Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 37 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Bryan (TX) utility owner | City of Bryan - (TX) | TX | retired | 116 | Gas | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Consumer Operations LLC independent owner | Georgia-Pacific Consumer Oper. Green Bay LLC | WI | retired | 116 | Coal | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Deerhaven Renewable utility owner | Gainesville Regional Utilities | FL | operating | 116 | Other | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hardin Generator Project independent owner | Heorot Power Management | MT | operating | 116 | Coal | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | McPherson 3 utility owner | City of McPherson - (KS) | KS | operating | 116 | Gas | 1998 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Panther Creek Wind Farm II independent owner | RWE Clean Energy | TX | operating | 116 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Parowan Solar planned, approvals not started | Leeward Asset Management, LLC | UT | planned | 116 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Potter Station 2 utility owner | Town of Braintree - (MA) | MA | operating | 116 | Gas | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Prairie Winds ND1 utility owner | Basin Electric Power Coop | ND | operating | 116 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rolling Hills utility owner | PacifiCorp | WY | operating | 116 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Syl Laskin utility owner | ALLETE, Inc. | MN | operating | 116 | Gas | 1953 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wygen III utility owner | Black Hills Power, Inc. | WY | operating | 116 | Coal | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Star Dairy Solar interconnection agreement signed 2024-12; online expected 2027-07; request 25INR0164 | — | Lamar Co., TX | planned | 116 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Alfred Oaks Solar, LLC planned, approvals not started | Alfred Oaks Solar, LLC | NY | planned | 115 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Black Rock Wind independent owner | Black Rock Wind Force, LLC | WV | operating | 115 | Wind | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bluebell Solar II independent owner | Bluebell Solar II, LLC | TX | operating | 115 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Border Hybrid Energy Center independent owner | CalPeak Power, LLC | CA | operating | 115 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cos Cob independent owner | Connecticut Jet Power LLC | CT | operating | 115 | Oil | 1969 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Edgecombe Genco LLC independent owner | Edgecombe Operating Services LLC | NC | retired | 115 | Coal | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Edwards Sanborn E5 independent owner | Terra-Gen Operating Co-Hybrid | CA | operating | 115 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Guntersville utility owner | Tennessee Valley Authority | AL | operating | 115 | Hydro | 1939 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | James River Genco LLC independent owner | City Point Energy Center | VA | retired | 115 | Coal | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lake Mabel Solar and Battery Storage utility owner | Tampa Electric Co | FL | operating | 115 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Portsmouth Genco LLC independent owner | Portsmouth Operating Services LLC | VA | retired | 115 | Coal | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ranchland Wind Project I independent owner | Ranchland Wind Project I, LLC | TX | operating | 115 | Wind | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | South Branch Solar approvals pending | Leeward Asset Management, LLC | OH | planned | 115 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Spruance Operating Services LLC independent owner | Veolia Energy Operating Service | VA | operating | 115 | Gas | 1992 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Bacon II approvals received | SR Bacon II, LLC | GA | planned | 115 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Thermalito utility owner | California Dept. of Water Resources | CA | operating | 115 | Hydro | 1968 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wimauma Solar and Battery Storage utility owner | Tampa Electric Co | FL | operating | 115 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Zuni utility owner | Public Service Co of Colorado | CO | retired | 115 | Gas | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Callahan Divide Wind Energy Center independent owner | FPL Energy Callahan Wind, LLC | TX | operating | 114 | Wind | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Carmen Smith utility owner | Eugene Water & Electric Board | OR | operating | 114 | Hydro | 1963 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cedar Creek Solar approvals pending | FPS Cedar Creek Solar LLC | DE | planned | 114 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Clearwater Paper IPP Lewiston independent owner | Clearwater Paper Corporation | ID | operating | 114 | Other | 1950 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | CPV Rogue's Wind, LLC independent owner | CPV Rogue's Wind, LLC | PA | operating | 114 | Wind | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Daggett 1 independent owner | Daggett Solar Power 1 LLC | CA | operating | 114 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Domtar Paper Co LLC Plymouth NC independent owner | Domtar Paper Company LLC | NC | operating | 114 | Other | 1976 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Georgia-Pacific Muskogee independent owner | Georgia-Pacific Muskogee LLC | OK | operating | 114 | Gas | 1979 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Great Plains Windpark LLC independent owner | Great Plains Windpark Legacy LLC | TX | operating | 114 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hayrick BESS approvals pending | Gransolar Texas Five LLC | TX | planned | 114 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Marathon Bay Area Cogen independent owner | Tesoro Marketing & Refining Co. LLC (Martinez) | CA | operating | 114 | Gas | 1987 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nacogdoches Power utility owner | Austin Energy | TX | operating | 114 | Other | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Northeast (MI) utility owner | DTE Electric Company | MI | operating | 114 | Gas | 1966 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nucla utility owner | Tri-State G & T Assn, Inc | CO | retired | 114 | Coal | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Plains End independent owner | Plains End Operating Services LLC | CO | operating | 114 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Storm Lake 1 independent owner | ALLETE Clean Energy | IA | operating | 114 | Wind | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Winyah planned, approvals not started | South Carolina Public Service Authority | SC | planned | 114 | Oil | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Baron Winds II independent owner | RWE Clean Energy | NY | operating | 113 | Wind | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Boulder Flats Solar under construction, over half done | Boulder Flats Solar, LLC | NV | planned | 113 