.edu mirror · KPTV: Data centers strain water supply in Oregon town already facing pollution crisis
Pennsylvania
Who regulates: PA DEP for state matters; Susquehanna River Basin Commission (SRBC) and Delaware River Basin Commission (DRBC) approve large withdrawals/consumptive use in their basins.
How a new large user gets water: Buying from a public water system avoids a withdrawal approval. SRBC still requires approval for consumptive use over 20,000 gpd (30-day avg); withdrawals over 100,000 gpd need SRBC/DRBC approval. DRBC: utility-supplied data centers need no direct DRBC approval.
Data centers: SRBC data center page: ABR(e) general permit for public-supply/reuse sources, and a changed public comment process for data centers on public supply (details not read). State: House passed HB 2246 (DEP notice if >100,000 gpd) and HB 2150 (annual water/energy reports) in Apr 2026; Senate has not voted per Spotlight PA (May 18). News (Broadband Breakfast, 7/21/26, unconfirmed): FY budget requires disclosure of energy and water use by data centers over 10 MW.
Checked 2026-10-28 · medium confidence. Sources: SRBC - Data Centers · DRBC - Data Centers FAQ (PDF) · Spotlight PA - data center regulation bills pass House, stall in Senate (news) · Broadband Breakfast - PA lawmakers budget disclosure (news, last resort)
South Carolina
Who regulates: South Carolina Department of Environmental Services (SCDES, created July 1, 2024 from DHEC's environmental programs plus some DNR hydrology functions)
How a new large user gets water: Read directly on scstatehouse.gov: the Surface Water Withdrawal, Permitting, Use and Reporting Act (S.C. Code 49-4-10 et seq.) defines a 'surface water withdrawer' as one withdrawing more than 3,000,000 gallons in any month from one intake (49-4-20(28)); such a withdrawer needs a permit (49-4-25) unless exempt (49-4-30). A NEW withdrawer (49-4-70(A)) must get a permit before withdrawing, evaluated under reasonableness criteria (49-4-80) plus minimum-instream-flow rules (49-4-150); an existing withdrawer had 180 days to register for an initial permit based on historical use, without the 49-4-80 criteria. New surface-water withdrawals require 30-day public notice; inter-basin transfers require a public hearing (from DES presentation material, not the statute itself). The Groundwater Use and Reporting Act (S.C. Code 49-5-10 et seq., also read directly) uses the same 3-million-gallon/month threshold to define a 'groundwater withdrawer' (49-5-30(12)); all groundwater withdrawers statewide must register and report annually, but a permit to drill/expand/withdraw is required only inside six designated Capacity Use Areas in the Coastal Plain (Waccamaw, Pee Dee, Santee-Lynches, Lowcountry, Western SC, Trident); outside those areas a withdrawer need only give 30 days' notice. Upstate/Piedmont counties with current data-center activity (Spartanburg, Cherokee, York, Greenwood, McCormick, Edgefield) appear to fall outside any Capacity Use Area -- a geographic inference from the statute, not independently confirmed county-by-county.
Data centers: No data-center-specific water rule found in either statute or on any SCDES page/PDF title read. One SCDES page's own navigation menu lists a 'Valara Holdings High Performance Compute Center' under an 'Environmental Sites & Projects' section, meaning SCDES is tracking the Spartanburg project as a site of interest, but the page's content was not retrievable this cycle, so its regulatory posture toward that project (e.g., any water permit) is not known.
Checked 2026-11-02. Sources: South Carolina Code of Laws, Title 49, Chapter 4 (Surface Water Withdrawal Act), read directly · South Carolina Code of Laws, Title 49, Chapter 5 (Groundwater Use and Reporting Act), read directly · SCDES: Surface Water Withdrawals program page
South Dakota
Who regulates: DANR Water Rights Program (staff/Chief Engineer), with final permitting authority held by the 7-member Water Management Board; data-center-specific duties under SB135 (2026) also fall to the Board of Water Management.
