Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 21 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Marengo Wind Plant utility owner | PacifiCorp | WA | operating | 234 | Wind | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Midway Sunset Cogen independent owner | Midway-Sunset Cogeneration Co | CA | operating | 234 | Gas | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Buffalo Gap 2 Wind Farm independent owner | AES Distributed Energy | TX | operating | 233 | Wind | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Frank E Ratts utility owner | Hoosier Energy R E C, Inc | IN | retired | 233 | Coal | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Asbury utility owner | Empire District Electric Co | MO | retired | 232 | Coal | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Marcos PV and BESS approvals pending | GRS BESS Texas Eight LLC | TX | planned | 232 | Battery storage | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Buffalo Gap 2 Wind Repower interconnection agreement signed 2005-02; online expected 2027-02; request 26INR0625; financial security poste | — | Nolan Co., TX | planned | 232 | Wind | 2027 | ERCOT planned capacity changes |
| Power plant | Cairos Solar and Storage planned, approvals not started | Samsung C&T Renewables, LLC | TX | planned | 231 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cecil Lynch utility owner | Entergy Arkansas LLC | AR | retired | 231 | Gas | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cross Winds Energy Park utility owner | Consumers Energy Co - (MI) | MI | operating | 231 | Wind | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cumberland (NJ) independent owner | Calpine New Jersey Generation LLC | NJ | operating | 231 | Gas | 1990 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | AC Ranch II approvals pending | Lydian Energy | NM | planned | 230 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Adelite Storage Project LLC approvals received | Acciona Energy USA Global, LLC | TX | planned | 230 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bernard Creek Solar independent owner | Bernard Creek Solar, LLC | TX | operating | 230 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dallman utility owner | City of Springfield - (IL) | IL | operating | 230 | Coal | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Electra Wind Farm independent owner | Electra Wind, LLC | TX | operating | 230 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fort Churchill utility owner | Sierra Pacific Power Co | NV | operating | 230 | Gas | 1968 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gaia Hybrid independent owner | Sunraycer Assets I LLC | TX | operating | 230 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Horse Creek Wind Farm independent owner | Horse Creek Wind, LLC | TX | operating | 230 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Leon Creek utility owner | City of San Antonio - (TX) | TX | operating | 230 | Gas | 2004 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Maalaea utility owner | Maui Electric Co Ltd | HI | operating | 230 | Oil | 1971 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mariah del Norte independent owner | BHE Renewables, LLC | TX | operating | 230 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pine Bluff Energy Center independent owner | Pine Bluff Energy LLC | AR | operating | 230 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Plum Creek Wind Project (NE) independent owner | Plum Creek Wind, LLC | NE | operating | 230 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Stagecoach LRE approvals received | Leeward Asset Management, LLC | CO | planned | 230 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sunlight Storage independent owner | Sunlight Storage, LLC | CA | operating | 230 | Battery storage | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sunlight Storage II independent owner | Sunlight Storage II | CA | operating | 230 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | AES Warrior Run Cogeneration Facility independent owner | AES WR Ltd Partnership | MD | retired | 229 | Coal | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Guajillo Energy Storage independent owner | Guajillo Energy Storage, LLC | TX | operating | 229 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sheldon utility owner | Nebraska Public Power District | NE | operating | 229 | Coal | 1961 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bruennings Breeze Wind Farm independent owner | RWE Clean Energy | TX | operating | 228 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crossroads Wind Farm utility owner | Oklahoma Gas & Electric Co | OK | operating | 228 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dodge County Wind approvals received | Dodge County Wind, LLC | MN | planned | 228 | Wind | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fighting Jays Solar Project independent owner | AP Solar 2, LLC | TX | operating | 228 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fountain Valley Power Facility independent owner | Fountain Valley Power LLC | CO | operating | 228 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Glenwood utility owner | National Grid Generation LLC | NY | retired | 228 | Gas | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lieberman utility owner | Southwestern Electric Power Co | LA | operating | 228 | Gas | 1957 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Selis Ksanka Qlispe utility owner | Energy Keepers Inc | MT | operating | 228 | Hydro | 1938 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Deepwater independent owner | Calpine New Jersey Generation LLC | NJ | retired | 227 | Gas | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Muscle Shoals independent owner | Muscle Shoals Solar, LLC | AL | operating | 227 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nelson Dewey Generating Station utility owner | Wisconsin Power & Light Co | WI | retired | 227 | Coal | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sandford Solar and Storage approvals pending | Belltown Power Texas 2, LLC | TX | planned | 227 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ventures BESS approvals pending | Gransolar Texas Twelve LLC | TX | planned | 227 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Denton Energy Center utility owner | City of Denton - (TX) | TX | operating | 226 | Gas | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Griffin Trail Wind independent owner | Griffin Trail Wind, LLC | TX | operating | 226 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mammoth Plains independent owner | Mammoth Plains Wind Project | OK | operating | 226 | Wind | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | New Salem Wind II planned, approvals not started | New Salem Wind II | ND | planned | 226 | Wind | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Patriot Wind Farm independent owner | Avangrid Power LLC | TX | operating | 226 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Port Westward Unit 2 utility owner | Portland General Electric Co | OR | operating | 226 | Gas | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Roundhouse Wind Energy Project independent owner | Roundhouse Renewable Energy, LLC | WY | operating | 226 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Throckmorton Wind under construction, over half done | Throckmorton