Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 36 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Middle Fork utility owner | Placer County Water Agency - (CA) | CA | operating | 122 | Hydro | 1966 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Milagro Cogeneration Plant independent owner | Harvest Midstream Co | NM | retired | 122 | Gas | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Orlando Cogen LP independent owner | Florida Municipal Power Agency (FL) | FL | operating | 122 | Gas | 1993 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rock Island Generation Project approvals pending | Kerrville Public Utility Board Public Facility Corp | TX | planned | 122 | Gas | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Westport independent owner | Constellation Power Source Generation, LLC | MD | retired | 122 | Gas | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Woodruff County Solar utility owner | Arkansas Electric Coop Corp | AR | operating | 122 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Grandslam Solar interconnection agreement signed 2021-01; online expected 2027-10; request 21INR0391 | — | Atascosa Co., TX | planned | 122 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Backbone Creek BESS under construction, over half done | Backbone BESS LLC | TX | planned | 121 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Baconton Power Plant independent owner | Baconton Power LLC | GA | operating | 121 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Black Mountain Generating Station utility owner | UNS Electric, Inc | AZ | operating | 121 | Gas | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Buffalo Gap Wind Farm independent owner | AES Distributed Energy | TX | operating | 121 | Wind | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Calhoun Port Comfort independent owner | Peaker Power, LLC | TX | operating | 121 | Gas | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Caney Creek Solar interconnection agreement signed 2021-12; online expected 2027-06; request 23INR0045; financial security poste | — | Van Zandt Co., TX | planned | 121 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Chamon independent owner | Peaker Power, LLC | TX | operating | 121 | Gas | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cleary Flood Hybrid utility owner | City of Taunton - (MA) | MA | operating | 121 | Gas | 1975 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Essex utility owner | Associated Electric Coop, Inc | MO | operating | 121 | Gas | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ford County Wind Farm LLC independent owner | Ford Ridge | IL | operating | 121 | Wind | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kennedy International Airport Cogen independent owner | KIAC Partners | NY | operating | 121 | Gas | 1994 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Malaga Power LLC independent owner | CalPeak Power, LLC | CA | operating | 121 | Gas | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mead Coated Board independent owner | Mead Coated Board Inc | AL | operating | 121 | Other | 1966 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Niland Gas Turbine Plant utility owner | Imperial Irrigation District | CA | operating | 121 | Gas | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ripon Generation Station utility owner | Modesto Irrigation District | CA | operating | 121 | Gas | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pepper Solar Farm interconnection agreement signed 2025-06; online expected 2027-09; request 26INR0380; financial security poste | — | McLennan Co., TX | planned | 121 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Fairway Storage interconnection agreement signed 2025-08; online expected 2027-09; request 26INR0033; financial security poste | — | Freestone Co., TX | planned | 120 | Battery storage | 2027 | ERCOT planned capacity changes |
| Power plant | Buffalo Gap 1 Wind Repower interconnection agreement signed 2005-02; online expected 2027-02; request 26INR0622; financial security poste | — | Taylor Co., TX | planned | 120 | Wind | 2027 | ERCOT planned capacity changes |
| Power plant | AES Maui Kuihelani Solar Hybrid independent owner | AES Distributed Energy | HI | operating | 120 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ashtabula Wind II LLC independent owner | Ashtabula Wind II LLC | ND | operating | 120 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Barton Chapel Wind Farm independent owner | Avangrid Power LLC | TX | operating | 120 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bluff Point Wind Facility independent owner | Bluff Point Wind, LLC | IN | operating | 120 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Border Basin Solar under construction, over half done | Border Basin, LLC | OH | planned | 120 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Carl Bailey utility owner | Arkansas Electric Coop Corp | AR | retired | 120 | Gas | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Centennial Wind Farm utility owner | Oklahoma Gas & Electric Co | OK | operating | 120 | Wind | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cheyenne Prairie Generating Station planned, approvals not started | Black Hills Service Company LLC | WY | planned | 120 | Gas | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Clermont Solar under construction | Clermont Solar, LLC | PA | planned | 120 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Comanche Solar independent owner | Onward Energy | CO | operating | 120 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dougherty County Solar, LLC independent owner | Dougherty County Solar, LLC | GA | operating | 120 | Solar | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Eagle Creek Solar Park LLC approvals pending | Eagle Creek Solar Park LLC | MI | planned | 120 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Eldorado Solar II independent owner | Sol Systems | IL | operating | 120 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Equus Freeport Power independent owner | Equus Power I, L.P. | NY | operating | 120 | Gas | 2004 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Frontier Solar approvals received | FRON bn, LLC | KY | planned | 120 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | G F Weaton Power Station independent owner | Horsehead Corporation | PA | retired | 120 | Coal | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gravel Pit Solar, LLC independent owner | Gravel Pit Solar, LLC | CT | operating | 120 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gunsight Mountain Wind Energy LLC independent owner | Invenergy Services LLC | TX | operating | 120 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hart Solar Project under construction | Hart Solar Partners, LLC | MI | planned | 120 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Jackpot Solar, LLC utility owner | Deriva Energy | ID | operating | 120 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Keydet Solar Center independent owner | AES Clean Energy | VA | operating | 120 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Long Point Solar independent owner | MN8 Energy LLC | TX | operating | 120 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lookout Point utility owner | USACE Northwestern Division | OR | operating | 120 | Hydro | 1955 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Macksburg Wind Project utility owner | MidAmerican Energy Co | IA | operating | 