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Campbell Industrial Park utility owner | Hawaiian Electric Co Inc | HI | operating | 113 | Oil | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | El Centro Hybrid planned, approvals not started | Imperial Irrigation District | CA | planned | 113 | Gas | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | High Sheldon Wind Farm independent owner | Invenergy Services LLC | NY | operating | 113 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Separator (Etiwanda) BESS utility owner | Southern California Edison Co | CA | operating | 113 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sherman Avenue independent owner | Calpine New Jersey Generation LLC | NJ | operating | 113 | Gas | 1991 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sierra Pinta BESS independent owner | Leeward Asset Management, LLC | AZ | operating | 113 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wolf Ridge Wind independent owner | NextEra Wolf Ridge LLC | TX | operating | 113 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Beaver Dam (AR) utility owner | USCE-Little Rock District | AR | operating | 112 | Hydro | 1965 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Black Walnut Solar, LLC planned, approvals not started | Cypress Creek Renewables | NC | planned | 112 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bluestone Wind, LLC independent owner | Bluestone Wind, LLC | NY | operating | 112 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Contrail Wind Farm utility owner | MidAmerican Energy Co | IA | operating | 112 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Deerfield Wind Energy 2 independent owner | Deerfield Wind Energy 2, LLC | MI | operating | 112 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gray County Wind Energy independent owner | Gray County Wind Energy LLC | KS | operating | 112 | Wind | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Greenidge Generation LLC independent owner | Greenidge Generation Holdings LLC | NY | operating | 112 | Gas | 1953 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | H M Jackson utility owner | PUD No 1 of Snohomish County - (WA) | WA | operating | 112 | Hydro | 1984 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Myrtle Beach utility owner | South Carolina Public Service Authority | SC | operating | 112 | Oil | 1962 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Panther Branch Solar, LLC planned, approvals not started | Cypress Creek Renewables | NC | planned | 112 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Powerlane Plant utility owner | City of Greenville - (TX) | TX | operating | 112 | Oil | 1966 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Timber Mill Solar planned, approvals not started | Cypress Creek Renewables | NC | planned | 112 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Waukegan independent owner | Midwest Generations EME LLC | IL | operating | 112 | Oil | 1968 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Aberdeen CT utility owner | NorthWestern Energy - (SD) | SD | operating | 111 | Gas | 1978 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cutlass Solar 1 LLC independent owner | Cutlass Solar 1, LLC | TX | operating | 111 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Martin County Solar Project, LLC independent owner | Martin County Solar Project, LLC | KY | operating | 111 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Morning Light Wind Farm utility owner | MidAmerican Energy Co | IA | operating | 111 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Thermo Power & Electric independent owner | Thermo Power & Electric LLC | CO | retired | 111 | Gas | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Three W Solar built, not yet in commercial operation | Three W Solar LLC | TX | planned | 111 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Valentine Solar, LLC independent owner | EDF Renewable Asset Holdings, Inc. | CA | operating | 111 | Solar | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Assembly Solar II LLC independent owner | Assembly Solar II LLC | MI | operating | 110 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ben French utility owner | Black Hills Power, Inc. | SD | operating | 110 | Gas | 1965 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Big Creek 2A utility owner | Southern California Edison Co | CA | operating | 110 | Hydro | 1928 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blackwelder Ranch Wind planned, approvals not started | Greenalia Wind Power Blackwelder Ranch, LLC | TX | planned | 110 | Wind | 2030 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Catalina Solar LLC independent owner | EDF Renewable Asset Holdings, Inc. | CA | operating | 110 | Solar | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dolores Canyon Solar utility owner | Tri-State G & T Assn, Inc | CO | operating | 110 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | FirstEnergy R Paul Smith Power Station independent owner | Allegheny Energy Supply Co LLC | MD | retired | 110 | Coal | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | FirstEnergy Rivesville utility owner | Monongahela Power Co | WV | retired | 110 | Coal | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Galloway 2 Solar Farm independent owner | 224WB 8me LLC | TX | operating | 110 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Geothermal 1 utility owner | Northern California Power Agny | CA | operating | 110 | Other | 1983 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Geothermal 2 utility owner | Northern California Power Agny | CA | operating | 110 | Other | 1985 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Glenwood utility owner | National Grid Generation LLC | NY | operating | 110 | Oil | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gratiot County Wind LLC independent owner | Invenergy Services LLC | MI | operating | 110 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hickory Solar independent owner | Hickory Solar LLC | IL | operating | 110 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Keechi Wind independent owner | Keechi Wind, LLC | TX | operating | 110 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Leaning Juniper utility owner | PacifiCorp | OR | operating | 110 | Wind | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Liberty County Solar Project independent owner | Liberty County Solar Project, LLC | TX | operating | 110 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Los Vientos V Wind Power independent owner | Deriva Energy | TX | operating | 110 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Northwest Ohio Wind independent owner | Northwest Ohio Wind, LLC | OH | operating | 110 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ohio Falls utility owner | Louisville Gas & Electric Co | KY | operating | 110 | Hydro | 1928 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Olive utility owner | City of Burbank Water and Power - (CA) | CA | operating | 110 | Gas | 1959 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pelton utility owner | Portland General Electric Co | OR | operating | 110 | Hydro | 1957 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pit 7 utility owner | Pacific Gas & Electric Co. | CA | operating | 110 | Hydro | 1965 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.