Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 24 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Brazoria West independent owner | Brazoria West Solar Project, LLC | TX | operating | 200 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Brittlebush Solar independent owner | Randolph Solar Park LLC | AZ | operating | 200 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Broadleaf Solar approvals pending | Broadleaf Solar, LLC | CT | planned | 200 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bronco Plains Wind II, LLC independent owner | Bronco Plains Wind II, LLC | CO | operating | 200 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Buena Vista Energy Center III under construction | Buena Vista Energy Center III, LLC | NM | planned | 200 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bypass BESS independent owner | Bypass BESS LLC | TX | operating | 200 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cachi independent owner | Engie North America | TX | operating | 200 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Calhoun Solar independent owner | Invenergy Services LLC | MI | operating | 200 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Caney River Wind Project independent owner | Caney River Wind Project | KS | operating | 200 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Canyon Power Plant utility owner | City of Anaheim - (CA) | CA | operating | 200 | Gas | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Carpenter Wind Farm LLC independent owner | Carpenter Wind Farm LLC | IN | operating | 200 | Wind | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Castor under construction | Engie North America | TX | planned | 200 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cathode (Hinson) BESS utility owner | Southern California Edison Co | CA | operating | 200 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cattlemen Solar II built, not yet in commercial operation | Cattlemen Solar Park II LLC | TX | planned | 200 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cedar Springs I independent owner | Cedar Springs Wind, LLC | WY | operating | 200 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cedar Springs II utility owner | PacifiCorp | WY | operating | 200 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Centralia Battery Energy Storage System approvals pending | CENT bn, LLC | WA | planned | 200 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cimarron Bend Wind Project I, LLC independent owner | Cimarron Bend Wind Project I, LLC | KS | operating | 200 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cimarron Bend Wind Project II, LLC independent owner | Cimarron Bend Wind Project II, LLC | KS | operating | 200 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Colbeck's Corner, LLC independent owner | RWE Clean Energy | TX | operating | 200 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Condor Energy Storage LLC independent owner | Condor Energy Storage LLC | CA | operating | 200 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Corazon Energy LLC independent owner | Corazon Energy LLC | TX | operating | 200 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Courtenay Wind Farm utility owner | Northern States Power Co - Minnesota | ND | operating | 200 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crawfish Creek Energy Storage approvals received | Crawfish Creek Energy Storage LLC | AL | planned | 200 | Battery storage | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crimson Orchard Solar and BESS approvals pending | Clenera DevCo LLC | ID | planned | 200 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crocker Wind Farm independent owner | Geronimo Power | SD | operating | 200 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crossroads Solar (IN) independent owner | Crossroads Solar, LLC - (IN) | IN | operating | 200 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crowned Ridge Wind Energy Center independent owner | Crowned Ridge Wind, LLC | SD | operating | 200 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cumbia Energy Center planned, approvals not started | Mission Clean Energy Devco LLC | TX | planned | 200 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Decatur Solar independent owner | Washington County Solar, LLC | GA | operating | 200 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Deckerville Solar Park under construction | DTE Electric Company | MI | planned | 200 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Desna independent owner | Engie North America | TX | operating | 200 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Destiny Storage independent owner | Cypress Creek Renewables | TX | operating | 200 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Diablo Energy Storage independent owner | Diablo Energy Storage, LLC | CA | operating | 200 | Battery storage | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Diamondback Solar approvals received | Diamondback Solar, LLC | TX | planned | 200 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dickens independent owner | Engie North America | TX | operating | 200 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dighton Power Plant independent owner | Dighton Power, LLC | MA | operating | 200 | Gas | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dominguez Energy Storage independent owner | Dominguez Grid, LLC | UT | operating | 200 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dry Lake East Energy Center under construction, over half done | Dry Lake East Energy Center | NV | planned | 200 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dyers Spring Solar approvals pending | DYSP, LLC | KY | planned | 200 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | El Algodon Alto Wind Farm, LLC independent owner | RWE Clean Energy | TX | operating | 200 | Wind | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Elk Run approvals pending | Cypress Creek Renewables | CO | planned | 200 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Elk Station under construction | Golden Spread Electric Cooperative, Inc | TX | planned | 200 | Gas | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Elliot Solar LLC under construction | Elliot Solar LLC | IN | planned | 200 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Emmons-Logan Wind, LLC independent owner | Emmons-Logan Wind, LLC | ND | operating | 200 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Escalante (NM) independent owner | Origis Energy USA, Inc | NM | operating | 200 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ferdinand Energy Center independent owner | Ferdinand Grid, LLC | TX | operating | 200 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Flag Run Solar approvals pending | MAHI bn, LLC | IN | planned | 200 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Flat Fork Solar independent owner | Flat Fork Solar, LLC | AR | operating | 200 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Flat Top Wind I independent owner | BHE