Free tool
Compare large-load tariffs side by side
Pick up to three utilities. See status, the contract term, the minimum bill, collateral and exit fee each filing states, with the source. Add a size and a demand charge to see what the minimum costs in dollars.
Comparison
| New York ISO (NYISO), large loads interconnection and cost-recovery framework (FERC) | |
|---|---|
| Status | Pending |
| Applies at | Not a retail tariff -- a market/interconnection-process and cost-recovery filing for large loads across NYISO's footprint |
| Last reviewed | 2026-11-22 |
| Contract term | Not in structured terms yet; see the source |
| Ramp | Not in structured terms yet; see the source |
| Take-or-pay (minimum bill) | Not in structured terms yet; see the source |
| Collateral | Not in structured terms yet; see the source |
| Exit fee | Not in structured terms yet; see the source |
| Notice to reduce or end | Not in structured terms yet; see the source |
| Time to power | Not in structured terms yet; see the source |
| Source | FERC eLibrary's own Advanced Search index (elibrary.ferc.gov/eLibrarywebapi/api/Search/AdvancedSearch), queried directly 2026-11-17 for accession numbers 20261116-5282 (ER27-517) and 20261116-5286 (ER27-518); the filed PDFs themselves were not downloaded or read. Utility Dive, 'Grid operators file closely watched large load interconnection reforms at FERC,' Ethan Howland, Nov. 17, 2026 (read directly, https://www.utilitydive.com/news/pjm-rto-large-load-interconnection-ferc-show-cause/874872/). Federal Register document index, re-queried 2026-11-19 for "ER27-517": no order found. Federal Register Combined Notice of Filings #1, Nov 23, 2026 issue (FR Doc. 2026-23765), downloaded from govinfo.gov (govinfo.gov/content/pkg/FR-2026-11-23/pdf/2026-23765.pdf) and read in full via pdftotext 2026-11-21, confirming ER27-529-000's applicants and description text. |
Shaded rows differ between the utilities. Faded values are not stated in the filings we read.
Screening information from public filings, not legal or investment advice. The utility's signed agreement controls. See all coverage · Commitment estimator · Check a site