Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 20 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Sierra Estrella Energy Storage independent owner | Sierra Estrella Energy Storage, LLC | AZ | operating | 250 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | South Platte Storage under construction | South Platte Storage, LLC | CO | planned | 250 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sparta Solar independent owner | Sparta Solar, LLC | TX | operating | 250 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Toombs, LLC independent owner | SR Toombs I, LLC | GA | operating | 250 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sun Valley Solar Project independent owner | Sun Valley Solar LLC | TX | operating | 250 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tiger Solar under construction, over half done | Vaca Del Sol, LLC | TX | planned | 250 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Triple H Wind Project independent owner | Engie North America | SD | operating | 250 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Victory Pass independent owner | Victory Pass I, LLC | CA | operating | 250 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Willow Springs Wind Farm independent owner | Willow Springs Windfarm, LLC | TX | operating | 250 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Zeya under construction | Engie North America | TX | planned | 250 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Edwards Sanborn E4 independent owner | Terra-Gen Operating Co-Hybrid | CA | operating | 249 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kingstree East 230 Solar Project approvals received | Kingstree East 230 LLC | SC | planned | 249 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Marion utility owner | Southern Illinois Power Coop | IL | operating | 249 | Gas | 1963 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Milford Power LP independent owner | Milford Power LLC | MA | operating | 249 | Gas | 1993 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wever Solar (150MW) utility owner | Interstate Power and Light Co | IA | operating | 249 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Beaver Creek Wind Facility utility owner | Puget Sound Energy Inc | MT | operating | 248 | Wind | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cannibal Draw Solar and Storage approvals received | Red River Clean Energy | TX | planned | 248 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cedar Creek II independent owner | Clearlight Energy Holdings LP | CO | operating | 248 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | King Plains Wind Project independent owner | Engie North America | OK | operating | 248 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lupinus Solar 1, LLC planned, approvals not started | Sunraycer Assets I LLC | TX | planned | 248 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | River Road Gen Plant utility owner | PUD No 1 of Clark County - (WA) | WA | operating | 248 | Gas | 1997 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Armadillo Flats Wind Project, LLC independent owner | Armadillo Flats Wind Project, LLC | OK | operating | 247 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Beatrice utility owner | Nebraska Public Power District | NE | operating | 247 | Gas | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Buffalo Branch Wind and Solar LLC planned, approvals not started | Buffalo Branch Wind and Solar LLC | MO | planned | 247 | Wind | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crockett Cogen Project independent owner | Crockett Cogeneration | CA | operating | 247 | Gas | 1995 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Holtwood independent owner | BIF III Holtwood LLC | PA | operating | 247 | Hydro | 1910 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blythe Solar II, LLC independent owner | Blythe Solar II, LLC | CA | operating | 246 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Grape approvals received | Westlands Grape, LLC | CA | planned | 246 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cavalry Solar Hybrid utility owner | Cavalry Energy Center LLC | IN | operating | 245 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lake Trout Solar planned, approvals not started | Lake Trout Solar | IN | planned | 245 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Porter Solar, LLC (TX) independent owner | Porter Solar, LLC | TX | operating | 245 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rockhound A built, not yet in commercial operation | Origis Energy USA, Inc | TX | planned | 245 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | South Plant (CO) utility owner | City of Colorado Springs - (CO) | CO | operating | 245 | Gas | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Black Hawk Station independent owner | Borger Energy Associates LP | TX | operating | 244 | Gas | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gail Mountain Solar approvals received | Red River Clean Energy | TX | planned | 244 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pratt Wind, LLC independent owner | Pratt Wind, LLC | KS | operating | 244 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Coyote Wind LLC independent owner | EDF Renewable Asset Holdings, Inc. | TX | operating | 243 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | El Campo Wind independent owner | El Campo Wind, LLC (Longroad) | TX | operating | 243 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Peyton Creek Wind Farm II independent owner | RWE Clean Energy | TX | operating | 243 | Wind | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Trinidad (TX) independent owner | Luminant Generation Company LLC | TX | operating | 243 | Gas | 1965 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lupinus Solar 2 interconnection agreement signed 2025-03; online expected 2027-04; request 24INR0154; financial security poste | — | Franklin Co., TX | planned | 242 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Burlington Generating Station independent owner | Parkway Generation Operating, LLC | NJ | operating | 242 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Clear Creek Wind independent owner | Clear Creek Wind, LLC | MO | operating | 242 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | GenConn Devon LLC independent owner | GenConn Devon LLC | CT | operating | 242 | Oil | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | GenConn Middletown LLC independent owner | GenConn Middletown LLC | CT | operating | 242 | Oil | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Logan Generating Plant independent owner | Logan Generating Company LP | NJ | retired | 242 | Coal | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mohave Energy Park approvals pending | Arizona Electric Pwr Coop Inc | AZ | planned | 242 | Gas | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Northern Orchard Solar PV, LLC independent owner | RWE Clean Energy | CA | operating | 242 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Smarr Energy Center utility owner | Oglethorpe Power Corporation | GA | operating | 242 | Gas | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Winchester Power Park utility owner | Lower Colorado River Authority | TX | operating | 242 | Gas | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Worthington Generation LLC utility owner | Hoosier Energy R E C, Inc | IN | operating | 242 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Duffy BESS interconnection agreement signed 2025-07; online expected 2026-12; request 26INR0250; financial security poste | — | Matagorda Co., TX | planned | 241 | Battery storage | 2026 | ERCOT planned capacity changes |
