Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 38 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Platte utility owner | City of Grand Island - (NE) | NE | operating | 110 | Coal | 1982 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Robert S Kerr utility owner | USCE-Tulsa District | OK | operating | 110 | Hydro | 1971 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Searcy Solar Hybrid utility owner | Searcy Solar, LLC | AR | operating | 110 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Shady Oaks Wind Farm independent owner | Algonquin Power Co | IL | operating | 110 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sienna 2 Solar and Storage Project planned, approvals not started | 44ST 8ME LLC | CA | planned | 110 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Copeland approvals received | SR Copeland, LLC | TN | planned | 110 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sylvamo Corporation Eastover Facility independent owner | Sylvamo Corporation - Eastover | SC | operating | 110 | Other | 1984 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Three Corners Solar independent owner | Three Corners Solar, LLC | ME | operating | 110 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Walleye Wind independent owner | Walleye Wind, LLC | MN | operating | 110 | Wind | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Weleetka utility owner | Public Service Co of Oklahoma | OK | operating | 110 | Gas | 1963 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ames Electric Services Power Plant utility owner | City of Ames - (IA) | IA | operating | 109 | Gas | 1968 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Canaday utility owner | Nebraska Public Power District | NE | operating | 109 | Gas | 1958 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Foxtrot Solar Energy LLC under construction | Evergy Missouri West | MO | planned | 109 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hudson Avenue utility owner | Consolidated Edison Co-NY Inc | NY | retired | 109 | Oil | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Narrows (NC) utility owner | Eagle Creek Renewable Energy, LLC | NC | operating | 109 | Hydro | 1917 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Prairie Mist Solar independent owner | Prairie Mist Solar Project, LLC | AR | operating | 109 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Vault Solar interconnection agreement signed 2026-06; online expected 2027-12; request 25INR0482; financial security poste | — | Palo Pinto Co., TX | planned | 109 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | ACE Cogeneration Facility independent owner | ACE Cogeneration Co | CA | retired | 108 | Coal | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ball Hill Wind Energy, LLC independent owner | Ball Hill Wind Energy, LLC | NY | operating | 108 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | CH Resources Beaver Falls independent owner | Lakeside Beaver Falls LLC | NY | operating | 108 | Gas | 1995 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Culbertson Generation Station utility owner | Basin Electric Power Coop | MT | operating | 108 | Gas | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cunningham Solar I & BESS utility owner | Southwestern Public Service Co | NM | operating | 108 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Drift Sand Wind Project LLC independent owner | Enel Green Power NA, Inc. | OK | operating | 108 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Emerald Grove independent owner | Luminant Generation Company LLC | TX | operating | 108 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Marshall Ford utility owner | Lower Colorado River Authority | TX | operating | 108 | Hydro | 1941 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | North Loop utility owner | Tucson Electric Power Co | AZ | operating | 108 | Gas | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Quinto Solar PV Project independent owner | Arevon Energy, Inc. | CA | operating | 108 | Solar | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Robeson Solar I planned, approvals not started | AES Clean Energy | NC | planned | 108 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SABIC Innovative Plastics Mt. Vernon independent owner | SABIC IP Mt. Vernon, LLC | IN | operating | 108 | Gas | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Shady Oaks Wind 2 independent owner | Shady Oaks Wind 2, LLC | IL | operating | 108 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Spearville 3 LLC independent owner | EDF Renewable Asset Holdings, Inc. | KS | operating | 108 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Union Ridge Solar built, not yet in commercial operation | RWE Clean Energy | OH | planned | 108 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Valencia utility owner | UNS Electric, Inc | AZ | operating | 108 | Gas | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Walters utility owner | Duke Energy Progress - (NC) | NC | operating | 108 | Hydro | 1930 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Willow Spring Solar, LLC independent owner | Willow Spring Solar LLC | CA | operating | 108 | Solar | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Arche Energy Project, LLC independent owner | Lightsource Renewable Energy Asset Management, LLC | OH | operating | 107 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Black Hollow Sun under construction, over half done | Contour Global | CO | planned | 107 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Chateaugay independent owner | Valcour Operating Services, LLC | NY | operating | 107 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Glen Ullin Energy Center independent owner | ALLETE Clean Energy | ND | operating | 107 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Harbor Cogen independent owner | Harbor Cogeneration Co. | CA | operating | 107 | Gas | 1988 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | J Robert Massengale utility owner | City of Lubbock - (TX) | TX | retired | 107 | Gas | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lake Benton I independent owner | ALLETE Clean Energy | MN | operating | 107 | Wind | 1998 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | NaturEner Glacier Wind Energy 1 independent owner | NaturEner Glacier Wind Energy 1 LLC | MT | operating | 107 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sabine Cogen independent owner | Sabine Cogen LP | TX | retired | 107 | Gas | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Somerset Plant independent owner | Sappi Fine Paper North America-Somerset | ME | operating | 107 | Other | 1976 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Norwood approvals received | SR Norwood, LLC | GA | planned | 107 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Snipesville II independent owner | SR Snipesville II, LLC | GA | operating | 107 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Snipesville III independent owner | SR Snipesville III, LLC | GA | operating | 107 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wistaria Ranch Solar independent owner | RWE Clean Energy | CA | operating | 107 | Solar | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blackstone Wind Farm LLC independent owner | Blackstone Wind Farm LLC | IL | operating | 106 