New York ISO (NYISO), large loads interconnection and cost-recovery framework (FERC)
Large-load tariff for data centers: what is on file, the terms the filings state, and where each fact comes from. Terms a filing does not state are marked, never guessed.
StatusPending Last reviewed 2026-11-22
Applies atNot a retail tariff -- a market/interconnection-process and cost-recovery filing for large loads across NYISO's footprint
What the filing saysPENDING at FERC. Read directly from FERC eLibrary's own filing index (filed tariff/testimony text itself not downloaded or read): NYISO filed two related FPA section 205 tariff filings on Nov 16, 2026 under FPA section 35.13(a)(2)(iii). ER27-517-000, 'NYISO 205: Proposed Revisions re: Integration of Large Loads,' proposes a Large Load Interconnection Study Process (LLISP) with revisions to NYISO's OATT and Market Services Tariff, in two effective-date tranches (Feb 1, 2027 and June 1, 2028); the filing includes testimony/affidavits on the LLISP's design and cycle. ER27-518-000, 'LSPGNY 205: Proposed Revisions re: RS10 Large Load-Driven Upgrade Cost Recovery,' proposes to revise cost-recovery rules (RS10) for transmission upgrades driven by large loads, proposed effective Jan 16, 2027. Neither has been acted on by FERC as of Nov 17, 2026, and neither filing's specific terms were read this round. UPDATE 2026-11-18: reported (Utility Dive, read directly, Nov 17, 2026), NYISO's proposal creates new transmission service types -- 'Firm Withdrawal Service' and 'Non-Firm Withdrawal Service' -- for co-located large loads, large loads with behind-the-meter generation, and flexible large loads, plus a 'State Exempt Load Project exception' meant to reconcile NYISO's own resource-adequacy rules with the New York PSC's separate resource-adequacy authority (the PSC has its own proceeding on state-jurisdictional interconnection reforms that is expected to influence NYISO's rules). New York's transmission owners are reported to have filed a 'complementary' large-load proposal of their own. This run's regulator-filing-watch lead flagged that companion filing as FERC docket ER27-529-000 ('NYTOs 205: Proposed Revisions re: Integration of Large Loads,' filed Nov 16, 2026, proposed effective Feb 1, 2027) -- FERC eLibrary's own Advanced Search API returned a server error for every request tried this session, and the filelist page is a client-rendered app this session's tools could not execute, so that docket's own filed text was not independently read or confirmed as the NYTOs' filing. Re-checked Nov 19, 2026: ER27-517 and ER27-518 reappeared in the fercElectric feed; no order found at either FERC eLibrary or the Federal Register's document index since the Nov 16 filings. UPDATE 2026-11-21 (read directly, in full, from the Federal Register's own Nov 23, 2026 Combined Notice of Filings #1, downloaded as a PDF from govinfo.gov and read via pdftotext): this independently confirms ER27-529-000 and resolves the 'not independently read or confirmed' caveat above. The notice's Applicants line for ER27-529-000 names seven entities jointly: New York Independent System Operator, Inc., Central Hudson Gas & Electric Corporation, New York State Electric & Gas Corporation, Rochester Gas and Electric Corporation, Niagara Mohawk Power Corporation, Consolidated Edison Company of New York, Inc., and Orange and Rockland Utilities, Inc. -- i.e., NYISO filed this docket jointly WITH the state's transmission-owning utilities (not the NYTOs filing it alone, and not NYISO filing it alone), with Description verbatim 'New York Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: NYTOs 205: Proposed Revisions re: Integration of Large Loads to be effective 2/1/2027,' Filed Date 11/16/26, Accession 20261116-5335. This confirms the docket number and joint-filer structure; the filed tariff/testimony text itself still was not opened, so no numeric term from it is stated here.
Stated terms
This tariff does not yet have terms we can tabulate. The status text above is what the filings and our source state. See the source below.
Source
FERC eLibrary's own Advanced Search index (elibrary.ferc.gov/eLibrarywebapi/api/Search/AdvancedSearch), queried directly 2026-11-17 for accession numbers 20261116-5282 (ER27-517) and 20261116-5286 (ER27-518); the filed PDFs themselves were not downloaded or read. Utility Dive, 'Grid operators file closely watched large load interconnection reforms at FERC,' Ethan Howland, Nov. 17, 2026 (read directly, https://www.utilitydive.com/news/pjm-rto-large-load-interconnection-ferc-show-cause/874872/). Federal Register document index, re-queried 2026-11-19 for "ER27-517": no order found. Federal Register Combined Notice of Filings #1, Nov 23, 2026 issue (FR Doc. 2026-23765), downloaded from govinfo.gov (govinfo.gov/content/pkg/FR-2026-11-23/pdf/2026-23765.pdf) and read in full via pdftotext 2026-11-21, confirming ER27-529-000's applicants and description text.