Nevada Power Co. / Sierra Pacific Power Co. (NV Energy)
Large-load tariff for data centers: what is on file, the terms the filings state, and where each fact comes from. Terms a filing does not state are marked, never guessed.
StatusApproved Last reviewed 2026-10-12
Applies at5 MW or more average annual load (Clean Transition Tariff eligibility)
What the filing saysClean Transition Tariff (Schedule CTT) approved by the Public Utilities Commission of Nevada, Docket 24-05023 (Advice Letter No. 674-E), March 13, 2025 -- developed in partnership with Google. Lets an eligible fully-bundled large retail customer (>=5 MW average annual load) receive bundled service from new clean energy resources built for them; this is a voluntary resource-sourcing option, not a mandatory large-load deposit/interconnection-study tariff. Separately, NV Energy has proposed a "Large Load Electric Service Agreement" requiring long-term commitments and infrastructure cost recovery from large loads generally -- still pending as of this research, not confirmed approved.
Stated terms
This tariff does not yet have terms we can tabulate. The status text above is what the filings and our source state. See the source below.
Source
RTO Insider, "Nevada Regulators Approve NV Energy Clean Transition Tariff" (March 2025); Public Utilities Commission of Nevada Docket 24-05023.
Compare with other utilitiesEstimate the commitment in dollarsCheck a site in Nevada Power Co. / Sierra Pacific Power Co. (NV Energy) territory
Get an email when this changes
Screening information from public filings, not legal or investment advice. Tariffs change; confirm the current terms with the utility and the commission before relying on them.