Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 2 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Nine Mile Point Nuclear Station independent owner | Constellation Nuclear | NY | operating | 1,901 | Nuclear | 1969 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Seminole (FL) utility owner | Seminole Electric Cooperative Inc | FL | operating | 1,898 | Gas | 1984 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Forney Energy Center independent owner | LaFrontera Holdings LLC | TX | operating | 1,894 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Keystone independent owner | KeyCon Operating LLC | PA | operating | 1,883 | Coal | 1967 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cardinal independent owner | Cardinal Operating Company | OH | operating | 1,880 | Coal | 1967 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Laramie River Station utility owner | Basin Electric Power Coop | WY | operating | 1,863 | Coal | 1981 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Midland Cogeneration Venture independent owner | Midland Cogeneration Venture | MI | operating | 1,854 | Gas | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Paradise utility owner | Tennessee Valley Authority | KY | operating | 1,854 | Gas | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Calvert Cliffs Nuclear Power Plant independent owner | Constellation Nuclear | MD | operating | 1,850 | Nuclear | 1975 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Limestone independent owner | NRG Texas Power LLC | TX | operating | 1,850 | Coal | 1985 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dynegy Moss Landing Power Plant Hybrid independent owner | Dynegy -Moss Landing LLC | CA | operating | 1,848 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Edwin I Hatch utility owner | Georgia Power Co | GA | operating | 1,848 | Nuclear | 1975 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | San Juan utility owner | Public Service Co of NM | NM | retired | 1,848 | Coal | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Beaver Valley independent owner | Energy Harbor Nuclear Generation LLC | PA | operating | 1,847 | Nuclear | 1976 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Arkansas Nuclear One utility owner | Entergy Arkansas LLC | AR | operating | 1,845 | Nuclear | 1974 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kingston planned, approvals not started | Tennessee Valley Authority | TN | planned | 1,831 | Gas | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Chalk Point Power independent owner | Chalk Point Power, LLC | MD | operating | 1,825 | Gas | 1967 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | The Dalles utility owner | USACE Northwestern Division | OR | operating | 1,820 | Hydro | 1957 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sabine utility owner | Entergy Texas Inc. | TX | operating | 1,812 | Gas | 1962 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Oswego Harbor Power independent owner | Oswego Harbor Power | NY | operating | 1,804 | Oil | 1975 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Independence Steam Electric Station utility owner | Entergy Arkansas LLC | AR | operating | 1,800 | Coal | 1983 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | White Bluff utility owner | Entergy Arkansas LLC | AR | operating | 1,800 | Coal | 1980 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Big Bend utility owner | Tampa Electric Co | FL | operating | 1,797 | Gas | 1970 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Oak Grove (TX) independent owner | Luminant Generation Company LLC | TX | operating | 1,795 | Coal | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Powerton independent owner | Midwest Generations EME LLC | IL | operating | 1,786 | Coal | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Springerville utility owner | Tucson Electric Power Co | AZ | operating | 1,779 | Coal | 1985 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Joseph M Farley utility owner | Alabama Power Co | AL | operating | 1,776 | Nuclear | 1977 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Greensville County Power Station utility owner | Virginia Electric & Power Co | VA | operating | 1,773 | Gas | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Prairie State Generating Station independent owner | Prairie State Generating Co LLC | IL | operating | 1,766 | Coal | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TalenEnergy Montour independent owner | TalenEnergy Montour LLC | PA | operating | 1,758 | Gas | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Iatan utility owner | Evergy Metro | MO | operating | 1,754 | Coal | 1980 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Harllee Branch utility owner | Georgia Power Co | GA | retired | 1,746 | Coal | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Linden Generating Station independent owner | Linden Combined Cycle | NJ | operating | 1,740 | Gas | 1995 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Haynes utility owner | Los Angeles Department of Water & Power | CA | operating | 1,739 | Gas | 1962 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Midlothian Energy Facility independent owner | Midlothian Energy LLC | TX | operating | 1,734 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hatfields Ferry Power Station independent owner | Allegheny Energy Supply Co LLC | PA | retired | 1,728 | Coal | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Okeechobee Clean Energy Center utility owner | Florida Power & Light Co | FL | operating | 1,723 | Gas | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Muskogee utility owner | Oklahoma Gas & Electric Co | OK | operating | 1,716 | Gas | 1977 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Raccoon Mountain utility owner | Tennessee Valley Authority | TN | operating | 1,714 | Hydro | 1978 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Brame Energy Center utility owner | Cleco Power LLC | LA | operating | 1,707 | Oil | 1975 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sherburne County utility owner | Northern States Power Co - Minnesota | MN | operating | 1,704 | Coal | 1976 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Seminole (OK) utility owner | Oklahoma Gas & Electric Co | OK | operating | 1,701 | Gas | 1971 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TalenEnergy Martins Creek independent owner | TalenEnergy Martins Creek LLC | PA | operating | 1,701 | Gas | 1975 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kingston utility owner | Tennessee Valley Authority | TN | operating | 1,700 | Coal | 1954 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Surry utility owner | Virginia Electric & Power Co | VA | operating | 1,695 | Nuclear | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fayette Power Project utility owner | Lower Colorado River Authority | TX | operating | 1,690 | Coal | 1979 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Castaic utility owner | Los Angeles Department of Water & Power | CA | operating | 1,682 | Hydro | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mt Storm utility owner | Virginia Electric & Power Co | WV | operating | 1,681 | Coal | 1965 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bad Creek utility owner | Duke Energy Carolinas, LLC | SC | operating | 1,680 | Hydro | 1991 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Johnsonville