Free tool
Compare large-load tariffs side by side
Pick up to three utilities. See status, the contract term, the minimum bill, collateral and exit fee each filing states, with the source. Add a size and a demand charge to see what the minimum costs in dollars.
Comparison
| Louisiana PSC Private Use Electrical Network (PEN) rule (Docket R-37905) | |
|---|---|
| Status | Pending |
| Applies at | Staff's proposed rule: new industrial or digital load of 50 MW or more operating at an 80% or higher average monthly load factor |
| Last reviewed | 2026-11-18 |
| Contract term | Not in structured terms yet; see the source |
| Ramp | Not in structured terms yet; see the source |
| Take-or-pay (minimum bill) | Not in structured terms yet; see the source |
| Collateral | Not in structured terms yet; see the source |
| Exit fee | Not in structured terms yet; see the source |
| Notice to reduce or end | Not in structured terms yet; see the source |
| Time to power | Not in structured terms yet; see the source |
| Source | LPSC Docket R-37905: Staff's Final Report and Recommendation Containing Staff's Final Proposed Rules (filed Nov 4, 2026, read in full via pdftotext), lpscpubvalence.lpsc.louisiana.gov; Correspondence to Oppose the Form of the Final Proposed Rules for Private Use Electrical Networks, filed on behalf of the Louisiana Energy Users Group/Louisiana Chemistry Association/Louisiana Mid-Continent Oil & Gas Association (filed Nov 16, 2026, read in full via pdftotext), same docket. |
Shaded rows differ between the utilities. Faded values are not stated in the filings we read.
Screening information from public filings, not legal or investment advice. The utility's signed agreement controls. See all coverage · Commitment estimator · Check a site