Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 23 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Barton Branch IA interconnection agreement signed 2025-06; online expected 2026-10; request 22INR0504; financial security poste | — | Robertson Co., TX | planned | 204 | Battery storage | 2026 | ERCOT planned capacity changes |
| Power plant | Tidwell Prairie II Batt interconnection agreement signed 2025-01; online expected 2026-12; request 22INR0503; financial security poste | — | Robertson Co., TX | planned | 204 | Battery storage | 2026 | ERCOT planned capacity changes |
| Power plant | Callisto II Energy Center interconnection agreement signed 2023-12; online expected 2026-12; request 22INR0558; financial security poste | — | Harris Co., TX | planned | 203 | Battery storage | 2026 | ERCOT planned capacity changes |
| Power plant | OCI Cobb Creek Solar interconnection agreement signed 2024-07; online expected 2027-12; request 25INR0229; financial security poste | — | Hill Co., TX | planned | 203 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | AES Hawaii independent owner | AES Hawaii LLC | HI | retired | 203 | Coal | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Champaign BESS, LLC planned, approvals not started | Samsung C&T Renewables, LLC | TX | planned | 203 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crossett Power Management LLC independent owner | Crossett Power Management LLC | TX | operating | 203 | Battery storage | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cutlass Solar II independent owner | Cutlass II Solar LLC | TX | operating | 203 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dansby utility owner | City of Bryan - (TX) | TX | operating | 203 | Gas | 1978 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dave Gates Generating Station utility owner | NorthWestern Energy (MT wind/thermal) | MT | operating | 203 | Gas | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Great Valley Solar Portfolio Holdings, L independent owner | RWE Clean Energy | CA | operating | 203 | Solar | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lane City Wind independent owner | RWE Clean Energy | TX | operating | 203 | Wind | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Magic Valley Wind Farm I LLC independent owner | RWE Clean Energy | TX | operating | 203 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Montgomery Ranch Wind Farm, LLC independent owner | RWE Clean Energy | TX | operating | 203 | Wind | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nazareth Solar interconnection agreement signed 2026-03; online expected 2027-08; request 16INR0049; financial security poste | — | Castro Co., TX | planned | 203 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Pike Creek Wind planned, approvals not started | Repsol Renewables NA | IL | planned | 203 | Wind | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Plymouth Wind utility owner | MidAmerican Energy Co | IA | operating | 203 | Wind | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Upstream Wind Energy LLC independent owner | Invenergy Services LLC | NE | operating | 203 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crowded Star I BESS interconnection agreement signed 2025-12; online expected 2027-07; request 25INR0473; financial security poste | — | Jones Co., TX | planned | 203 | Battery storage | 2027 | ERCOT planned capacity changes |
| Power plant | Trenno BESS interconnection agreement signed 2025-08; online expected 2027-09; request 27INR0173 | — | Johnson Co., TX | planned | 203 | Battery storage | 2027 | ERCOT planned capacity changes |
| Power plant | Willow Beach Wind interconnection agreement signed 2025-06; online expected 2027-10; request 25INR0494 | — | Brazoria Co., TX | planned | 202 | Wind | 2027 | ERCOT planned capacity changes |
| Power plant | Chickasaw Wind Farm utility owner | MidAmerican Energy Co | IA | operating | 202 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dios BESS, LLC planned, approvals not started | Samsung C&T Renewables, LLC | TX | planned | 202 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Erin planned, approvals not started | Erin Solar LLC | TX | planned | 202 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Harvest Ridge Wind Farm independent owner | Harvest Ridge Wind Farm | IL | operating | 202 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Horizon Hill Wind Project independent owner | Horizon Hill Wind, LLC | OK | operating | 202 | Wind | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Indiana Crossroads Wind Farm II independent owner | Indiana Crossroads Wind Farm II LLC | IN | operating | 202 | Wind | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Las Lomas Wind Project independent owner | Engie North America | TX | operating | 202 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lily Solar Hybrid independent owner | Lily Solar, LLC | TX | operating | 202 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Los Vientos Wind 1B independent owner | Deriva Energy | TX | operating | 202 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mesteno independent owner | Deriva Energy | TX | operating | 202 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ninnescah