Renewables, LLC | TX | operating | 200 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Flatland Storage independent owner | Flatland Storage LLC | AZ | operating | 200 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Flint under construction | Flint | OH | planned | 200 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Forgeview Solar independent owner | Forgeview Solar, LLC | AR | operating | 200 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Four Mile Mesa Solar, LLC under construction | Four Mile Mesa Solar, LLC | NM | planned | 200 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | FPL Energy Crystal Lake Wind II LLC independent owner | FPL Energy Crystal Lake Wind II LLC | IA | operating | 200 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Freshwater Solar, LLC under construction | Freshwater Solar LLC | MI | planned | 200 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Frontier Windpower independent owner | Deriva Energy | OK | operating | 200 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gage Solar approvals pending | GGSO, LLC | KY | planned | 200 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gibson Solar utility owner | Gibson Solar, LLC | IN | operating | 200 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Golden Plains utility owner | Interstate Power and Light Co | IA | operating | 200 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Golden Triangle II independent owner | Origis Energy USA, Inc | MS | operating | 200 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Goodwell Wind Project LLC independent owner | Goodwell Wind Project LLC | OK | operating | 200 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Grand Valley Solar Generation and BESS approvals pending | GRVA bn, LLC | CO | planned | 200 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Green River Solar independent owner | Green River Solar, LLC | KY | operating | 200 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Greenalia Solar Power Blackwelder Ranch planned, approvals not started | Greenalia Solar Power Blackwelder Ranch, LLC | TX | planned | 200 | Solar | 2030 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Greenwater BESS under construction, over half done | GREE bn, LLC | WA | planned | 200 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Greer Solar Plant under construction | Greer Solar, LLC | MS | planned | 200 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hawkeye Solar, LLC approvals pending | Hawkeye Solar, LLC | IA | planned | 200 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Headwaters Wind Farm II LLC independent owner | EDP Renewables North America LLC | IN | operating | 200 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Headwaters Wind Farm LLC independent owner | Headwaters Wind Farm LLC | IN | operating | 200 | Wind | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Heartland Divide II independent owner | Heartland Divide II | IA | operating | 200 | Wind | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Heartland Farms utility owner | Consumers Energy Co - (MI) | MI | operating | 200 | Wind | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hill Solar II built, not yet in commercial operation | Hill Solar II, LLC | TX | planned | 200 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hillcrest Solar independent owner | Hillcrest Solar I, LLC | OH | operating | 200 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hillsboro Solar 3 approvals pending | Urban Grid Solar | AL | planned | 200 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Holstein 1 Solar Farm independent owner | Holstein Solar Farm 1, LLC | TX | operating | 200 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Horizon Solar independent owner | Leeward Asset Management, LLC | TX | operating | 200 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hornshadow Solar II, LLC independent owner | Hornshadow Solar II, LLC | UT | operating | 200 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Huck Finn Renewable Energy Center utility owner | Union Electric Co - (MO) | MO | operating | 200 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hydra independent owner | Engie North America | TX | operating | 200 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Imperial Sun Solar approvals pending | Imperial Sun Solar LLC | CA | planned | 200 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Imperial Valley Solar, LLC independent owner | Imperial Valley Solar, LLC | CA | operating | 200 | Solar | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Indiana Crossroads Solar Park utility owner | Meadow Lake Solar Park | IN | operating | 200 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | J S Eastwood utility owner | Southern California Edison Co | CA | operating | 200 | Hydro | 1987 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Javelina Wind Energy II, LLC independent owner | Javelina Wind Energy II, LLC | TX | operating | 200 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Juniper Creek Storage approvals received | Vesper Energy Development LLC | CA | planned | 200 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kaufman Solar built, not yet in commercial operation | Kaufman Solar, LLC | TX | planned | 200 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kelso Solar independent owner | Kelso Solar, LLC | MO | operating | 200 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kitt Solar under construction, over half done | 301AK 8me LLC | AZ | planned | 200 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | La Paz Solar Tower planned, approvals not started | Enviromission, Inc | AZ | planned | 200 | Solar | 2030 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Limon Wind I independent owner | Limon | CO | operating | 200 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Limon Wind II independent owner | Limon | CO | operating | 200 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lion Solar planned, approvals not started | Lion Solar LLC | AR | planned | 200 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Live Oak Wind Project independent owner | Engie North America | TX | operating | 200 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Logans Gap Wind LLC independent owner | Pattern Operators LP | TX | operating | 200 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Long Lake Solar, LLC independent owner | Long Lake Solar, LLC | AR | operating | 200 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Longhorn Wind independent owner | Boralex US Operations LLC | TX | operating | 200 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Los Vientos Wind 1A independent owner | Deriva Energy | TX | operating | 200 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Los Vientos Windpower III independent owner | Deriva Energy | TX | operating | 200 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Los Vientos Windpower IV independent owner | Deriva Energy | TX | operating | 200 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.