How a new large user gets water: Read directly (DANR's own Water Rights pages and SDCL Chapter 46-2A): all water use beyond a small domestic exemption (up to 25,920 gal/day or 25 gpm peak) requires a water-right permit. The applicant files the Chief Engineer's Form 2 application (source, amount, diversion points, period/type of use, fee, supporting data); notice runs for two successive weeks in an official newspaper in each affected county. If uncontested and staff recommends approval, the Chief Engineer may issue the permit without a hearing under SDCL 46-2A-9 (water available, no unlawful impairment of existing rights, beneficial use, public interest). Contested applications go to a Water Management Board hearing, appealable to the courts. A permit holder has 5 years to complete construction plus 4 more to put the water to beneficial use, then is inspected and issued a water license converting the permit into a water right; water must be used at least every 3 years or faces cancellation exposure.
Data centers: Yes -- South Dakota's Senate Bill 135 (2026 Session Law Chapter 190, signed by Gov. Rhoden March 24, 2026, effective July 1, 2026, codified at SDCL 49-50-1 et seq., read directly from the enrolled bill text) applies to any data center with peak electric demand of 10 MW or more. It layers obligations on top of the general permit system: the operator must notify each local water provider of projected consumption before operating; each provider must determine in writing whether that consumption is compatible with the local water supply; the operator files all notices and determinations with the Board of Water Management, which issues a public statement if every provider finds compatibility; even then, the data center may not exceed consumption limits the Board sets by order after allocating for residential and essential public services, and the Board must seek to prevent disproportionate data-center water use; operators must file public semi-annual water-use reports with the Board. The same chapter also requires electric providers to keep separate cost-recovery terms for data centers and bars the state from preempting local data-center ordinances.
Checked 2026-11-03. Sources: DANR Water Rights -- Legal Summary · DANR Water Rights Program · South Dakota 2026 Session Law, Chapter 190 (Senate Bill 135), enrolled text · Otter Tail Power EL26-021 Petition (cites SDCL 49-50-1 et seq. and the July 1, 2026 effective date)
Tennessee
Who regulates: Tennessee Department of Environment & Conservation (TDEC), Division of Water Resources (Aquatic Resource Alteration Permit program)
How a new large user gets water: Tenn. Code 69-7-304 requires annual registration of a water withdrawal with TDEC; Tenn. Code 69-7-204 requires a permit before certain diversions/transfers (these statute citations are from secondary summaries -- direct fetches of the statute text were blocked by a 403 this cycle, not independently opened). TDEC Rule 0400-40-03-.04 exempts a withdrawal removing less than 5% of the minimum 7-day/10-year average streamflow (7Q10) from Aquatic Resource Alteration Permit requirements -- the closest general large-withdrawal trigger, not data-center-specific. In Shelby County, new groundwater wells into the Memphis Sand Aquifer go through the county's own Groundwater Quality Control Board, a county body separate from TDEC.
Data centers: No TN statute or TDEC rule singles out data centers. The only data-center-tied water action found is local and ad hoc in Shelby County: TDEC is permitting (public hearings held June 2025) a 13.5-million-gal/day reclaimed-wastewater reuse plant drawing from the T.E. Maxson Wastewater Treatment Plant to serve xAI's Colossus campus, Nucor Steel and TVA's Allen Combined Cycle Plant, intended to reduce draw on the Memphis Sand Aquifer. xAI's own aquifer withdrawal is disputed across outlets at anywhere from 30,000 to 1,300,000 gallons/day, with no regulator-published figure found; MLGW sold xAI over 25 million gallons of water in March 2026 at a bulk rate below the standard customer rate (read directly, Memphis Flyer).
Checked 2026-11-02 · medium confidence. Sources: Tennessee TN H2O water plan appendix: institutional and legal framework · Memphis Flyer: TDEC considers permit for Colossus wastewater-reuse plant · Memphis Flyer: xAI bought 25M gallons of water from MLGW, projects increases
Texas
Who regulates: TCEQ (surface water rights); local groundwater conservation districts (groundwater); TWDB runs the water use survey and planning.