Flats Solar built, not yet in commercial operation | Nextera Energy Resources | KS | planned | 202 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pearsall utility owner | South Texas Electric Coop, Inc | TX | operating | 202 | Gas | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Penascal II Wind Project LLC independent owner | Avangrid Power LLC | TX | operating | 202 | Wind | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Penascal Wind Power LLC independent owner | Avangrid Power LLC | TX | operating | 202 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Plum Nellie Wind Farm LLC planned, approvals not started | Plum Nellie Wind Farm LLC | KS | planned | 202 | Wind | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Red Butte Wind planned, approvals not started | Red Butte Wind | ND | planned | 202 | Wind | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sugar Creek Wind One LLC independent owner | Sugar Creek Wind One LLC | IL | operating | 202 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | White Rock East Wind Project independent owner | White Rock Wind East, LLC | OK | operating | 202 | Wind | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Staccato BESS interconnection agreement signed 2024-08; online expected 2027-05; request 25INR0189; financial security poste | — | Fayette Co., TX | planned | 202 | Battery storage | 2027 | ERCOT planned capacity changes |
| Power plant | Echols Grove Solar interconnection agreement signed 2024-07; online expected 2027-06; request 25INR0368; financial security poste | — | Lamar Co., TX | planned | 202 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Apache Hill BESS interconnection agreement signed 2024-06; online expected 2026-10; request 25INR0231; financial security poste | — | Hood Co., TX | planned | 201 | Battery storage | 2026 | ERCOT planned capacity changes |
| Power plant | Dios BESS interconnection agreement signed 2025-04; online expected 2027-12; request 25INR0441; financial security poste | — | Jackson Co., TX | planned | 201 | Battery storage | 2027 | ERCOT planned capacity changes |
| Power plant | Alta Farms II Wind Project, LLC independent owner | Alta Farms II Wind Project, LLC | IL | operating | 201 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Axton Solar approvals pending | Vesper Energy Development LLC | VA | planned | 201 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bell Creek BESS LLC planned, approvals not started | Nexus Renewables U.S. Inc. | TX | planned | 201 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bent Tree Wind Farm Phase 1 utility owner | Wisconsin Power & Light Co | MN | operating | 201 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blackcat BESS planned, approvals not started | RIC Development, LLC | TX | planned | 201 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Buckeye Wind Energy Center independent owner | Invenergy Services LLC | KS | operating | 201 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Century utility owner | MidAmerican Energy Co | IA | operating | 201 | Wind | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cloud County Wind Farm independent owner | Cloud County Windfarm, LLC | KS | operating | 201 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crowned Ridge Wind II Energy Center utility owner | Northern States Power Co - Minnesota | SD | operating | 201 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Diversion Wind Energy LLC utility owner | Southwestern Electric Power Co | TX | operating | 201 | Wind | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Echols Grove Solar approvals pending | Echols Grove LLC | TX | planned | 201 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Golden Hill Wind independent owner | Avangrid Power LLC | OR | operating | 201 | Wind | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ida Grove II utility owner | MidAmerican Energy Co | IA | operating | 201 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kahla Storage approvals pending | Belltown Power Texas 2, LLC | TX | planned | 201 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Limon III Wind LLC independent owner | Limon | CO | operating | 201 | Wind | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Logan Wind Energy independent owner | Logan Wind Energy LLC | CO | operating | 201 | Wind | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nobles Wind Project utility owner | Northern States Power Co - Minnesota | MN | operating | 201 | Wind | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Osborn Wind Energy independent owner | Osborn Wind Energy LLC | MO | operating | 201 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Post Rock Wind Power Project, LLC independent owner | Pattern Operators LP | KS | operating | 201 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Resaca Oasis Storage approvals received | Red River Clean Energy | TX | planned | 201 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Staccato BESS under construction | Sunraycer Assets I LLC | TX | planned | 201 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Stella Wind Farm independent owner | RWE Clean Energy | TX | operating | 201 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sunflower Energy Center, LLC independent owner | Sunflower Energy Center, LLC | KS | operating | 201 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TX Nazareth Solar approvals received | Vesper Energy Development LLC | TX | planned | 201 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Whispering Willow North utility owner | Interstate Power and Light Co | IA | operating | 201 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bell Creek BESS interconnection agreement signed 2024-11; online expected 2027-10; request 25INR0480 | — | Brazoria Co., TX | planned | 201 | Battery storage | 2027 | ERCOT planned capacity changes |
