Comparison
| Interstate Power and Light (Alliant Energy Iowa), Rider ICR Individual Customer Rate | |
|---|---|
| Status | Approved |
| Applies at | 25 MW or more (25,000 kW) at a single metering point, served at 69 kV or above, with an expected 80% load factor and 175,000 MWh a year, or demonstrated ability to curtail to a firm demand level |
| Last reviewed | 2026-10-14 |
| Contract term | Minimum term of 5 years; a longer term can be required (Rider ICR) |
| Ramp | Not stated in the filings we read |
| Take-or-pay (minimum bill) | Not stated in the filings we read |
| Collateral | Not stated in the filings we read |
| Exit fee | Not stated in the filings we read |
| Notice to reduce or end | Not stated in the filings we read |
| Time to power | Not stated in the filings we read |
| Source | IPL Rider ICR tariff sheets 80-82 (Alliant Energy, read in full); EEI Large Load Projects and Tariffs, Sept 2026, for the agreement docket numbers (not independently opened). |