Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 5 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Sunscape Renewable Energy planned, approvals not started | Vesper Energy Development LLC | TX | planned | 1,000 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Traverse Wind Project, LLC utility owner | Southwestern Electric Power Co | OK | operating | 999 | Wind | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dutchman Solar generation and BESS approvals pending | DUTC bn, LLC | WY | planned | 998 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | John Sevier utility owner | Tennessee Valley Authority | TN | operating | 997 | Gas | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | El Segundo Power independent owner | NRG El Segundo Operations Inc | CA | retired | 996 | Gas | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Oleander Power Project LP independent owner | Oleander Holdings LLC | FL | operating | 994 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | McNary utility owner | USACE Northwestern Division | OR | operating | 991 | Hydro | 1953 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hays Energy Project independent owner | Hays Energy, LLC | TX | operating | 989 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Broad River Energy Center independent owner | Broad River Energy LLC | SC | operating | 985 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crane Clean Energy Center independent owner | Constellation Nuclear | PA | operating | 981 | Nuclear | 1974 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wayne County Energy Complex utility owner | Duke Energy Progress - (NC) | NC | operating | 980 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rockingham County CT Station utility owner | Duke Energy Carolinas, LLC | NC | operating | 978 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rolling Hills Generating independent owner | Rolling Hills Generating LLC | OH | operating | 978 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Trumbull Energy Center independent owner | Clean Energy Future - Trumbull, LLC. | OH | operating | 977 | Gas | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Linden Cogen Plant independent owner | EFS Cogen Holdings I LLC | NJ | operating | 974 | Gas | 1992 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Zeeland Generating Station utility owner | Consumers Energy Co - (MI) | MI | operating | 968 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sycamore Riverside Energy, LLC planned, approvals not started | Invenergy Services LLC | IN | planned | 964 | Gas | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Middletown- Ohio independent owner | Clean Energy Future-Lordstown, LLC | OH | operating | 962 | Gas | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | High Desert Power Plant independent owner | MRP Generation Holdings, LLC | CA | operating | 960 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Michoud utility owner | Entergy New Orleans, LLC | LA | retired | 959 | Gas | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Astoria Generating Station independent owner | Astoria Generating Company, L.P. | NY | operating | 958 | Gas | 1954 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | W S Lee utility owner | Duke Energy Carolinas, LLC | SC | operating | 955 | Gas | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Antelope Valley utility owner | Basin Electric Power Coop | ND | operating | 954 | Coal | 1984 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hammond utility owner | Georgia Power Co | GA | retired | 953 | Coal | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Harris (NC) utility owner | Duke Energy Progress - (NC) | NC | operating | 951 | Nuclear | 1987 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Arkansas Cypress Solar Station planned, approvals not started | Entergy Arkansas LLC | AR | planned | 950 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bull Run utility owner | Tennessee Valley Authority | TN | retired | 950 | Coal | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Priest Rapids utility owner | PUD No 2 of Grant County - (WA) | WA | operating | 950 | Hydro | 1959 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Snowflake A Solar and BESS approvals pending | Clenera DevCo LLC | AZ | planned | 950 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Weston utility owner | Wisconsin Public Service Corp | WI | operating | 946 | Coal | 1981 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Delta Energy Center independent owner | Delta Energy Center LLC | CA | operating | 944 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | River Rouge utility owner | DTE Electric Company | MI | retired | 944 | Coal | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tenaska Frontier Generation Station independent owner | Tenaska Frontier Partners Ltd | TX | operating | 940 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tenaska Gateway Generating Station independent owner | Tenaska Gateway Partners Ltd | TX | operating | 940 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tenaska Lindsay Hill Generating Station utility owner | Alabama Power Co | AL | operating | 939 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | J K Smith utility owner | East Kentucky Power Coop, Inc | KY | operating | 938 | Gas | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Baytown Energy Center independent owner | Baytown Energy Center LLC | TX | operating | 933 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Formosa Utility Venture Ltd independent owner | Formosa Plastics Corp | TX | operating | 933 | Gas | 1987 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | J T Deely utility owner | City of San Antonio - (TX) | TX | retired | 932 | Coal | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lake Hubbard independent owner | Luminant Generation Company LLC | TX | operating | 928 | Gas | 1970 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Central Alabama Generating Station utility owner | Alabama Power Co | AL | operating | 927 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Davis Besse independent owner | Energy Harbor Nuclear Generation LLC | OH | operating | 925 | Nuclear | 1977 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Channel Energy Center LLC independent owner | Channel Energy Center LLC | TX | operating | 924 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sunrise Wind under construction | Orsted Wind Power North America LLC | NY | planned | 924 | Wind | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Clay Boswell utility owner | ALLETE, Inc. | MN | operating | 923 | Coal | 1973 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Coughlin Power Station utility owner | Cleco Power LLC | LA | operating | 923 | Gas | 1961 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Robert E Ritchie utility owner | Entergy Arkansas LLC | AR | retired | 923 | Gas | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Waterford Power, LLC independent owner | Waterford Power, LLC | OH | operating | 922 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dahlberg independent owner | Southern Power Co | GA | operating | 919 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Jack Watson utility owner | Mississippi Power Co | MS | operating | 919 | Gas | 1968 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Channelview Cogeneration Plant independent owner | EIF Channelview Cogeneration LLC | TX | operating | 918 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Robert Moses Power Dam utility owner | New York Power Authority | NY | operating | 912 | Hydro | 1958 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Green Country Power Station utility owner | Public Service Co of Oklahoma | OK | operating | 904 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ouachita utility owner | Entergy Louisiana LLC | LA | operating | 904 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TVA Southaven Combined Cycle utility owner | Tennessee Valley Authority | MS | operating | 904 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Decatur Energy Center independent owner | Decatur Energy Center LLC | AL | operating | 902 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | EmberYork interconnection agreement signed 2025-12; online expected 2028-01; request 28INR0089 | — | Austin Co., TX | planned | 900 | Gas | 2028 | ERCOT planned capacity changes |