| Power plant | Cradle Solar interconnection agreement signed 2023-03; online expected 2027-09; request 23INR0150; financial security poste | — | Brazoria Co., TX | planned | 201 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Waterloo Solar 1 interconnection agreement signed 2024-09; online expected 2027-12; request 25INR0422 | — | Bastrop Co., TX | planned | 201 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Abeja Solar Farm planned, approvals not started | Abeja Solar Farm LLC | TX | planned | 200 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Alamo City ESS planned, approvals not started | Alamo City ESS LLC | TX | planned | 200 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Anemoi Energy Storage independent owner | Anemoi Energy Storage, LLC | TX | operating | 200 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | ANSON Solar Center, LLC independent owner | Engie North America | TX | operating | 200 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Apache Hill Energy Center under construction, over half done | Apache Hill Energy Center | TX | planned | 200 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Appaloosa Solar I independent owner | Greenbacker Renewable Energy Corporation | UT | operating | 200 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Appleseed Solar independent owner | Appleseed Solar, LLC | IN | operating | 200 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Aramis I Solar Project under construction | IP Aramis, LLC | CA | planned | 200 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | ATLAS Solar V, LLC independent owner | ATLAS Solar V, LLC | AZ | operating | 200 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | ATLAS Solar XI, LLC planned, approvals not started | ATLAS Solar Manager, LLC | AZ | planned | 200 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Avant Prairie ESS planned, approvals not started | Avant Prairie ESS LLC | TX | planned | 200 | Battery storage | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Barton Branch IA under construction | Barton Branch IA LLC | TX | planned | 200 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bee Branch IA under construction | Bee Branch IA, LLC | TX | planned | 200 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bhalu approvals pending | Cypress Creek Renewables | TX | planned | 200 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Big Elm Solar independent owner | Big Elm Solar, LLC | TX | operating | 200 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Big Rock Solar Farm independent owner | Big Rock ESS Assets, LLC | CA | operating | 200 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Big Star Solar, LLC (Hybrid) independent owner | RWE Clean Energy | TX | operating | 200 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bishop Hill Energy LLC independent owner | SunEdison LLC | IL | operating | 200 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blackford Wind under construction, over half done | Leeward Asset Management, LLC | IN | planned | 200 | Wind | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blackstone Wind Farm II LLC independent owner | Blackstone Wind Farm II LLC | IL | operating | 200 | Wind | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blackwater Solar Center - NM approvals received | Blackwater Solar Center, LLC | NM | planned | 200 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blazing Star 2 Wind Farm utility owner | Northern States Power Co - Minnesota | MN | operating | 200 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blazing Star Wind Farm 1 utility owner | Northern States Power Co - Minnesota | MN | operating | 200 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blue Summit III Wind independent owner | Blue Summit III Wind, LLC | TX | operating | 200 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bogalusa West Solar Station planned, approvals not started | Entergy Louisiana LLC | LA | planned | 200 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bowman Wind independent owner | Bowman Wind, LLC | ND | operating | 200 | Wind | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Branch Solar Project independent owner | Branch Solar, LLC | MI | operating | 200 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bravo ESS planned, approvals not started | Bravo ESS LLC | TX | planned | 200 | Battery storage | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Brazoria County Solar Project (Danciger) independent owner | Brazoria County Solar Project, LLC | TX | operating | 200 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.