Compare large-load tariffs side by side
Pick up to three utilities. See status, the contract term, the minimum bill, collateral and exit fee each filing states, with the source. Add a size and a demand charge to see what the minimum costs in dollars.
Comparison
| ISO New England (ISO-NE), large loads integration tariff revisions (FERC) | |
|---|---|
| Status | Pending |
| Applies at | Not a retail tariff -- revisions to how ISO-NE integrates large loads onto its transmission system |
| Last reviewed | 2026-11-19 |
| Contract term | Not in structured terms yet; see the source |
| Ramp | Not in structured terms yet; see the source |
| Take-or-pay (minimum bill) | Not in structured terms yet; see the source |
| Collateral | Not in structured terms yet; see the source |
| Exit fee | Not in structured terms yet; see the source |
| Notice to reduce or end | Not in structured terms yet; see the source |
| Time to power | Not in structured terms yet; see the source |
| Source | FERC eLibrary's own Advanced Search index (elibrary.ferc.gov/eLibrarywebapi/api/Search/AdvancedSearch), queried directly 2026-11-17 for accession number 20261113-5007 (ER27-484); RTO Insider, 'NEPOOL PC Supports Most of ISO-NE's Proposed Large Load Changes' (headline read via the regulator-feeds lead, article not opened). Federal Register document index (federalregister.gov/api/v1/documents.json), queried directly 2026-11-18 and 2026-11-19 for "ER27-484": only the Nov 18, 2026 Combined Notice of Filings #2 (the original filing notice), no order. Utility Dive, 'Grid operators file closely watched large load interconnection reforms at FERC,' Ethan Howland, Nov. 17, 2026 (read directly, https://www.utilitydive.com/news/pjm-rto-large-load-interconnection-ferc-show-cause/874872/). |
Shaded rows differ between the utilities. Faded values are not stated in the filings we read.
Screening information from public filings, not legal or investment advice. The utility's signed agreement controls. See all coverage · Commitment estimator · Check a site