Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 32 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Mondu Solar LLC independent owner | Mondu Solar LLC | LA | operating | 150 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mowata Solar approvals pending | Lightsource Renewable Energy Asset Management, LLC | LA | planned | 150 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mustang Hills LLC independent owner | Mustang Hills, LLC (Longroad) | CA | operating | 150 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mustang Two independent owner | RE Mustang Two LLC | CA | operating | 150 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Myrtle Storage independent owner | Myrtle Storage, LLC | TX | operating | 150 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Oberon IA independent owner | Oberon Solar IA | TX | operating | 150 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Onion River utility owner | Wisconsin Power & Light Co | WI | operating | 150 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Origin Wind independent owner | Origin Wind Energy LLC | OK | operating | 150 | Wind | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Osage Wind, LLC independent owner | Enel Green Power NA, Inc. | OK | operating | 150 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Osagrove Flats Wind built, not yet in commercial operation | Avangrid Power LLC | IL | planned | 150 | Wind | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Otter Creek Wind Farm LLC independent owner | Avangrid Power LLC | IL | operating | 150 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Padua 2 independent owner | Padua 2 | TX | operating | 150 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Palo Duro Energy Storage planned, approvals not started | Palo Duro Energy Storage, LLC | TX | planned | 150 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Papago PV independent owner | RE Papago PV LLC | AZ | operating | 150 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Parks Valley Energy LLC planned, approvals not started | Parks Valley Energy LLC | WV | planned | 150 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Peacock Energy Project independent owner | Lightsource Renewable Energy Asset Management, LLC | TX | operating | 150 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Piney Woods Solar under construction, over half done | Piney Woods Solar, LLC | TX | planned | 150 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pioneer Trail Wind Farm, LLC independent owner | RWE Clean Energy | IL | operating | 150 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Plant X Solar utility owner | Southwestern Public Service Co | TX | operating | 150 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pleasant Creek Unit 2 utility owner | Interstate Power and Light Co | IA | operating | 150 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pleasantville Solar Park independent owner | Pleasantville Solar Park LLC | IL | operating | 150 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Powell Creek Solar independent owner | Avangrid Power LLC | OH | operating | 150 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Prospect Power BESS independent owner | Elevate Renewables, LLC | VA | operating | 150 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Quitman II Solar independent owner | Quitman II Solar, LLC | GA | operating | 150 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Quitman Solar independent owner | Quitman Solar, LLC | GA | operating | 150 | Solar | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | RATTS 1 independent owner | Ratts 1 Solar LLC | IN | operating | 150 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Revolution independent owner | Crane 2 BESS, LLC | TX | operating | 150 | Battery storage | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rio Bravo utility owner | Public Service Co of NM | NM | operating | 150 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Riverstart Solar Park IV independent owner | Riverstart Solar Park IV LLC | IN | operating | 150 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Riverstone Solar approvals received | Riverstone Solar, LLC | VA | planned | 150 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Roadrunner Crossing Energy Storage independent owner | Roadrunner Crossing Energy Storage LLC | TX | operating | 150 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rock Creek Solar built, not yet in commercial operation | Rock Creek Solar LLC | IA | planned | 150 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Route 66 Wind Plant independent owner | Onward Energy | TX | operating | 150 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Santa Teresa Solar independent owner | Santa Teresa Solar | NM | operating | 150 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Santa Teresa Solar under construction, over half done | Santa Teresa Solar | NM | planned | 150 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sauk Solar Park utility owner | DTE Electric Company | MI | operating | 150 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Schiller independent owner | Granite Shore Power | NH | retired | 150 | Coal | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sebree Solar II independent owner | Sebree Solar, LLC | KY | operating | 150 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Senate Wind LLC independent owner | Algonquin Power Co | TX | operating | 150 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Settlers Trail Wind Farm LLC independent owner | RWE Clean Energy | IL | operating | 150 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Shiloh I Wind Project independent owner | Avangrid Power LLC | CA | operating | 150 | Wind | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Shiloh Wind Project 2 LLC independent owner | EDF Renewable Asset Holdings, Inc. | CA | operating | 150 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sierra Luna Energy Storage planned, approvals not started | Sierra Luna Energy Storage LLC | AZ | planned | 150 | Battery storage | 2030 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Slate Creek Wind Project LLC independent owner | EDF Renewable Asset Holdings, Inc. | KS | operating | 150 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | South Cheyenne Solar independent owner | Southern Power Co | WY | operating | 150 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | South Platte Solar under construction | South Platte Solar | CO | planned | 150 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Spring Grove Solar 2 independent owner | Urban Grid Solar | VA | operating | 150 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Spring Valley Wind Project independent owner | Pattern Operators LP | NV | operating | 150 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Jasper approvals received | SR Jasper, LLC | MS | planned | 150 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Stark Solar, LLC planned, approvals not started | Samsung C&T Renewables, LLC | OH | planned | 150 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sun