Arizona Electric Power Cooperative (AEPCO) and member distribution cooperatives, streamlined large-load service agreement review process
Large-load tariff for data centers: what is on file, the terms the filings state, and where each fact comes from. Terms a filing does not state are marked, never guessed.
StatusLaw or process only Last reviewed 2026-11-17
Applies atNo MW threshold stated in secondary coverage -- a process for 'large-load' service agreements generally (e.g. data centers), not a rate schedule
What the filing saysRULES_ONLY -- a review PROCESS, not a rate tariff. AEPCO (the cooperatives' wholesale power provider) and its five retail distribution cooperatives (Duncan Valley, Graham County, Mohave, Sulphur Springs Valley and Trico Electric) jointly asked the ACC to approve a standardized, checklist-based process for reviewing proposed electric service agreements between the cooperatives and large-load customers such as data centers. The ACC voted unanimously to approve the joint application at its Aug 12, 2026 Open Meeting (read directly from the ACC's own press release): each proposed large-load agreement will be reviewed by Utilities Division Staff against at least three criteria -- whether it serves the public interest, whether the rates charged are reasonable, and whether no other customer class subsidizes the large-load customer's commercial activity -- and the Commission will then approve, deny or amend it; large-load customers remain responsible for all costs of commercial service, including new infrastructure and transmission construction. No MW threshold, specific agreement, or named project was stated in the ACC's release or in publicpower.org's trade coverage (reported). This run's regulator-filing-watch leads showed further 'Document Filed' activity across all six of the dockets above between Nov 9 and Nov 13, 2026 -- almost certainly individual large-load service agreements now moving through this newly-approved process -- but edocket.azcc.gov's JavaScript application could not be rendered by this run's tools and is not on the GridPermit fetch relay's allowed-host list, so none of those specific filings' titles or content could be read; they may describe a real, specific large-load agreement worth its own entry once the site is reachable.
Stated terms
This tariff does not yet have terms we can tabulate. The status text above is what the filings and our source state. See the source below.
Source
Arizona Corporation Commission press release, Aug 13, 2026 (azcc.gov, read directly): https://azcc.gov/news/home/2026/08/13/acc-approves-measure-to-ensure-electric-cooperative-customers-don-t-pay-for-large-load-growth; Public Power Association trade coverage (publicpower.org, reported): https://www.publicpower.org/periodical/article/arizona-regulators-approve-proposal-ensure-electric-cooperative-customers-dont-pay-large-load-growth. The underlying joint application and approving order (ACC eDocket, Docket E-01773A-26-0123 and the five sibling dockets listed above) were not opened.