Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 31 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Alta Wind Energy Center I independent owner | Alta Wind I, LLC | CA | operating | 150 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Alta Wind Energy Center II independent owner | Alta Wind II, LLC | CA | operating | 150 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Alta Wind Energy Center III independent owner | Alta Wind III, LLC | CA | operating | 150 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Alta Wind VIII independent owner | Nextera Energy Resources | CA | operating | 150 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Atlas BESS IV LLC under construction, over half done | ATLAS BESS IV, LLC | AZ | planned | 150 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Atlas IX independent owner | Atlas IX LLC | AZ | operating | 150 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Badger Hollow I utility owner | Wisconsin Public Service Corp | WI | operating | 150 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Badger Hollow II utility owner | Wisconsin Electric Power Co | WI | operating | 150 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bee Hollow Solar, LLC under construction, over half done | Geronimo Power | IL | planned | 150 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Big Fork Solar approvals received | Big Fork Solar | SC | planned | 150 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Black Hollow Sun independent owner | Contour Global | CO | operating | 150 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blackford Solar under construction, over half done | Leeward Asset Management, LLC | IN | planned | 150 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blue Summit II Storage independent owner | Blue Summit II Storage, LLC | TX | operating | 150 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bocanova Energy Storage independent owner | Bocanova Power LLC | TX | operating | 150 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bocanova Energy Storage II under construction, over half done | Bocanova Power II LLC | TX | planned | 150 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Boise Bench BESS utility owner | Idaho Power Co | ID | operating | 150 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Boomtown Renewable Energy Center utility owner | Union Electric Co - (MO) | IL | operating | 150 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Boot Hill Solar independent owner | Boot Hill Solar LLC | KS | operating | 150 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Borden County BESS independent owner | Borden County Battery Energy Storage System LLC | TX | operating | 150 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Border Winds Wind Farm utility owner | Northern States Power Co - Minnesota | ND | operating | 150 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Boxcar Energy Storage under construction, over half done | Boxcar Energy Storage, LLC | TX | planned | 150 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Brady II Wind Energy Center independent owner | Brady Wind II, LLC | ND | operating | 150 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Brady Wind Energy Center independent owner | Brady Wind, LLC | ND | operating | 150 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Briscoe Wind Farm independent owner | Briscoe Wind Farm, LLC | TX | operating | 150 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | CA Flats Solar 150, LLC independent owner | Arevon Energy, Inc. | CA | operating | 150 | Solar | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Camp Grove Wind Farm independent owner | Orion Energy Group LLC | IL | operating | 150 | Wind | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cardinal Point Wind independent owner | Cardinal Point LLC | IL | operating | 150 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Carina independent owner | Engie North America | TX | operating | 150 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Carousel Energy Storage, LLC approvals received | Carousel Energy Storage, LLC | CO | planned | 150 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Carousel Wind Farm LLC independent owner | Carousel Wind Farm, LLC | CO | operating | 150 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Casey Fork Solar, LLC built, not yet in commercial operation | RWE Clean Energy | IL | planned | 150 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cass County Renewable Energy Center utility owner | Union Electric Co - (MO) | IL | operating | 150 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cedar Range Solar approvals pending | Cedar Range LLC | TX | planned | 150 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Chillingham Storage independent owner | Chillingham Storage LLC | TX | operating | 150 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Coldwater River Solar independent owner | Coldwater River Solar, LLC | MI | operating | 150 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Compadre Solar independent owner | Compadre Solar, LLC | TX | operating | 150 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cone Renewable Energy Project, LLC approvals pending | Cone Renewable Energy Project, LLC | TX | planned | 150 | Wind | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Conez Solar, LLC planned, approvals not started | Samsung C&T Renewables, LLC | GA | planned | 150 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Corazon Energy Storage approvals received | Corazon Energy Storage, LLC | NM | planned | 150 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cottonwood Bayou Storage independent owner | Cottonwood Bayou Storage, LLC | TX | operating | 150 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | CPV County Line Solar, LLC planned, approvals not started | CPV County Line Solar, LLC | VA | planned | 150 | Solar | 2030 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cranberry Point Energy Storage independent owner | Cranberry Point Energy Storage LLC | MA | operating | 150 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crane Solar Project independent owner | Crane Solar Project, LLC | TX | operating | 150 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crescent Wind Park utility owner | Consumers Energy Co - (MI) | MI | operating | 150 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crossroads Solar - GA approvals pending | Crossroads bn, LLC | GA | planned | 150 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crowned Heron 1 - Storage, LLC independent owner | RWE Clean Energy | TX | operating | 150 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crowned Heron 2 - Storage, LLC built, not yet in commercial operation | RWE Clean Energy | TX | planned | 150 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Danish Fields Storage independent owner | Danish Fields Storage, LLC | TX | operating | 150 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Desert Bloom built, not yet in commercial operation | RE Desert Bloom LLC | AZ | planned | 150 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Desert Willow Energy