120 | Wind | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Maplewood Solar utility owner | Dominion Renewable Energy | VA | operating | 120 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Meadow Creek Project Company independent owner | Ridgeline Energy LLC | ID | operating | 120 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mesquite Solar 5, LLC independent owner | RWE Clean Energy | AZ | operating | 120 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | North Fork Solar Project independent owner | North Fork Solar Project, LLC | OK | operating | 120 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Oak Solar independent owner | Oak Solar LLC | NC | operating | 120 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Parker Dam utility owner | U S Bureau of Reclamation | CA | operating | 120 | Hydro | 1942 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pepper Solar Farm planned, approvals not started | Pepper Solar Farm, LLC | TX | planned | 120 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | PPS Power Plant No 1 utility owner | Paducah Power System | KY | operating | 120 | Gas | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Procter & Gamble Mehoopany Mill independent owner | Procter & Gamble Ppr Prdts Co | PA | operating | 120 | Gas | 1984 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rabbitbrush Solar, LLC independent owner | Leeward Asset Management, LLC | CA | operating | 120 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Riverwalk BESS interconnection agreement signed 2026-08; online expected 2027-10; request 24INR0392 | — | Bexar Co., TX | planned | 120 | Battery storage | 2027 | ERCOT planned capacity changes |
| Power plant | Ross County Solar, LLC independent owner | Geronimo Power | OH | operating | 120 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rubart utility owner | Sunflower Electric Power Corp | KS | operating | 120 | Gas | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | San Juan Mesa Wind Project LLC independent owner | NRG Energy Gas & Wind Holdings Inc | NM | operating | 120 | Wind | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Scurry County Wind II independent owner | Invenergy Services LLC | TX | operating | 120 | Wind | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Stanton Wind Energy LLC independent owner | Invenergy Services LLC | TX | operating | 120 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tower Solar, LLC independent owner | Avangrid Power LLC | OR | operating | 120 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tuscola Bay Wind independent owner | Tuscola Bay Wind LLC | MI | operating | 120 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wagyu independent owner | Cubico USA, LLC | TX | operating | 120 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wigeon Whistle Battery Storage Plant independent owner | Wigeon Whistle BESS LLC | TX | operating | 120 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wildcat Ranch Energy Storage planned, approvals not started | Wildcat Ranch Energy Storage, LLC | TX | planned | 120 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Windstar 1 independent owner | Nextera Energy Resources | CA | operating | 120 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bishop Hill III independent owner | Invenergy Services LLC | IL | operating | 119 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Earl F Wisdom utility owner | Corn Belt Power Coop | IA | operating | 119 | Gas | 1960 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | East Pecos Solar independent owner | Southern Power Co | TX | operating | 119 | Solar | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | GMMM Westover independent owner | GMMM Holdings 1, LLC | NY | retired | 119 | Coal | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Langdon Renewables, LLC independent owner | FPL Energy Langdon Wind LLC | ND | operating | 119 | Wind | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Summit Lake utility owner | Central Iowa Power Cooperative | IA | operating | 119 | Gas | 1973 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tracy Solar Energy Center approvals pending | EDF Renewables Development, Inc. | NY | planned | 119 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Western 102 Power Plant independent owner | Nevada Gold Mines | NV | operating | 119 | Gas | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Belden utility owner | Pacific Gas & Electric Co. | CA | operating | 118 | Hydro | 1969 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Caribou 2 utility owner | Pacific Gas & Electric Co. | CA | operating | 118 | Hydro | 1958 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cherokee County Cogen independent owner | Cherokee County Cogen Partners LLC | SC | operating | 118 | Gas | 1998 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Colver Green Energy independent owner | Inter-Power/AhlCon Partners, L.P. | PA | operating | 118 | Coal | 1995 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Energy Center Dover independent owner | Cartier Energy, LLC | DE | operating | 118 | Gas | 1985 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Flint Hills Resources Pine Bend, LLC independent owner | Flint Hills Resources Pine Bend, LLC | MN | operating | 118 | Gas | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Great Bay Solar 1 independent owner | Great Bay Solar I LLC | MD | operating | 118 | Solar | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hilton Head utility owner | South Carolina Public Service Authority | SC | operating | 118 | Oil | 1973 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Klamath Expansion Project independent owner | Klamath Energy LLC | OR | operating | 118 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | McCartney utility owner | City Utilities of Springfield - (MO) | MO | operating | 118 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Orange Grove Peaking Facility independent owner | Orange Grove Energy LP | CA | operating | 118 | Gas | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Plains End II LLC independent owner | Plains End Operating Services LLC | CO | operating | 118 | Gas | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Waverly Solar, LLC independent owner | Waverly Solar, LLC | VA | operating | 118 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Beaumont BESS independent owner | Terra-Gen Operating Co-BESS 2 | CA | operating | 117 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dodson Creek Solar, LLC independent owner | Geronimo Power | OH | operating | 117 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Glass Sands Wind Facility independent owner | Southern Power Co | OK | operating | 117 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ho'Ohana Solar 1 independent owner | Ho'Ohana Solar 1 LLC | HI | operating | 117 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Keswick utility owner | U S Bureau of Reclamation | CA | operating | 117 | Hydro | 1949 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Manitowoc utility owner | Manitowoc Public Utilities | WI | operating | 117 | Oil | 1955 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sycamore Creek Solar, LLC independent owner | Geronimo Power | OH | operating | 117 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Axiall Natrium Plant independent owner | Westlake Chemical Natrium Plant | WV | operating | 116 | Gas | 1943 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.