Free tool
Compare large-load tariffs side by side
Pick up to three utilities. See status, the contract term, the minimum bill, collateral and exit fee each filing states, with the source. Add a size and a demand charge to see what the minimum costs in dollars.
Comparison
| Virginia Electric and Power Co. (Dominion Energy Virginia), GS-5 rate class | |
|---|---|
| Status | Approved |
| Applies at | 25 MW or greater on a contiguous site, and load factor of at least 75% |
| Last reviewed | 2025-11-25 |
| Contract term | 14 years (includes the ramp) |
| Ramp | Up to 4 years |
| Take-or-pay (minimum bill) | 85% of contract capacity billed monthly whether used or not |
| Collateral | $1.5 million per MW |
| Exit fee | Not stated in the filings we read |
| Notice to reduce or end | Not stated in the filings we read |
| Time to power | Not stated in the filings we read |
| Source | https://www.scc.virginia.gov/docketsearch/DOCS/89g601!.PDF (final order, Case PUR-2025-00058) |
Shaded rows differ between the utilities. Faded values are not stated in the filings we read.
Screening information from public filings, not legal or investment advice. The utility's signed agreement controls. See all coverage · Commitment estimator · Check a site