Maine (ME) data center power coverage

Real, sourced large-load tariff and interconnection research on file for Maine — never inferred, never scraped, never implied beyond what's actually been checked.

Large-load tariffs

Maine utilities (Central Maine Power, Versant Power) -- state inquiry, no tariff found

Law or process only Checked 2026-10-12
ThresholdNo large-load tariff found
StatusMaine DOER, acting under Executive Order 5, asked utilities to report whether they have large-load tariffs and their eligibility terms, minimum contract lengths, exit fees, minimum charges and financial assurance. This indicates an active proceeding, but no filed tariff or stage was confirmed.
SourceMaine DOER letter re: Executive Order 5 data centers (maine.gov, May 2026).

Interconnection & regulatory guidance

Maine — statewide data-center moratorium (through Nov 1, 2027) + Executive Order 5 ratepayer-protection council

Contact guidanceAs of this research, state agencies and municipalities are barred from approving a new large data center at all -- this supersedes any utility-specific interconnection process until the moratorium lifts or is amended. Confirm current status directly before assuming any project above the threshold can proceed.
ThresholdThe moratorium applies to data centers consuming 20 MW or more of power.
ProcessMaine's legislature passed a temporary moratorium on large data center construction running through November 1, 2027 -- reported as the first statewide moratorium of its kind in the US. Separately, Gov. Mills signed Executive Order 5 (April 29, 2026) establishing a Data Center Advisory Council and directing the Department of Energy Resources to coordinate with the Maine PUC on strategies to protect ratepayers from new or increased energy costs tied to data-center development, including the risk of overbuilt generation and stranded utility assets.
SourceJurist (jurist.org) and ENR (enr.com) coverage of the moratorium's passage; Executive Order 5 text via maine.gov (DOER letter re EO 5 data centers). Primary legislative bill text not independently re-read during this research.

Land-constraint screening

Every Kill Test automatically screens against 6 nationwide land-constraint layers, Maine included — no state-by-state gaps here.

FEMA Flood ZoneNearby WetlandsProtected / Conservation LandCritical HabitatSeismic HazardTribal Land
← Back to full coverage

Evaluating a specific parcel in Maine?

Start a Qualification Review