How a new large user gets water: Surface water generally needs a TCEQ water right (usually buy or lease an existing one). Groundwater is pumped under a permit from the local groundwater conservation district where one exists; outside districts rule of capture applies. Many data centers buy from a municipal or utility supplier.
Data centers: TWDB annual Water Use Survey (Water Code 16.012(m)) explicitly covers data centers, AI and crypto facilities that operated in 2025; no volume threshold stated. Gov. Abbott's Sept 14, 2026 letter directs TWDB to enforce, with update due Oct 14, 2026. New bills expected at Nov 2026 filing (news only). UPDATE (2026-11-01): AG Paxton's office sent letters to 156 data center developments in 32 counties (including Brazos County) around Oct 15, 2026, per KBTX, demanding 'current and accurate' water-use information never reported to the TWDB survey; KBTX's reporting names no statute/legal basis and no gallons figures in the letters. The specific Brazos County recipient was not identified in either KBTX story -- Reveille AI Compute Center (RACC, at the RELLIS Campus), the only new Brazos County data center project KBTX could name, told KBTX it was not them.
Checked 2026-11-01 · medium confidence. Sources: TWDB Water Use Survey: digital infrastructure (data centers) · Office of the Governor: Abbott directs TWDB to penalize data center reporting failures (Sept 14, 2026) · WaterWorld news report on the governor's directive (news, last resort) · KBTX: Paxton's office sends 156 letters to Texas data center developments over water-use reporting · KBTX: Paxton says a Brazos County data center got a letter demanding water-use reporting
Utah
Who regulates: Utah Division of Water Rights (State Engineer); water providers and conservancy districts supply most users
How a new large user gets water: Many basins are closed to new appropriation (e.g., Sevier, Snyderville/Park City), so new users generally buy and change an existing right or connect to a municipal/district provider. Check the Division's area policy for the specific basin.
Data centers: HB 76 (2026) Data Center Water Transparency Amendments, signed Mar 26, effective Jul 1, 2026: new data centers over 10,000 sq ft using 75+ acre-feet/yr must file a pre-construction report (90-360 days before) and annual reports, published by Sep 1. Reporting only; no cap.
Checked 2026-10-28. Sources: Utah Division of Water Rights - Large Data Center Water Use Reporting · Utah Division of Water Rights - Sevier River Basin policy · Utah Legislature draft: Data Center Water Policy Amendments (interim) · WSWC Data Centers Topical Report June 1 2026
Virginia
Who regulates: Virginia DEQ and the State Water Control Board.
How a new large user gets water: Most data centers buy from a public water utility, which holds DEQ withdrawal permits. In the Eastern Virginia GWMA, withdrawals of 300,000 gal/month or more need a DEQ groundwater permit (water conservation plan required).
Data centers: Enacted 2026: utilities must report data center (air-permitted) water sales monthly from Jan 1, 2027 (Sen. Srinivasan bill; number not confirmed). HB 30 Item 366: new EVGMA data centers (air permit after Jan 1, 2027) must show minimized cooling water; DEQ criteria for Cooling Water Scarcity Areas due Jul 1, 2027. SCC report due Oct 1.
Checked 2026-10-28 · medium confidence. Sources: Hunton: 2026 Virginia Environmental Legislative Update for Data Centers · WHRO: New regulations beef up data centers' water use reporting in Virginia (news) · Va. Code 62.1-260 (groundwater management areas permits) · WDBJ7: data centers face same restrictions as all water customers (news)
Vermont
Who regulates: Vermont Agency of Natural Resources (ANR), Department of Environmental Conservation, Drinking Water and Groundwater Protection Division.