Wind, LLC | TX | planned | 226 | Wind | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Anode (Springville) BESS built, not yet in commercial operation | Southern California Edison Co | CA | planned | 225 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | ATLAS Solar X, LLC planned, approvals not started | ATLAS Solar Manager, LLC | AZ | planned | 225 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Baldy Mesa Solar & Storage independent owner | AES Clean Energy | CA | operating | 225 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bramble Energy Center planned, approvals not started | Mission Clean Energy Devco LLC | TX | planned | 225 | Battery storage | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Delta (MS) utility owner | Entergy Mississippi LLC | MS | retired | 225 | Gas | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Diver Solar, LLC independent owner | Diver Solar, LLC | TX | operating | 225 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Emerald Bluffs Solar Park approvals pending | Emerald Bluffs Solar Park LLC | WI | planned | 225 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | ENGIE Long Draw Solar LLC independent owner | Engie North America | TX | operating | 225 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Great Western Wind Energy, LLC independent owner | EDF Renewable Asset Holdings, Inc. | OK | operating | 225 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Meridian Wind Park utility owner | DTE Electric Company | MI | operating | 225 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Milagro Solar I independent owner | Milagro Solar I, LLC | NM | operating | 225 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Romero Energy Center under construction | Romero Energy Center, LLC | AZ | planned | 225 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Romero Energy Center II, LLC under construction | Romero Energy Center II, LLC | AZ | planned | 225 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Roseville Energy Park utility owner | City of Roseville - (CA) | CA | operating | 225 | Gas | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Titus independent owner | Titus Power, LLC | PA | retired | 225 | Coal | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Walter Bouldin Dam utility owner | Alabama Power Co | AL | operating | 225 | Hydro | 1967 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wood County utility owner | Wisconsin Power & Light Co | WI | operating | 225 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Almond Power Plant utility owner | Turlock Irrigation District | CA | operating | 224 | Gas | 1996 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Great Pathfinder Wind independent owner | Great Pathfinder Wind | IA | operating | 224 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Jonesboro City Water & Light Plant utility owner | City Water and Light Plant - (AR) | AR | operating | 224 | Gas | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mayapple Solar 1 approvals received | Lightsource Renewable Energy Asset Management, LLC | IN | planned | 224 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Red Gate Power Plant utility owner | South Texas Electric Coop, Inc | TX | operating | 224 | Gas | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Alira approvals pending | Luminant Generation Company LLC | TX | planned | 223 | Solar | 2030 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Callisto I Energy Center independent owner | Callisto I Energy Center | TX | operating | 223 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Devon Station independent owner | Devon Power LLC | CT | operating | 223 | Oil | 1985 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rawhide planned, approvals not started | Platte River Power Authority | CO | planned | 223 | Gas | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sherco Solar I utility owner | Northern States Power Co - Minnesota | MN | operating | 223 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rubicon Alpha Wind interconnection agreement signed 2024-05; online expected 2027-07; request 24INR0291; financial security poste | — | Haskell Co., TX | planned | 223 | Wind | 2027 | ERCOT planned capacity changes |
| Power plant | Sun Peak Generating Station utility owner | Nevada Power Co | NV | operating | 222 | Gas | 1991 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Thetford utility owner | Consumers Energy Co - (MI) | MI | retired | 222 | Gas | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ganado Solar independent owner | Enel Green Power NA, Inc. | TX | operating | 221 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Grady Wind Energy Center, LLC independent owner | Pattern Operators LP | NM | operating | 221 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lockport Energy Associates LP independent owner | Lockport Energy Associates LP | NY | operating | 221 | Gas | 1992 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | MRG Goody Solar Project Hybrid under construction, over half done | Nexus Renewable Power, LLC | TX | planned | 221 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Amador BESS under construction, over half done | BT Amador Storage LLC | TX | planned | 220 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Coke BESS planned, approvals not started | RIC Development, LLC | TX | planned | 220 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cranell Wind Farm LLC independent owner | RWE Clean Energy | TX | operating | 220 | Wind | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Eastern Cottontail Solar approvals pending | EDF Renewables Development, Inc. | OH | planned | 220 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hidden Lakes Reliability Project independent owner | Evelyn Energy Storage LLC | TX | operating | 220 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hollis Creek Solar under construction, over half done | Hollis Creek PV I, LLC | LA | planned | 220 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Honey Creek Solar planned, approvals not started | Leeward Asset Management, LLC | IN | planned | 220 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Liberty Solar Energy Center under construction | Consumers Energy Co - (MI) | MI | planned | 220 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Noria Hondo Solar (Hybrid) approvals pending | Nexus Renewable Power, LLC | TX | planned | 220 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Prevailing Wind Park independent owner | AES Distributed Energy | SD | operating | 220 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Reid Gardner utility owner | Nevada Power Co | NV | operating | 220 | Battery storage | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tip Top Solar Energy Center LLC under construction, over half done | Invenergy Services LLC | NM | planned | 220 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Trenton Channel Energy Center under construction, over half done | DTE Electric Company | MI | planned | 220 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Willow Creek Wind (OK) independent owner | Willow Creek Wind LLC | OK | operating | 220 | Wind | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Anson 2 Solar under construction, over half done | Anson Solar Center 2, LLC | TX | planned | 219 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.