Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 33 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Cactus Flats Wind Energy Project independent owner | Southern Power Co | TX | operating | 148 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cosper Solar approvals pending | Gransolar Texas Twenty LLC | TX | planned | 148 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Edwards Sanborn 1C independent owner | Terra-Gen Operating Co-Hybrid | CA | operating | 148 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Midpoint Solar, LLC independent owner | Sunraycer Assets I LLC | TX | operating | 148 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Oakfield Wind Project independent owner | Onward Energy | ME | operating | 148 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pontotoc Wind independent owner | Avangrid Power LLC | OK | operating | 148 | Wind | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ranchland Wind Project II independent owner | Ranchland Wind Project II, LLC | TX | operating | 148 | Wind | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Taylor County Solar independent owner | Southern Power Co | GA | operating | 148 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bitter Ridge Wind Farm, LLC independent owner | Bitter Ridge Wind Farm, LLC | IN | operating | 147 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Campo Verde Solar independent owner | Southern Power Co | CA | operating | 147 | Solar | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Grant Plains Wind, LLC independent owner | Southern Power Co | OK | operating | 147 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Indeck Corinth Energy Center independent owner | Indeck-Corinth Ltd Partnership | NY | operating | 147 | Gas | 1995 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | McCartney under construction | City Utilities of Springfield - (MO) | MO | planned | 147 | Gas | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Weatherford Wind Energy Center independent owner | FPL Energy Weatherford, LLC | OK | operating | 147 | Wind | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Yum Yum Solar LLC independent owner | Invenergy Services LLC | TN | operating | 147 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dundee West Wind interconnection agreement signed 2025-02; online expected 2027-12; request 27INR0004; financial security poste | — | Wilbarger Co., TX | planned | 147 | Wind | 2027 | ERCOT planned capacity changes |
| Power plant | Farmers City Wind LLC independent owner | Avangrid Power LLC | MO | operating | 146 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fish Creek Solar Park utility owner | DTE Electric Company | MI | operating | 146 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hunlock Power Station independent owner | Hunlock Energy, LLC | PA | operating | 146 | Gas | 1959 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Seven Mile Hill utility owner | PacifiCorp | WY | operating | 146 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wensowitch Solar Park approvals received | Greenalia Solar Power Wensowitch, LLC | TX | planned | 146 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Axial Basin Solar utility owner | Tri-State G & T Assn, Inc | CO | operating | 145 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blue Sky Green Field Wind Project utility owner | Wisconsin Electric Power Co | WI | operating | 145 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cedar Field Solar Park under construction, over half done | DTE Electric Company | MI | planned | 145 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cherrywood Solar I independent owner | Cherrywood Solar, LLC | MD | operating | 145 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Jefferies utility owner | South Carolina Public Service Authority | SC | operating | 145 | Hydro | 1942 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Palmas Wind, LLC independent owner | Acciona Energy USA Global, LLC | TX | operating | 145 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Panorama Wind, LLC independent owner | Leeward Asset Management, LLC | CO | operating | 145 | Wind | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Swift Air Solar I independent owner | Origis Energy USA, Inc | TX | operating | 145 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Toronto Power Plant approvals pending | Western Minnesota Mun Pwr Agny | SD | planned | 145 | Gas | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Starling Solar interconnection agreement signed 2026-02; online expected 2028-01; request 24INR0440 | — | Gonzales Co., TX | planned | 145 | Solar | 2028 | ERCOT planned capacity changes |
| Power plant | Brizo BESS interconnection agreement signed 2025-03; online expected 2027-09; request 23INR0342 | — | Victoria Co., TX | planned | 144 | Battery storage | 2027 | ERCOT planned capacity changes |
| Power plant | Clearview Solar 1 independent owner | Clearview Solar I, LLC | OH | operating | 144 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crossover Wind independent owner | Crossover Wind, LLC | AR | operating | 144 | Wind | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | East Blackland Solar Project 1 independent owner | Deriva Energy | TX | operating | 144 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gilroy Peaking Energy Center independent owner | Calpine Gilroy Cogen LP | CA | operating | 144 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lockhart Solar PV II independent owner | Terra-Gen Operating Co-Solar | CA | operating | 144 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Notch Cliff independent owner | Constellation Power Source Generation, LLC | MD | retired | 144 | Gas | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Quantum Pasco Power LP independent owner | EthosEnergy Power Plant Services | FL | retired | 144 | Gas | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Quindaro utility owner | City of Kansas City - (KS) | KS | operating | 144 | Oil | 1974 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rattlesnake Flat independent owner | Rattlesnake Flat, LLC | WA | operating | 144 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Shute Creek Facility independent owner | Exxon Mobil Production Co | WY | operating | 144 | Gas | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TransAlta Wyoming Wind independent owner | TransAlta Wyoming Wind LLC | WY | operating | 144 | Wind | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | City Breeze BESS interconnection agreement signed 2024-05; online expected 2027-03; request 25INR0271; financial security poste | — | Matagorda Co., TX | planned | 143 | Battery storage | 2027 | ERCOT planned capacity changes |
