Compare large-load tariffs side by side

Pick up to three utilities. See status, the contract term, the minimum bill, collateral and exit fee each filing states, with the source. Add a size and a demand charge to see what the minimum costs in dollars.

Comparison

Northern Virginia Electric Cooperative (NOVEC), Schedule HV-1 Large Power Dedicated Distribution Service
StatusApproved
Applies atNew or additional separately metered load of at least 5,000 kW (5 MW), with an average annual load factor of at least 70%, served at 115 kV or higher
Last reviewed2026-10-14
Contract termNegotiable but structured to recover the full cost of distribution and sub-transmission plant; the length is in the agreement, not the schedule
RampNot stated in the filings we read
Take-or-pay (minimum bill)Not stated in the filings we read
CollateralNot stated in the filings we read
Exit feeNot stated in the filings we read
Notice to reduce or endNot stated in the filings we read
Time to powerNot stated in the filings we read
SourceNOVEC Schedule HV-1, effective 4/1/2023 (novec.com, read).

Shaded rows differ between the utilities. Faded values are not stated in the filings we read.