Compare large-load tariffs side by side
Pick up to three utilities. See status, the contract term, the minimum bill, collateral and exit fee each filing states, with the source. Add a size and a demand charge to see what the minimum costs in dollars.
Choose at least one utility above, or start from one of these:
Indiana Michigan Power (AEP) vs AEP Ohio vs Virginia Electric and Power Co. (Dominion Energy Virginia)Consumers Energy (Rate GPD large-load / data center provision) vs Evergy Kansas Central / Evergy Kansas South (Schedule LLPS) vs Florida Power & Light (LLCS-1 Large-Load Contract Service)Kentucky Utilities (Rate EHLF vs Evergy Metro / Evergy Missouri West (Large Load Power Service vs Union Electric Company d/b/a Ameren Missouri (Large Load Rate Plan)
Screening information from public filings, not legal or investment advice. The utility's signed agreement controls. See all coverage · Commitment estimator · Check a site