Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 1 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Project Matador Gas Plant (PMG) planned, approvals not started | Fermi America | TX | planned | 11,679 | Gas | 2030 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Grand Coulee utility owner | U S Bureau of Reclamation | WA | operating | 6,809 | Hydro | 1941 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Vogtle utility owner | Georgia Power Co | GA | operating | 4,658 | Nuclear | 1987 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Project Matador Nuclear planned, approvals not started | Fermi Nuclear | TX | planned | 4,468 | Nuclear | 2032 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Homer City Generating Station planned, approvals not started | Homer City Generation, L.P. | PA | planned | 4,396 | Gas | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | West County Energy Center utility owner | Florida Power & Light Co | FL | operating | 4,263 | Gas | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Palo Verde utility owner | Arizona Public Service Co | AZ | operating | 4,210 | Nuclear | 1986 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | W A Parish independent owner | NRG Texas Power LLC | TX | operating | 4,008 | Coal | 1958 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Browns Ferry utility owner | Tennessee Valley Authority | AL | operating | 3,854 | Nuclear | 1974 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Chokecherry and Sierra Madre Wind under construction | Power Company of Wyoming LLC | WY | planned | 3,551 | Wind | 2033 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bowen utility owner | Georgia Power Co | GA | operating | 3,499 | Coal | 1971 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crystal River utility owner | Duke Energy Florida, LLC | FL | operating | 3,449 | Gas | 1982 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Barry utility owner | Alabama Power Co | AL | operating | 3,343 | Gas | 1954 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gibson utility owner | Duke Energy Indiana, LLC | IN | operating | 3,340 | Coal | 1975 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Monroe (MI) utility owner | DTE Electric Company | MI | operating | 3,293 | Coal | 1969 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Turkey Point utility owner | Florida Power & Light Co | FL | operating | 2,978 | Nuclear | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Manatee utility owner | Florida Power & Light Co | FL | operating | 2,951 | Gas | 1976 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | John E Amos utility owner | Appalachian Power Co | WV | operating | 2,933 | Coal | 1971 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Peach Bottom independent owner | Constellation Nuclear | PA | operating | 2,876 | Nuclear | 1974 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bath County utility owner | Virginia Electric & Power Co | VA | operating | 2,862 | Hydro | 1985 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Jack McDonough utility owner | Georgia Power Co | GA | operating | 2,848 | Gas | 1971 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mystic Generating Station independent owner | Constellation Mystic Power LLC | MA | retired | 2,844 | Gas | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | James H Miller Jr utility owner | Alabama Power Co | AL | operating | 2,822 | Coal | 1978 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | FirstEnergy Bruce Mansfield independent owner | FirstEnergy Generation Corp | PA | retired | 2,741 | Coal | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | South Texas Project independent owner | STP Nuclear Operating Co | TX | operating | 2,709 | Nuclear | 1988 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fort Myers utility owner | Florida Power & Light Co | FL | operating | 2,681 | Gas | 1958 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Scherer utility owner | Georgia Power Co | GA | operating | 2,673 | Coal | 1982 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Oconee utility owner | Duke Energy Carolinas, LLC | SC | operating | 2,667 | Nuclear | 1973 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Coastal Virginia Offshore Wind (CVOW) Commercial Project under construction | Dominion Energy Inc. | VA | planned | 2,640 | Wind | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cumberland (TN) utility owner | Tennessee Valley Authority | TN | operating | 2,600 | Coal | 1973 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gavin Power, LLC independent owner | Gavin Power, LLC | OH | operating | 2,600 | Coal | 1974 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rockport utility owner | Indiana Michigan Power Co | IN | operating | 2,600 | Coal | 1984 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Trimble County utility owner | Louisville Gas & Electric Co | KY | operating | 2,594 | Coal | 1990 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SunZia Wind South independent owner | Pattern Operators LP | NM | operating | 2,561 | Wind | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Roxboro utility owner | Duke Energy Progress - (NC) | NC | operating | 2,558 | Coal | 1966 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Watts Bar Nuclear Plant utility owner | Tennessee Valley Authority | TN | operating | 2,540 | Nuclear | 1996 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TalenEnergy Susquehanna independent owner | TalenEnergy Susquehanna LLC | PA | operating | 2,532 | Nuclear | 1983 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pepper Hammock Solar and Storage approvals pending | BrightNight Power | GA | planned | 2,500 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Belews Creek utility owner | Duke Energy Carolinas, LLC | NC | operating | 2,491 | Gas | 1974 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | W H Sammis independent owner | Energy Harbor Generation LLC | OH | retired | 2,468 | Coal | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Chief Joseph utility owner | USACE Northwestern Division | WA | operating | 2,456 | Hydro | 1955 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cross utility owner | South Carolina Public Service Authority | SC | operating | 2,452 | Coal | 1984 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | J M Stuart utility owner | Dayton Power & Light Co | OH | retired | 2,452 | Coal | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Braidwood Generation Station independent owner | Constellation Nuclear | IL | operating | 2,450 | Nuclear | 1988 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Byron Generating Station independent owner | Constellation Nuclear | IL | operating | 2,450 | Nuclear | 1985 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Martin utility owner | Florida Power & Light Co | FL | operating | 2,448 | Gas | 1994 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | McGuire utility owner | Duke Energy Carolinas, LLC | NC | operating | 2,441 | Nuclear | 1981 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sequoyah utility owner | Tennessee Valley Authority | TN | operating | 2,441 | Nuclear | 1981 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nine Mile Point utility owner | Entergy Louisiana LLC | LA | operating | 2,440 | Gas | 1971 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Comanche Peak independent owner | Luminant Generation Company LLC | TX | operating | 2,430 | Nuclear | 1990 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Robert Moses Niagara utility owner | New York Power Authority | NY | operating | 2,429 | Hydro | 1961 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Union Power Station utility owner | Entergy Arkansas LLC | AR | operating | 2,428 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Catawba utility owner | Duke Energy Carolinas, LLC | SC | operating | 2,410 | Nuclear | 1985 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Navajo utility owner | Salt River Project | AZ | retired | 2,409 | Coal | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sunstone Solar approvals pending | Sunstone Solar, LLC | OR | planned | 2,400 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Labadie utility owner | Union Electric Co - (MO) | MO | operating | 2,389 | Coal | 1970 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | PSEG Salem Generating Station independent owner | PSEG Nuclear LLC | NJ | operating | 2,382 | Nuclear | 1971 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Martin Lake independent owner | Luminant Generation Company LLC | TX | operating | 2,380 | Coal | 1977 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sanford utility owner | Florida Power & Light Co | FL | operating | 2,378 | Gas | 1969 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pointe Coupee Power Station planned, approvals not started | Entergy Louisiana LLC | LA | planned | 2,341 | Gas | 2031 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | LaSalle Generating Station independent owner | Constellation Nuclear | IL | operating | 2,340 | Nuclear | 1984 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Jim Bridger utility owner | PacifiCorp | WY | operating | 2,326 | Gas | 1974 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Diablo Canyon utility owner | Pacific Gas & Electric Co. | CA | operating | 2,323 | Nuclear | 1985 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | P H Robinson independent owner | NRG Texas Power LLC | TX | retired | 2,315 | Gas | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | H L Culbreath Bayside Power Station utility owner | Tampa Electric Co | FL | operating | 2,294 | Gas | 1965 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Donald C Cook utility owner | Indiana Michigan Power Co | MI | operating | 2,285 | Nuclear | 1975 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Limerick independent owner | Constellation Nuclear | PA | operating | 2,277 | Nuclear | 1986 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hines Energy Complex utility owner | Duke Energy Florida, LLC | FL | operating | 2,266 | Gas | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Millstone independent owner | Dominion Energy Nuclear Conn Inc | CT | operating | 2,260 | Nuclear | 1975 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pittsburg Power independent owner | NRG Delta LLC | CA | retired | 2,258 | Gas | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | San Onofre Nuclear Generating Station utility owner | Southern California Edison Co | CA | retired | 2,254 | Nuclear | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sherwood H Smith Jr Energy Complex utility owner | Duke Energy Progress - (NC) | NC | operating | 2,245 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Victor J Daniel Jr utility owner | Mississippi Power Co | MS | operating | 2,229 | Gas | 1977 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ghent utility owner | Kentucky Utilities Co | KY | operating | 2,226 | Coal | 1974 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Willow Glen utility owner | Entergy Louisiana LLC | LA | retired | 2,178 | Gas | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Conesville independent owner | AEP Generation Resources Inc | OH | retired | 2,175 | Coal | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Jeffrey Energy Center utility owner | Evergy Kansas Central, Inc | KS | operating | 2,160 | Coal | 1978 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | John Day utility owner | USACE Northwestern Division | OR | operating | 2,160 | Hydro | 1968 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | St Lucie utility owner | Florida Power & Light Co | FL | operating | 2,160 | Nuclear | 1976 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lincoln Combustion utility owner | Duke Energy Carolinas, LLC | NC | operating | 2,156 | Gas | 1995 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Marshall (NC) utility owner | Duke Energy Carolinas, LLC | NC | operating | 2,119 | Gas | 1965 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gulf Clean Energy Center utility owner | Florida Power & Light Co | FL | operating | 2,107 | Gas | 1959 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ravenswood independent owner | Ravenswood Operations LLC | NY | operating | 2,096 | Gas | 1963 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Guernsey Power Station independent owner | Guernsey Power Station LLC | OH | operating | 2,055 | Gas | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | FirstEnergy Harrison Power Station utility owner | Monongahela Power Co | WV | operating | 2,052 | Coal | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | E C Gaston utility owner | Alabama Power Co | AL | operating | 2,034 | Gas | 1960 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dresden Generating Station independent owner | Constellation Nuclear | IL | operating | 2,019 | Nuclear | 1970 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Quad Cities Generating Station independent owner | Constellation Nuclear | IL | operating | 2,019 | Nuclear | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Homer City Generating Station independent owner | Homer City Generation, L.P. | PA | retired | 2,012 | Coal | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Brunswick Nuclear utility owner | Duke Energy Progress - (NC) | NC | operating | 2,003 | Nuclear | 1975 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Deschutes Solar and BESS approvals pending | DECH bn, LLC | OR | planned | 2,000 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | H Allen Franklin Combined Cycle independent owner | Southern Power Co | AL | operating | 1,996 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Monticello independent owner | Luminant Generation Company LLC | TX | retired | 1,980 | Coal | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ludington utility owner | Consumers Energy Co - (MI) | MI | operating | 1,979 | Hydro | 1973 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Widows Creek utility owner | Tennessee Valley Authority | AL | retired | 1,969 | Coal | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Conemaugh independent owner | KeyCon Operating LLC | PA | operating | 1,963 | Coal | 1970 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | North Anna utility owner | Virginia Electric & Power Co | VA | operating | 1,960 | Nuclear | 1978 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wansley utility owner | Georgia Power Co | GA | retired | 1,957 | Coal | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gallatin (TN) utility owner | Tennessee Valley Authority | TN | operating | 1,918 | Coal | 1956 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Big Cajun 2 independent owner | Louisiana Generating LLC | LA | operating | 1,903 | Coal | 1981 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.