Free tool
Compare large-load tariffs side by side
Pick up to three utilities. See status, the contract term, the minimum bill, collateral and exit fee each filing states, with the source. Add a size and a demand charge to see what the minimum costs in dollars.
Comparison
| Mecklenburg Electric Cooperative (Virginia), Schedule LPS-U large power service | |
|---|---|
| Status | Approved |
| Applies at | Annual demand averaging 5,000 kW or more a month, and an actual and projected annual average of 25 MW or more (large load consumer, per the cooperative's terms and conditions) |
| Last reviewed | 2026-10-14 |
| Contract term | Not stated in the filings we read |
| Ramp | Not stated in the filings we read |
| Take-or-pay (minimum bill) | Not stated in the filings we read |
| Collateral | Security deposit set by the cooperative in its sole discretion, as a surety bond, letter of credit, parent guarantee or cash, recalculated at least yearly (Virginia SCC order, Case PUR-2025-00160) |
| Exit fee | Not stated in the filings we read |
| Notice to reduce or end | Not stated in the filings we read |
| Time to power | Not stated in the filings we read |
| Source | Virginia SCC Final Order, Case No. PUR-2025-00160 (scc.virginia.gov, read in full); the LPS-U tariff sheet was not read. |
Shaded rows differ between the utilities. Faded values are not stated in the filings we read.
Screening information from public filings, not legal or investment advice. The utility's signed agreement controls. See all coverage · Commitment estimator · Check a site