| Power plant | Morgan Energy Center independent owner | Morgan Energy Center LLC | AL | operating | 900 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Naples Power Plant planned, approvals not started | Arkansas Electric Coop Corp | TX | planned | 900 | Gas | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Choctaw County utility owner | Entergy Mississippi LLC | MS | operating | 899 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hunterstown Power Plant independent owner | Hunterstown Generation, LLC | PA | operating | 898 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pioneer Generation Station utility owner | Basin Electric Power Coop | ND | operating | 897 | Gas | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Horseshoe Lake approvals received | Oklahoma Gas & Electric Co | OK | planned | 896 | Gas | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Taft Cogeneration Facility independent owner | Occidental Chemical Corporation | LA | operating | 894 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bethlehem Energy Center independent owner | GB II New York LLC | NY | operating | 893 | Gas | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ladysmith utility owner | Virginia Electric & Power Co | VA | operating | 893 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | O W Sommers utility owner | City of San Antonio - (TX) | TX | operating | 892 | Gas | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Batesville Generation Facility utility owner | Cooperative Energy | MS | operating | 891 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Charles Poletti utility owner | New York Power Authority | NY | retired | 883 | Oil | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | James A Fitzpatrick independent owner | Constellation Nuclear | NY | operating | 883 | Nuclear | 1976 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wilkes utility owner | Southwestern Electric Power Co | TX | operating | 882 | Gas | 1964 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Vast Sands Power under construction | Permian Power I LLC | TX | planned | 880 | Gas | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Arthur Kill Generating Station independent owner | Arthur Kill Power, LLC | NY | operating | 878 | Gas | 1959 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Scattergood utility owner | Los Angeles Department of Water & Power | CA | operating | 876 | Gas | 1958 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sam Bertron independent owner | NRG Texas Power LLC | TX | retired | 875 | Gas | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Avon Lake independent owner | GenOn Power Midwest, LP | OH | retired | 873 | Coal | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fore River Generating Station independent owner | Calpine Fore River Energy Center, LLC | MA | operating | 872 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hamilton Liberty independent owner | Hamilton Liberty O&M LLC | PA | operating | 870 | Gas | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hamilton Patriot Generation Plant independent owner | Hamilton Operating Services, LLC | PA | operating | 870 | Gas | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wabash River utility owner | Duke Energy Indiana, LLC | IN | retired | 868 | Coal | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wells utility owner | PUD No 1 of Douglas County - (WA) | WA | operating | 867 | Hydro | 1967 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | William F Wyman Hybrid independent owner | FPL Energy Wyman LLC | ME | operating | 863 | Oil | 1957 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Eddystone Generating Station independent owner | Constellation Power, Inc | PA | operating | 862 | Gas | 1967 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Green Power 2 independent owner | South Houston Green Power LLC | TX | operating | 861 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Jones utility owner | Southwestern Public Service Co | TX | operating | 860 | Gas | 1971 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Midulla Generating Station utility owner | Seminole Electric Cooperative Inc | FL | operating | 853 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mountain Creek independent owner | Mountain Creek Power, LLC | TX | operating | 852 | Gas | 1956 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | L V Sutton Combined Cycle utility owner | Duke Energy Progress - (NC) | NC | operating | 851 | Gas | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Quantum Choctaw Power LLC utility owner | Tennessee Valley Authority | MS | operating | 851 | Gas | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Clover utility owner | Virginia Electric & Power Co | VA | operating | 848 | Coal | 1995 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rocky Mountain Hydroelectric Plant utility owner | Oglethorpe Power Corporation | GA | operating | 848 | Hydro | 1995 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | CPV Towantic Energy Center independent owner | CPV Towantic, LLC | CT | operating | 842 | Gas | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lake Road Generating Plant independent owner | Lake Road Generating Co LP | CT | operating | 840 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ratcliffe utility owner | Mississippi Power Co | MS | operating | 840 | Gas | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Marcus Hook Energy LP independent owner | Marcus Hook Energy LP | PA | operating | 836 | Gas | 2004 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Carroll County Energy independent owner | Carroll County Energy LLC | OH | operating | 832 | Gas | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Key independent owner | Parkway Generation Keys Energy Center LLC | MD | operating | 831 | Gas | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Marsh Landing Generating Station independent owner | Marsh Landing LLC | CA | operating | 828 | Gas | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Perryville Power Station utility owner | Entergy Louisiana LLC | LA | operating | 824 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hillabee Energy Center independent owner | CER Generation LLC | AL | operating | 823 | Gas | 2010 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.