| Power plant | Broadview Energy KW, LLC independent owner | Pattern Operators LP | NM | operating | 143 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | C W Burdick utility owner | City of Grand Island - (NE) | NE | operating | 143 | Gas | 1968 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Elizabeth Solar Plant independent owner | Horus Louisiana 1, LLC | LA | operating | 143 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Panther Creek Wind Farm I independent owner | RWE Clean Energy | TX | operating | 143 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Poe utility owner | Pacific Gas & Electric Co. | CA | operating | 143 | Hydro | 1958 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Silas Ray utility owner | Brownsville Public Utilities Board | TX | operating | 143 | Gas | 1959 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Summerhill BESS planned, approvals not started | RIC Development, LLC | TX | planned | 143 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tule Wind LLC independent owner | Avangrid Power LLC | CA | operating | 143 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Broadway (IN) utility owner | Southern Indiana Gas & Elec Co | IN | retired | 142 | Gas | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Colonial Trail West utility owner | Dominion Energy Inc. | VA | operating | 142 | Solar | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Delray utility owner | DTE Electric Company | MI | operating | 142 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Henry D King utility owner | Fort Pierce Utilities Authority | FL | retired | 142 | Gas | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | John R Kelly utility owner | Gainesville Regional Utilities | FL | operating | 142 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | McClure utility owner | Modesto Irrigation District | CA | operating | 142 | Oil | 1980 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pit 5 utility owner | Pacific Gas & Electric Co. | CA | operating | 142 | Hydro | 1944 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Valmont Combustion Turbine Project utility owner | Public Service Co of Colorado | CO | operating | 142 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mehoopany Wind Energy LLC independent owner | Clearlight Energy Holdings LP | PA | operating | 141 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Power Island independent owner | INEOS USA LLC | TX | operating | 141 | Gas | 1985 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Riverside utility owner | MidAmerican Energy Co | IA | retired | 141 | Gas | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sylvarena utility owner | Cooperative Energy | MS | operating | 141 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Vial BESS approvals pending | Gransolar Texas Eleven LLC | TX | planned | 141 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Votaw Solar Station planned, approvals not started | Entergy Louisiana LLC | TX | planned | 141 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wellsburg Wind Project utility owner | MidAmerican Energy Co | IA | operating | 141 | Wind | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | American Beech Solar LLC independent owner | MN8 Energy LLC | NC | operating | 140 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Austin Creek Solar planned, approvals not started | Strata Clean Energy | IL | planned | 140 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bluebird Solar approvals received | Avangrid Power LLC | WA | planned | 140 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Canyonland Solar planned, approvals not started | Canyonland Solar LLC | CO | planned | 140 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cheoah independent owner | Brookfield Smoky Mountain Hydropower LP | NC | operating | 140 | Hydro | 1949 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cheyenne Prairie Generating Station utility owner | Black Hills Service Company LLC | WY | operating | 140 | Gas | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Emmons-Logan Energy Storage under construction, over half done | Emmons-Logan Energy Storage, LLC | ND | planned | 140 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Grover Hill Wind, LLC independent owner | Lotus Infrastructure Global Operations, LLC | OH | operating | 140 | Wind | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | HF Sinclair Puget Sound Refining independent owner | HF Sinclair Corporation | WA | operating | 140 | Gas | 1991 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kerckhoff 2 utility owner | Pacific Gas & Electric Co. | CA | operating | 140 | Hydro | 1983 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mecklenburg Power Station utility owner | Virginia Electric & Power Co | VA | retired | 140 | Coal | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Midway Peaking LLC independent owner | CalPeak Power, LLC | CA | operating | 140 | Gas | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nebo Power Station utility owner | Utah Associated Mun Power Sys | UT | operating | 140 | Gas | 2004 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Oxbow Hill approvals pending | Cypress Creek Renewables | NY | planned | 140 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Panoche Valley Solar Farm independent owner | RWE Clean Energy | CA | operating | 140 | Solar | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pedricktown Cogeneration Company LP independent owner | Pedricktown Cogeneration Company LP | NJ | retired | 140 | Gas | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pioneer Hutt Wind Energy independent owner | Pioneer Hutt Wind Energy, LLC | TX | operating | 140 | Wind | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rockhaven Wind Project, LLC independent owner | Rockhaven Wind Project, LLC | OK | operating | 140 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rosamond South II under construction, over half done | Golden Fields Solar VI, LLC | CA | planned | 140 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Savannah River Mill independent owner | Georgia-Pacific Consr Prods LP-Savannah | GA | operating | 140 | Oil | 1986 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Spanish Peaks Solar independent owner | Spanish Peaks Solar LLC | CO | operating | 140 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Spring Creek Agri-Energy Center under construction | Consumers Energy Co - (MI) | MI | planned | 140 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Timberland Solar independent owner | RWE Clean Energy | GA | operating | 140 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Trinity utility owner | U S Bureau of Reclamation | CA | operating | 140 | Hydro | 1964 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | White Tail Solar independent owner | White Tail Solar, LLC | MI | operating | 140 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wildcat Solar Power Plant LLC planned, approvals not started | Solariant Capital, LLC | NM | planned | 140 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wolf Run Solar independent owner | Wolf Run Solar LLC | IL | operating | 140 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Yuma Solar + Storage independent owner | Invenergy Services LLC | AZ | operating | 140 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blue Bird Solar, LLC independent owner | Blue Bird Solar, LLC | MO | operating | 139 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Interstate utility owner | City of Springfield - (IL) | IL | operating | 139 | Gas | 1997 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Twin Ridges Wind Farm independent owner | Exus Pennsylvania Wind Holdings | PA | operating | 139 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bonham Solar SLF interconnection agreement signed 2024-08; online expected 2027-04; request 25INR0199; financial security poste | — | Limestone Co., TX | planned | 138 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Alta Wind X independent owner | Alta Wind X, LLC | CA | operating | 138 | Wind | 2014 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.