Free tool
Compare large-load tariffs side by side
Pick up to three utilities. See status, the contract term, the minimum bill, collateral and exit fee each filing states, with the source. Add a size and a demand charge to see what the minimum costs in dollars.
Comparison
| Arizona Electric Power Cooperative (AEPCO) and member distribution cooperatives, streamlined large-load service agreement review process | |
|---|---|
| Status | Law or process only |
| Applies at | No MW threshold stated in secondary coverage -- a process for 'large-load' service agreements generally (e.g. data centers), not a rate schedule |
| Last reviewed | 2026-11-17 |
| Contract term | Not in structured terms yet; see the source |
| Ramp | Not in structured terms yet; see the source |
| Take-or-pay (minimum bill) | Not in structured terms yet; see the source |
| Collateral | Not in structured terms yet; see the source |
| Exit fee | Not in structured terms yet; see the source |
| Notice to reduce or end | Not in structured terms yet; see the source |
| Time to power | Not in structured terms yet; see the source |
| Source | Arizona Corporation Commission press release, Aug 13, 2026 (azcc.gov, read directly): https://azcc.gov/news/home/2026/08/13/acc-approves-measure-to-ensure-electric-cooperative-customers-don-t-pay-for-large-load-growth; Public Power Association trade coverage (publicpower.org, reported): https://www.publicpower.org/periodical/article/arizona-regulators-approve-proposal-ensure-electric-cooperative-customers-dont-pay-large-load-growth. The underlying joint application and approving order (ACC eDocket, Docket E-01773A-26-0123 and the five sibling dockets listed above) were not opened. |
Shaded rows differ between the utilities. Faded values are not stated in the filings we read.
Screening information from public filings, not legal or investment advice. The utility's signed agreement controls. See all coverage · Commitment estimator · Check a site