| Power plant | Arapahoe utility owner | Public Service Co of Colorado | CO | retired | 241 | Coal | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Arlington Energy Center III independent owner | Arlington Energy Center III | CA | operating | 241 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | EDPR CA Solar Park VI LLC (CA) Hybrid built, not yet in commercial operation | EDPR CA Solar Park VI LLC | CA | planned | 241 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sweetwater Wind 4 LLC independent owner | Leeward Asset Management, LLC | TX | operating | 241 | Wind | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | 7V Solar Ranch independent owner | 7V Solar Ranch, LLC | TX | operating | 240 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Anole Energy Storage independent owner | Anole Energy Storage, LLC | TX | operating | 240 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bethpage Power Plant independent owner | Calpine Eastern Corp | NY | operating | 240 | Gas | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bighorn Solar 1 independent owner | Lightsource Renewable Energy Asset Management, LLC | CO | operating | 240 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blackjack Creek Wind Farm independent owner | RWE Clean Energy | TX | operating | 240 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cadence Solar Energy Center independent owner | Cadence Solar Energy LLC | OH | operating | 240 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cattlemen Solar Park built, not yet in commercial operation | Cattlemen Solar Park LLC | TX | planned | 240 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dolet Hills Solar under construction, over half done | Dolet Hills Solar | LA | planned | 240 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Eiffel Solar Project independent owner | Paris Farm Solar, LLC | TX | operating | 240 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fort Bend Solar LLC independent owner | Acciona Energy USA Global, LLC | TX | operating | 240 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lewiston Niagara utility owner | New York Power Authority | NY | operating | 240 | Hydro | 1961 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Misae Solar independent owner | Misae Lessee LLC | TX | operating | 240 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Peno Creek utility owner | Union Electric Co - (MO) | MO | operating | 240 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pickwick Landing Dam utility owner | Tennessee Valley Authority | TN | operating | 240 | Hydro | 1938 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pleinmont Solar 2 independent owner | AES Distributed Energy | VA | operating | 240 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pryor Mountain Wind utility owner | PacifiCorp | MT | operating | 240 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rich Road Solar Energy Center approvals pending | Rich Road Solar Energy Center | NY | planned | 240 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Scarlet Solar (CA) independent owner | EDP Renewables North America LLC | CA | operating | 240 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sky Ranch Solar independent owner | Sky Ranch Solar and Storage | NM | operating | 240 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Swift 1 utility owner | PacifiCorp | WA | operating | 240 | Hydro | 1958 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Watts Bar Fossil utility owner | Tennessee Valley Authority | TN | retired | 240 | Coal | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | West Raymond Wind Farm LLC independent owner | RWE Clean Energy | TX | operating | 240 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Big Sky Wind LLC independent owner | Big Sky Wind LLC | IL | operating | 239 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Monte Cristo 1 independent owner | Terra-Gen Operating Co-Wind | TX | operating | 239 | Wind | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | True North Solar, LLC independent owner | Avangrid Power LLC | TX | operating | 239 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wading River utility owner | National Grid Generation LLC | NY | operating | 239 | Oil | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bracero Pecan Storage interconnection agreement signed 2024-06; online expected 2027-07; request 26INR0034; financial security poste | — | Reeves Co., TX | planned | 238 | Battery storage | 2027 | ERCOT planned capacity changes |
| Power plant | Chevelon Butte Wind Farm independent owner | AES Clean Energy | AZ | operating | 238 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | FPL Energy Illinois Wind LLC Hybrid independent owner | FPL Energy Illinois Wind LLC | IL | operating | 238 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rio Bravo Windpower, LLC independent owner | Rio Bravo Windpower, LLC | TX | operating | 238 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cutler utility owner | Florida Power & Light Co | FL | retired | 237 | Gas | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Milton L Kapp utility owner | Interstate Power and Light Co | IA | retired | 237 | Gas | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sherco Solar II utility owner | Northern States Power Co - Minnesota | MN | operating | 237 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | White Cloud Wind Project, LLC independent owner | White Cloud Wind Project, LLC | MO | operating | 237 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Chapman Ranch Wind I independent owner | Chapman Ranch Wind LLC | TX | operating | 236 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Despain Solar approvals pending | Gransolar Texas Thirteen, LLC | TX | planned | 236 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Duffy BESS under construction, over half done | Duffy Energy Storage LLC | TX | planned | 236 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Exelon LaPorte Generating Station independent owner | LaPorte Power, LLC | TX | operating | 236 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Greenville Electric Generating Station utility owner | Buckeye Power, Inc | OH | operating | 236 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hickory Park Solar Hybrid independent owner | RWE Clean Energy | GA | operating | 236 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Libra Storage independent owner | Libra Storage LLC | TX | operating | 236 | Battery storage | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Montpelier Electric Generating Station independent owner | Kimura Power LLC | IN | operating | 236 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Aragonne Wind LLC independent owner | Leeward Asset Management, LLC | NM | operating | 235 | Wind | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kendall Square Station independent owner | Kendall Green Energy, LLC | MA | operating | 235 | Gas | 1958 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.