Every GridPermit post tagged “Guide.” Back to the full blog.

October 5, 2026 · Brendan Hogan

What to Have Ready Before You Ask a Utility for a Large-Load Study

Utilities won't study a large load on a hunch. Before you submit, you need site control, a credible load ramp, a site plan, and a clear picture of who will pay for what. Here is the checklist we use to see whether a project is ready to be studied.

October 5, 2026 · Brendan Hogan

How a Large-Load Tariff Works, and What the Minimum Bill Really Means

A large-load tariff sets the terms for a data center's power, and the minimum bill decides who pays if the load never fully shows up. Here is how the rules differ by utility and what to check before you sign anything.