How a new large user gets water: Read directly from DEC's own program page (dec.vermont.gov/node/17466): any groundwater user pumping more than 20,000 gallons/day must report annual usage to DEC; a commercial/industrial user withdrawing more than 57,600 gallons/day may need a groundwater withdrawal permit. This is a statewide threshold, not Act-250-specific, and applies to a data center the same as any other large industrial user. Separately, Act 250 (10 V.S.A. SS6086) criteria on water supply, waste disposal, and utility/energy impacts apply case-by-case to developments that trigger Act 250 jurisdiction; whether a given data center triggers that jurisdiction is not settled by statute today (an amendment that would have added data centers explicitly to Act 250's definition of 'development,' H.727, was vetoed by Gov. Scott on 2026-05-28 and the House override failed 83-52 on 2026-05-29, confirmed directly from the Legislature's own bill-status page). The Legislature's current listing for 38 M.R.S. is not applicable here; Vermont's own sections 38 V.S.A./Act 199 groundwater thresholds were read directly from DEC's page, HIGH confidence; the Act 250 criteria/H.727 specifics rest on the Legislature's own criteria-list and bill-status pages plus secondary summaries, MEDIUM confidence.
Data centers: No Vermont data-center-specific water statute is currently in force. H.727 ('An act relating to sustainable data center development') would have added a new 10 V.S.A. SS6086a requiring data centers to obtain surface- and groundwater withdrawal permits (with ANR able to set a lower reporting bar than the general 57,600 gpd threshold) and a closed-loop cooling requirement unless a District Commission found it infeasible, but Gov. Scott vetoed it 2026-05-28 and the override failed 2026-05-29 (read directly from legislature.vermont.gov/bill/status/2026/H.727). VELCO's own Feb. 2026 testimony to the House Energy & Digital Infrastructure Committee stated there are no current requests to interconnect large data centers to the VELCO transmission system, consistent with zero qualifying VT projects found in this cycle.
Checked 2026-11-06 · medium confidence. Sources: Vermont DEC: Groundwater withdrawal reporting and permitting (Act 199) · Vermont Legislature: H.727 bill status (vetoed, override failed)
Washington
Who regulates: Washington Department of Ecology
How a new large user gets water: A new large water user files a new water-right application with Ecology, which applies a four-part test (water availability, beneficial use, no impairment of existing rights, public interest) before issuing a permit, later perfected into a certificate; the priority date relates back to the filing date (RCW 90.03.340). Expedited, cost-reimbursement review is available under RCW 90.03.265, though a third party's appeal shifts defense costs back onto the applicant. Ecology's own public-facing program-overview page could not be located (404) to confirm this process description against Ecology's current wording.
Data centers: No Washington data-center-specific water statute or rule was found. Data centers get water the same way any large commercial/industrial user does -- either a new Ecology-issued water right, or (more commonly for the Quincy/Moses Lake-area cluster) hookup to an existing municipal/irrigation-district water system rather than a new standalone appropriation. Which specific facilities hold their own water rights versus municipal service was not determined; that needs a parcel-level Ecology water-right-tracking-system lookup not performed here.
Checked 2026-10-31 · low confidence. Sources: Washington RCW 90.03.340 (water-right priority dates), seen via search-result text, not independently fetched
Wisconsin
Who regulates: Wisconsin Department of Natural Resources (DNR)
How a new large user gets water: Great Lakes basin (e.g. Racine, Ozaukee Counties): Wis. Stat. 281.344 requires a DNR permit for a withdrawal averaging >=1,000,000 gallons/day over any 30 consecutive days; individual permits run 10 years (281.346), with new/increased large withdrawals needing to meet the Compact's 'no significant adverse individual or cumulative impacts' standard. Inland/non-basin (e.g. Dodge County): Wis. Stat. 281.34 requires DNR approval before constructing/operating a 'high capacity well' (generally >100,000 gallons/day combined capacity); DNR may impose siting/depth/flow conditions, with extra scrutiny within 1,200 feet of sensitive features ('groundwater protection areas'). Statute text (exact subsections) was obtained via a search tool's direct quoting of docs.legis.wisconsin.gov; a full direct page open of those statute pages returned repeated HTTP 503 errors, and the cross-referenced administrative rules (NR 142, NR 860) were not independently opened.