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Boone Dam utility owner | Tennessee Valley Authority | TN | operating | 106 | Hydro | 1953 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Buffalo Ridge Wind independent owner | Buffalo Ridge Wind, LLC | MN | operating | 106 | Wind | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hoosier Wind Project LLC utility owner | AES Indiana | IN | operating | 106 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Meadow Lake Wind Farm IV independent owner | Meadow Lake Wind Farm IV LLC | IN | operating | 106 | Wind | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Midland Wind independent owner | Avangrid Power LLC | IL | operating | 106 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Miramar Energy Facility utility owner | San Diego Gas & Electric Co | CA | operating | 106 | Gas | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Number Three Wind Project independent owner | Invenergy Services LLC | NY | operating | 106 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Onondaga Cogeneration independent owner | Onondaga Cogeneration LP | NY | retired | 106 | Gas | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Picway independent owner | AEP Generation Resources Inc | OH | retired | 106 | Coal | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Reis Solar Park approvals received | Greenalia Solar Power Reis, LLC | TX | planned | 106 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Roundhouse Renewable Energy II independent owner | Roundhouse Renewable Energy II, LLC | WY | operating | 106 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Spiritwood Station utility owner | Great River Energy | ND | operating | 106 | Gas | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Clay, LLC independent owner | SR Clay, LLC | GA | operating | 106 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Alamo 6 independent owner | BHE Renewables, LLC | TX | operating | 105 | Solar | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Antelope Expansion 2 independent owner | AES Distributed Energy | CA | operating | 105 | Solar | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bison 2 Wind Energy Center utility owner | ALLETE, Inc. | ND | operating | 105 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bison 3 Wind Energy Center utility owner | ALLETE, Inc. | ND | operating | 105 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Desert Harvest II LLC independent owner | Desert Harvest II LLC | CA | operating | 105 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Duran Mesa LLC independent owner | Pattern Operators LP | NM | operating | 105 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Echo River Solar utility owner | Florida Power & Light Co | FL | operating | 105 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Meldahl Hydroelectric Project utility owner | City of Hamilton - (OH) | KY | operating | 105 | Hydro | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Miami Wabash utility owner | Duke Energy Indiana, LLC | IN | retired | 105 | Oil | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Palouse independent owner | Onward Energy | WA | operating | 105 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pastoria Solar independent owner | Pastoria Solar Energy Company, LLC | CA | operating | 105 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Springbok Solar Farm 1 independent owner | 62SK 8me, LLC | CA | operating | 105 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sunshine Gateway Solar Energy Center utility owner | Florida Power & Light Co | FL | operating | 105 | Solar | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tibbits Energy Storage independent owner | Tibbits Energy Storage LLC | MI | operating | 105 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Upper Baker utility owner | Puget Sound Energy Inc | WA | operating | 105 | Hydro | 1959 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Victory Wind Farm utility owner | MidAmerican Energy Co | IA | operating | 105 | Wind | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Willow Creek Wind Power LLC independent owner | Willow Creek Wind Power LLC | SD | operating | 105 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Happy Dog Storage interconnection agreement signed 2024-12; online expected 2027-08; request 25INR0442 | — | Milam Co., TX | planned | 105 | Battery storage | 2027 | ERCOT planned capacity changes |
| Power plant | Butler Solar Project 103 independent owner | Southern Power Co | GA | operating | 104 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crossing Trails Wind Power Project LLC. independent owner | EDP Renewables North America LLC | CO | operating | 104 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Denison utility owner | USCE-Tulsa District | TX | operating | 104 | Hydro | 1945 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Goodman Energy Center utility owner | Midwest Energy Inc - (KS) | KS | operating | 104 | Gas | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gould Street independent owner | Constellation Power Source Generation, LLC | MD | retired | 104 | Gas | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Heartland Divide Wind Project, LLC independent owner | Heartland Divide Wind Project, LLC | IA | operating | 104 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hoffman Falls Wind 2 planned, approvals not started | Liberty Renewables Incorporated | NY | planned | 104 | Wind | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Honolulu utility owner | Hawaiian Electric Co Inc | HI | retired | 104 | Oil | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | International Paper Riverdale Mill independent owner | International Paper Co-Riverdl | AL | operating | 104 | Gas | 1967 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lower Baker utility owner | Puget Sound Energy Inc | WA | operating | 104 | Hydro | 1960 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Massena Energy Facility independent owner | Power City Partners LP | NY | operating | 104 | Gas | 1992 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | McGinness Hills independent owner | Ormat Nevada Inc | NV | operating | 104 | Other | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Meadow Lake Wind Farm III LLC independent owner | Meadow Lake Wind Farm III LLC | IN | operating | 104 | Wind | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Moccasin utility owner | City & County of San Francisco - (CA) | CA | operating | 104 | Hydro | 1969 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | NaturEner Glacier Wind Energy 2 independent owner | NaturEner Glacier Wind Energy 2 LLC | MT | operating | 104 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nickajack utility owner | Tennessee Valley Authority | TN | operating | 104 | Hydro | 1968 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Old Hickory utility owner | USCE-Nashville District | TN | operating | 104 | Hydro | 1957 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pixelle Specialty Solutions LLC - Spring independent owner | Pixelle Specialty Solutions LLC - (PA) | PA | operating | 104 | Coal | 1948 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Shooting Star independent owner | Shooting Star Power Partners, LLC | KS | operating | 104 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.