Streams 2 independent owner | Sun Streams 2, LLC | AZ | operating | 150 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Superior Solar Project, LLC planned, approvals not started | Invenergy Services LLC | MI | planned | 150 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tennyson Solar under construction | BNB Tennyson Solar LLC | TX | planned | 150 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tilden Solar independent owner | Sol Systems | IL | operating | 150 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Trinity River Solar 1 approvals pending | Lightsource Renewable Energy Asset Management, LLC | TX | planned | 150 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Twin Lakes Solar LLC independent owner | Twin Lakes Solar LLC | IN | operating | 150 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Two Creeks Solar utility owner | Wisconsin Public Service Corp | WI | operating | 150 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Umbriel Solar independent owner | Umbriel Solar, LLC | TX | operating | 150 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Upton County Solar independent owner | RWE Clean Energy | TX | operating | 150 | Solar | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Vienna Wind Farm utility owner | MidAmerican Energy Co | IA | operating | 150 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Washington County Solar independent owner | Washington County Solar, LLC | GA | operating | 150 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Weirs Creek under construction | Weirs Creek Solar LLC | KY | planned | 150 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wheatland independent owner | Origis Energy USA, Inc | IN | operating | 150 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | White Oak Energy LLC independent owner | White Oak Energy LLC | IL | operating | 150 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wildcat Ranch Wind Project independent owner | Wildcat Ranch Wind Project, LLC | TX | operating | 150 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Willowbrook Solar I, LLC independent owner | RWE Clean Energy | OH | operating | 150 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Winfield Solar independent owner | Winfield Solar I, LLC | MO | operating | 150 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wizard Energy Storage independent owner | Wizard Energy Storage LLC | TX | operating | 150 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wolf Tank Storage independent owner | Wolf Tank Storage LLC | TX | operating | 150 | Battery storage | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Zeta Solar & Storage under construction | Zeta Solar, LLC | CA | planned | 150 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | A B Paterson utility owner | Entergy New Orleans, LLC | LA | retired | 149 | Gas | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | AES Beaver Valley Partners Beaver Valley independent owner | AES Beaver Valley | PA | retired | 149 | Coal | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Badger State Solar LLC under construction, over half done | Badger State Solar LLC | WI | planned | 149 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Big River Solar independent owner | Big River Solar, LLC | IL | operating | 149 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blackwater River Solar Energy Center utility owner | Florida Power & Light Co | FL | operating | 149 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Canoe utility owner | Florida Power & Light Co | FL | operating | 149 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Deerfield Wind Energy, LLC independent owner | Deerfield Wind Energy, LLC | MI | operating | 149 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dynegy Oakland Power Plant independent owner | Dynegy Oakland, LLC | CA | operating | 149 | Oil | 1978 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Elm Creek Wind II LLC independent owner | Avangrid Power LLC | MN | operating | 149 | Wind | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fort Dodge utility owner | Sunflower Electric Power Corp | KS | operating | 149 | Gas | 1969 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fourmile Creek utility owner | Florida Power & Light Co | FL | operating | 149 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | FPL Chipola River Solar Energy Center utility owner | Florida Power & Light Co | FL | operating | 149 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | FPL Energy Ashtabula Wind LLC independent owner | FPL Energy Ashtabula Wind LLC | ND | operating | 149 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | FPL Shirer Branch Solar Energy Center utility owner | Florida Power & Light Co | FL | operating | 149 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Holland Energy Park utility owner | City of Holland - (MI) | MI | operating | 149 | Gas | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Imperial Solar Energy Center West independent owner | CSOLAR IV West LLC | CA | operating | 149 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kayak utility owner | Florida Power & Light Co | FL | operating | 149 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kelso 2 Solar independent owner | Kelso 2 Solar, LLC | MO | operating | 149 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kings Point Wind Energy Center utility owner | Empire District Electric Co | MO | operating | 149 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | North Fork Ridge Wind Energy Center utility owner | Empire District Electric Co | MO | operating | 149 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | River Fork Solar, LLC independent owner | River Fork Solar, LLC | MI | operating | 149 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rocksprings independent owner | Rocksprings Val Verde Wind, LLC | TX | operating | 149 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rocky Ridge Wind Project independent owner | Rocky Ridge Wind Project LLC | OK | operating | 149 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rugby Wind Power Project independent owner | Avangrid Power LLC | ND | operating | 149 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Smoky Hills Wind Project Phase II independent owner | Smoky Hills Wind Project II LLC | KS | operating | 149 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Spearville utility owner | Evergy Metro | KS | operating | 149 | Wind | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tenmile Creek utility owner | Florida Power & Light Co | FL | operating | 149 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cosper Solar interconnection agreement signed 2025-07; online expected 2027-11; request 25INR0281; financial security poste | — | Bell Co., TX | planned | 148 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Blue Cloud Wind Energy LLC independent owner | TC Energy | TX | operating | 148 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Boiling Springs Wind Farm independent owner | RWE Clean Energy | OK | operating | 148 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.