Compare large-load tariffs side by side
Pick up to three utilities. See status, the contract term, the minimum bill, collateral and exit fee each filing states, with the source. Add a size and a demand charge to see what the minimum costs in dollars.
Comparison
| FirstEnergy Ohio (Ohio Edison, Cleveland Electric Illuminating, Toledo Edison), proposed Data Center Tariff | |
|---|---|
| Status | Pending |
| Applies at | Not confirmed (the proposed threshold was not read) |
| Last reviewed | 2026-10-14 |
| Contract term | Not in structured terms yet; see the source |
| Ramp | Not in structured terms yet; see the source |
| Take-or-pay (minimum bill) | Not in structured terms yet; see the source |
| Collateral | Not in structured terms yet; see the source |
| Exit fee | Not in structured terms yet; see the source |
| Notice to reduce or end | Not in structured terms yet; see the source |
| Time to power | Not in structured terms yet; see the source |
| Source | PUCO docket index for 26-0697-EL-ATA (read Oct 2026); EEI list, Sept 2026. |