Free tool

Compare large-load tariffs side by side

Pick up to three utilities. See status, the contract term, the minimum bill, collateral and exit fee each filing states, with the source. Add a size and a demand charge to see what the minimum costs in dollars.

Comparison

PJM Interconnection, large load and co-located load tariff framework (FERC)
StatusPending
Applies atNot a retail tariff -- defines PJM's own 'Large Load' and 'Large Computational Load' categories and co-located-load service rules for its footprint
Last reviewed2026-11-22
Contract termNot in structured terms yet; see the source
RampNot in structured terms yet; see the source
Take-or-pay (minimum bill)Not in structured terms yet; see the source
CollateralNot in structured terms yet; see the source
Exit feeNot in structured terms yet; see the source
Notice to reduce or endNot in structured terms yet; see the source
Time to powerNot in structured terms yet; see the source
SourceFERC eLibrary's own Advanced Search index (elibrary.ferc.gov/eLibrarywebapi/api/Search/AdvancedSearch), queried directly 2026-11-17 for accession numbers 20261109-5217 (ER26-3515-002), 20261116-5309 (ER27-522) and 20261116-5300 (ER27-520); the filed PDFs themselves were not downloaded or read. Federal Register document index (federalregister.gov/api/v1/documents.json), queried directly 2026-11-18 and 2026-11-19 for "ER26-3515": no order found since the Nov 16 combined notice. Utility Dive, 'Grid operators file closely watched large load interconnection reforms at FERC,' Ethan Howland, Nov. 17, 2026 (read directly, https://www.utilitydive.com/news/pjm-rto-large-load-interconnection-ferc-show-cause/874872/). PJM's cifp-lla page, re-read directly 2026-11-19 (navigation chrome only, no content change): https://www.pjm.com/committees-and-groups/cifp-lla. pjm.com/committees-and-groups/cifp-lla re-fetched directly 2026-11-20 (navigation chrome only, no content change).

Shaded rows differ between the utilities. Faded values are not stated in the filings we read.

Screening information from public filings, not legal or investment advice. The utility's signed agreement controls. See all coverage · Commitment estimator · Check a site