utility owner | Tennessee Valley Authority | TN | operating | 1,676 | Gas | 1975 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Belle River utility owner | DTE Electric Company | MI | operating | 1,664 | Coal | 1981 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Walter Scott Jr Energy Center utility owner | MidAmerican Energy Co | IA | operating | 1,648 | Coal | 1978 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Colstrip independent owner | Talen Montana LLC | MT | operating | 1,647 | Coal | 1984 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Four Corners utility owner | Arizona Public Service Co | NM | operating | 1,636 | Coal | 1969 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mohave utility owner | Southern California Edison Co | NV | retired | 1,636 | Coal | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mitchell (WV) utility owner | Kentucky Power Co | WV | operating | 1,633 | Coal | 1971 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lagoon Creek utility owner | Tennessee Valley Authority | TN | operating | 1,625 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Brunner Island independent owner | Brunner Island LLC | PA | operating | 1,616 | Gas | 1961 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ormond Beach independent owner | Ormond Beach Power, LLC | CA | operating | 1,612 | Gas | 1971 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Brayton Point independent owner | Brayton Point Energy LLC | MA | retired | 1,611 | Coal | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | H L Spurlock utility owner | East Kentucky Power Coop, Inc | KY | operating | 1,609 | Coal | 1977 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Temple Power Station independent owner | Temple Generation Holdings LLC | TX | operating | 1,606 | Gas | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | La Cygne utility owner | Evergy Metro | KS | operating | 1,599 | Coal | 1973 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Shawnee utility owner | Tennessee Valley Authority | KY | operating | 1,575 | Coal | 1953 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Northport utility owner | National Grid Generation LLC | NY | operating | 1,564 | Gas | 1967 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Franklin Farms 1&2 approvals pending | Entergy Louisiana LLC | LA | planned | 1,561 | Gas | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | J H Campbell utility owner | Consumers Energy Co - (MI) | MI | operating | 1,561 | Coal | 1962 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Richland Parish Power Station 1&2 planned, approvals not started | Entergy Louisiana LLC | LA | planned | 1,561 | Gas | 2030 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cumberland (TN) under construction | Tennessee Valley Authority | TN | planned | 1,556 | Gas | 2034 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | St Clair utility owner | DTE Electric Company | MI | retired | 1,552 | Coal | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | James E. Rogers Energy Complex utility owner | Duke Energy Carolinas, LLC | NC | operating | 1,531 | Gas | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cedar Bayou independent owner | NRG Texas Power LLC | TX | operating | 1,530 | Gas | 1970 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Muskingum River independent owner | AEP Generation Resources Inc | OH | retired | 1,529 | Coal | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bison Generation Station approvals pending | Basin Electric Power Coop | ND | planned | 1,518 | Gas | 2030 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lackawanna Energy Center independent owner | Invenergy Services LLC | PA | operating | 1,499 | Gas | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Canal independent owner | Canal Generating LLC | MA | operating | 1,495 | Oil | 1968 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | J K Spruce utility owner | City of San Antonio - (TX) | TX | operating | 1,489 | Coal | 1992 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Northeastern utility owner | Public Service Co of Oklahoma | OK | operating | 1,478 | Gas | 1961 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | P L Bartow utility owner | Duke Energy Florida, LLC | FL | operating | 1,476 | Gas | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Brunswick County Power Station utility owner | Virginia Electric & Power Co | VA | operating | 1,472 | Gas | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hunter utility owner | PacifiCorp | UT | operating | 1,472 | Coal | 1978 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Warren County utility owner | Virginia Electric & Power Co | VA | operating | 1,472 | Gas | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Chuck Lenzie Generating Station utility owner | Nevada Power Co | NV | operating | 1,466 | Gas | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | E W Brown utility owner | Kentucky Utilities Co | KY | operating | 1,458 | Gas | 1971 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Polk utility owner | Tampa Electric Co | FL | operating | 1,458 | Gas | 1996 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | York Energy Center independent owner | Calpine Mid-Merit LLC | PA | operating | 1,449 | Gas | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dania Beach 7 utility owner | Florida Power & Light Co | FL | operating | 1,448 | Gas | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Yates planned, approvals not started | Georgia Power Co | GA | planned | 1,448 | Gas | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | CPV Basin Ranch Energy Center under construction | CPV Basin Ranch | TX | planned | 1,445 | Gas | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Grand Gulf utility owner | System Energy Resources, Inc | MS | operating | 1,440 | Nuclear | 1985 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cottonwood Energy Company LP independent owner | Cottonwood Energy Company LP | TX | operating | 1,434 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | R S Nelson utility owner | Entergy Louisiana LLC | LA | operating | 1,434 | Coal | 1959 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Redbud Power Plant utility owner | Oklahoma Gas & Electric Co | OK | operating | 1,434 | Gas | 2004 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Walter C Beckjord utility owner | Duke Energy Ohio Inc | OH | retired | 1,433 | Coal | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hanging Rock Energy Facility independent owner | Dynegy Hanging Rock Energy Facility | OH | operating | 1,430 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Craig (CO) utility owner | Tri-State G & T Assn, Inc | CO | operating | 1,428 | Coal | 1979 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | W H Zimmer independent owner | Dynegy W H Zimmer | OH | retired | 1,426 | Coal | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gorgas utility owner | Alabama Power Co | AL | retired | 1,417 | Coal | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Northside Generating Station utility owner | JEA | FL | operating | 1,407 | Coal | 1966 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Elm Road Generating Station utility owner | Wisconsin Electric Power Co | WI | operating | 1,403 | Coal | 2010 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.