Data centers: No Wisconsin statute or DNR rule specifically targeting data centers as a water-use category was found. A real, directly-tied precedent: the City of Racine's existing 2018 Great Lakes Compact diversion authorization (DNR-approved, for the Foxconn site) of up to 7 million gallons/day from Lake Michigan is the basis for Microsoft's Mount Pleasant campus water use -- Racine city records (released Sept 2025) show a projected campus draw of up to 8.4 million gallons/YEAR (peak ~702,000 gal/day), within that daily ceiling; most of the campus uses closed-loop cooling. Meta's Beaver Dam campus (inland, not in the Great Lakes basin) uses dry cooling specifically to minimize water draw, reducing the likelihood of needing a large high-capacity-well permit; no confirmation was found of whether Meta has filed one.
Checked 2026-11-01 · medium confidence. Sources: Wisconsin Examiner: Racine releases records showing Microsoft data center would use 8 million gallons of water per year · Wisconsin Legislature: Wis. Stat. ch. 281 (statute text retrieved via search-tool extraction of docs.legis.wisconsin.gov; direct page opens returned HTTP 503)
West Virginia
Who regulates: West Virginia Department of Environmental Protection (DEP), Division of Water and Waste Management, Water Use Section
How a new large user gets water: Read directly, DEP's Water Use Section page: any 'large quantity user' withdrawing more than 300,000 gallons from surface or groundwater in any 30-day period (threshold effective Jan. 1, 2015) must register with DEP and file an annual water-use certification/report (monthly withdrawal data) under the Water Resources Protection and Management Act, W. Va. Code Chapter 22, Article 26 (cited by the DEP page; the statute PDF itself returned as unreadable binary this cycle, not independently opened as text). Reporting is filed electronically through DEP's Permitting, Inspection and Enforcement (PIE) system. The DEP page describes no permit-approval/denial step for an ordinary new large withdrawal -- registration and reporting only, not a permit-to-use system.
Data centers: No enacted West Virginia water statute or DEP rule singling out data centers was found. House Bill 2014 (2025), which lets large microgrid/'high impact data center' developments operate as independent utilities, is an energy-siting law, not a water law. Several in-development campuses describe their own water plans only as developer claims, not regulatory mandates: Nscale's Monarch Compute Campus says its design has no impact on municipal water or residential users (read directly, WV Public Broadcasting, Mar. 17, 2026); Starwood's Project Tamarack says it will use closed-loop cooling with no water source named (read directly, WV Public Broadcasting, Sept. 3, 2026); Google's Putnam County project pledged to replenish more water than it uses by 2030, targeting 120% average replenishment, and to pay for any water/sewer upgrades itself (read directly, WSAZ, Mar. 27, 2026).
Checked 2026-11-03. Sources: WV DEP: Water Use Section (Water Resources Protection and Management Act) · WV Public Broadcasting: Large AI development hub in Mason County getting larger · WV Public Broadcasting: Second certified data center announced for Mason County · WSAZ: Google purchases land for a potential data center in Putnam County
Wyoming
Who regulates: Wyoming State Engineer's Office (Ground Water and Surface Water Divisions); Board of Control issues certificates
How a new large user gets water: Apply to the State Engineer for a groundwater permit (U.W. 5), which is usually granted as routine; applications in a groundwater control area get public notice and can be denied if not in the public interest. Or buy water from a municipal supplier.
Data centers: Gov. Gordon June 3, 2026 'Wyoming Way' executive order on data centers asks them to protect water and wildlife; agencies had 60 days to recommend changes (news only, order number not confirmed). HB 90 ($500k State Engineer data-center water study) failed.
Checked 2026-10-28 · medium confidence. Sources: Wyoming SEO - Ground Water General Processes · WSWC Data Centers Topical Report June 1 2026 · KUNC (news, last resort): Wyoming EO
Read this before relying on the page. Rows are compiled from public records and reporting, with AI-assisted extraction, and are checked against the jurisdiction's own record over time. The list is a snapshot and is not complete. Confirm anything you rely on with the town, county or state water agency. This is screening information, not legal advice.
Know of a water limit we do not show?
Tell us the place and send a link, and mention water, sewer or wells in the note. We check it against the jurisdiction's own record before it is listed.