Storage independent owner | Desert Willow Energy Storage | TX | operating | 150 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Driver Solar utility owner | Entergy Arkansas LLC | AR | operating | 150 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dulles Solar and Storage under construction, over half done | Dominion Energy Inc. | VA | planned | 150 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | El Patrimonio approvals pending | Heritage Solar LLC | TX | planned | 150 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Eldorado Solar I independent owner | Sol Systems | IL | operating | 150 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Elk River Wind independent owner | Avangrid Power LLC | KS | operating | 150 | Wind | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Elora Solar independent owner | Elora Solar | TN | operating | 150 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Faraday Energy Storage under construction | Lydian Energy | UT | planned | 150 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fort Powhatan Solar utility owner | Dominion Renewable Energy | VA | operating | 150 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fowler Ridge IV Wind Farm LLC independent owner | Pattern Operators LP | IN | operating | 150 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Foxtail Wind, LLC utility owner | Foxtail Wind, LLC | ND | operating | 150 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | FPL Energy Crystal Lake Wind LLC independent owner | FPL Energy Crystal Lake Wind LLC | IA | operating | 150 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | FPL Energy Story Wind LLC independent owner | FPL Energy Story Wind LLC | IA | operating | 150 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Garden Wind LLC independent owner | Garden Wind LLC | IA | operating | 150 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gemstone Solar LLC approvals received | Clenera DevCo LLC | MI | planned | 150 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Goat Wind LP independent owner | Goat Wind LLC | TX | operating | 150 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Goldthwaite Wind Energy Facility independent owner | Invenergy Services LLC | TX | operating | 150 | Wind | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Graceland Solar, LLC independent owner | RWE Clean Energy | TN | operating | 150 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gratiot Farms Wind Project utility owner | Consumers Energy Co - (MI) | MI | operating | 150 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Great Cove Solar II independent owner | AES Clean Energy | PA | operating | 150 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Green Pastures Wind I independent owner | Green Pastures Wind I, LLC | TX | operating | 150 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Green Pastures Wind II independent owner | Green Pastures Wind II, LLC | TX | operating | 150 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gunnar Reliability Project under construction | Gunnar Reliability Project LLC | TX | planned | 150 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hardin Solar Energy II LLC independent owner | Invenergy Services LLC | OH | operating | 150 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hardin Solar Energy LLC independent owner | Dominion Renewable Energy | OH | operating | 150 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Harquahala Sun Solar Project independent owner | Copia Power | AZ | operating | 150 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Headcamp BESS independent owner | Lydian Energy | TX | operating | 150 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Heartwood Solar independent owner | Heartwood Solar, LLC | MI | operating | 150 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hecate Energy Pulaski 1 approvals pending | AES Clean Energy | VA | planned | 150 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hinds Solar, LLC under construction | Hinds Solar, LLC | MS | planned | 150 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Honeysuckle Solar Farm independent owner | Lightsource Renewable Energy Asset Management, LLC | IN | operating | 150 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hudson - High Desert Hybrid independent owner | MN8 Energy LLC | CA | operating | 150 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Indigo Energy Facility independent owner | Diamond Generating Corporation | CA | operating | 150 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Indigo Solar interconnection agreement signed 2020-09; online expected 2027-09; request 21INR0031; financial security poste | — | Fisher Co., TX | planned | 150 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Justice Energy Storage independent owner | Strata Clean Energy | AZ | operating | 150 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kuna BESS independent owner | Kuna BESS, LLC | ID | operating | 150 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | La Casa Wind independent owner | La Casa Wind, LLC | TX | operating | 150 | Wind | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lake Whitney Solar planned, approvals not started | Lake Whitney Solar, LLC | TX | planned | 150 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Langford Wind Power independent owner | Langford Wind Power LLC | TX | operating | 150 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Laurens Solar approvals pending | Laurens Solar I, LLC | GA | planned | 150 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lindahl Wind Project, LLC independent owner | Lindahl Wind Project LLC | ND | operating | 150 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Little Trout Solar under construction, over half done | DTE Electric Company | MI | planned | 150 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Loraine Windpark Project LLC independent owner | Loraine Windpower Project | TX | operating | 150 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lund Hill Solar independent owner | Avangrid Power LLC | WA | operating | 150 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mammoth Plains Energy Storage planned, approvals not started | Mammoth Plains Energy Storage, LLC | OK | planned | 150 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Marysville utility owner | DTE Electric Company | MI | retired | 150 | Coal | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Maverick Solar 6, LLC independent owner | Maverick Solar 6, LLC | CA | operating | 150 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | McAdoo Wind Energy LLC independent owner | Invenergy Services LLC | TX | operating | 150 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Merricourt Wind Energy Center utility owner | Otter Tail Power Co | ND | operating | 150 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mesquite Solar 3, LLC independent owner | RWE Clean Energy | AZ | operating | 150 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | MinnDakota Wind LLC independent owner | Avangrid Power LLC | MN | operating | 150 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.