Compare large-load tariffs side by side
Pick up to three utilities. See status, the contract term, the minimum bill, collateral and exit fee each filing states, with the source. Add a size and a demand charge to see what the minimum costs in dollars.
Comparison
| Pacific Gas & Electric (PG&E) | |
|---|---|
| Status | Pending |
| Applies at | No explicit MW threshold found -- Rule 30 targets transmission-level (not distribution-level) interconnection, which in practice means large loads |
| Last reviewed | 2026-10-12 |
| Contract term | Not stated in the filings we read |
| Ramp | Not stated in the filings we read |
| Take-or-pay (minimum bill) | Not stated in the filings we read |
| Collateral | Applicants pay 100% of required transmission infrastructure costs up front as a prefunded loan (interim implementation, July 2025) |
| Exit fee | Not stated in the filings we read |
| Notice to reduce or end | Not stated in the filings we read |
| Time to power | Not stated in the filings we read |
| Source | PG&E Application A.24-11-007; CPUC interim decision, July 24, 2025; CPUC Resolution E-5420 (STACK Infrastructure), Oct 2025; Downey Brand legal alert summarizing both. |
Shaded rows differ between the utilities. Faded values are not stated in the filings we read.
Screening information from public filings, not legal or investment advice. The utility's signed agreement controls. See all coverage · Commitment estimator · Check a site