Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 17 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Vitex Storage approvals pending | Cypress Creek Renewables | NV | planned | 300 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Yaupon Solar Project (Hybrid) planned, approvals not started | Yaupon Solar, LLC | TX | planned | 300 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Yellow Wood Solar Energy LLC under construction | Invenergy Services LLC | OH | planned | 300 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wisdom Solar SLF interconnection agreement signed 2026-03; online expected 2027-10; request 27INR0438 | — | Pecos Co., TX | planned | 299 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Atchison County Wind utility owner | Union Electric Co - (MO) | MO | operating | 299 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Aurora Wind Project independent owner | Aurora Wind Project, LLC | ND | operating | 299 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Diamond Vista Wind Project, LLC independent owner | Enel Green Power Diamond Vista Wind Project, LLC | KS | operating | 299 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kalaeloa Cogen Plant independent owner | Kalaeloa Partners LP | HI | operating | 299 | Oil | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kay Wind, LLC independent owner | Southern Power Co | OK | operating | 299 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kingsley Solar Farm planned, approvals not started | 90FI 8me, LLC | CA | planned | 299 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Limestone Wind Project independent owner | Limestone Wind Project, LLC | TX | operating | 299 | Wind | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Red Dirt Wind Project independent owner | Red Dirt Wind Project, LLC | OK | operating | 299 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Upland Prairie utility owner | Interstate Power and Light Co | IA | operating | 299 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | El Cabo Wind independent owner | Avangrid Power LLC | NM | operating | 298 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Haystack Wind Project, LLC independent owner | Haystack Wind Project, LLC | NE | operating | 298 | Wind | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Iron Star Wind Project independent owner | Engie North America | KS | operating | 298 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kingfisher Wind LLC independent owner | Kingfisher Wind LLC | OK | operating | 298 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Klondike Windpower III independent owner | Avangrid Power LLC | OR | operating | 298 | Wind | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Thunder Ranch Wind Project independent owner | Thunder Ranch Wind Project, LLC | OK | operating | 298 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wheaton utility owner | Northern States Power Co - Minnesota | WI | operating | 298 | Gas | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Coolidge Generation Station under construction | Salt River Project | AZ | planned | 297 | Gas | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Firelands Wind under construction | Firelands Wind, LLC | OH | planned | 297 | Wind | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fremont Solar under construction | Fremont Solar, LLC | UT | planned | 297 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | John H Kerr utility owner | USCE-Wilmington District | VA | operating | 297 | Hydro | 1952 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Coyote Springs utility owner | Portland General Electric Co | OR | operating | 296 | Gas | 1995 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fortuna Wind interconnection agreement signed 2024-08; online expected 2026-07; request 22INR0301 | — | Jack Co., TX | planned | 295 | Wind | 2026 | ERCOT planned capacity changes |
| Power plant | Abercrombie Solar approvals pending | Otter Tail Power Co | ND | planned | 295 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Archer Daniels Midland Cedar Rapids independent owner | Archer Daniels Midland Co | IA | operating | 295 | Coal | 1988 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Handsome Lake Energy LLC independent owner | Handsome Lake Energy LLC | PA | operating | 295 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Canadian Hills Wind independent owner | Canadian Hills Wind LLC | OK | operating | 294 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Comanche (OK) utility owner | Public Service Co of Oklahoma | OK | operating | 294 | Gas | 1962 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | McMeekin utility owner | Dominion Energy South Carolina, Inc | SC | operating | 294 | Gas | 1958 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sypert Branch Solar under construction | Sypert Branch Solar LLC | TX | planned | 294 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Chisme Solar and Storage under construction | Red River Clean Energy | TX | planned | 293 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Edwards Sanborn E1A independent owner | Terra-Gen Operating Co-Hybrid | CA | operating | 293 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cedar Bay Generating Company LP independent owner | Cedar Bay Operating Services LLC | FL | retired | 292 | Coal | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Burlington (IA) utility owner | Interstate Power and Light Co | IA | operating | 291 | Gas | 1968 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Edwards Sanborn E1B independent owner | Terra-Gen Operating Co-Hybrid | CA | operating | 290 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Horseshoe Bend Wind LLC independent owner | Shepherds Flat Wind LLC | OR | operating | 290 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Okolona Solar approvals received | Okolona Solar, LLC | MS | planned | 290 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | South Hurlburt Wind LLC independent owner | Shepherds Flat Wind LLC | OR | operating | 290 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | South Ripley Solar approvals pending | Repsol Renewables NA | NY | planned | 290 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tecumseh Energy Center utility owner | Evergy Kansas Central, Inc | KS | retired | 290 | Coal | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tres Rios Ranch BESS interconnection agreement signed 2025-12; online expected 2027-12; request 25INR0451 | — | Upton Co., TX | planned | 290 | Battery storage | 2027 | ERCOT planned capacity changes |
| Power plant | Berkshire Power independent owner | Berkshire Power Co LLC | MA | operating | 289 | Gas | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Brandywine Power Facility independent owner | Alpha Generation Brandywine, LLC | MD | operating | 289 | Gas | 1996 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lodi Energy Center utility owner | Northern California Power Agny | CA | operating | 289 | Gas | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Miami Wind Energy Center independent owner | Invenergy Services LLC | TX | operating | 289 | Wind | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Buzzard Point independent owner | Potomac Power Resources | DC | retired | 288 | Oil | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Changing Winds approvals pending | Invenergy Services LLC | TX | planned | 288 | Wind | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Greenwood (MO) utility owner | Evergy Missouri West | MO | operating | 288 | Gas | 1975 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Maverick Wind Project, LLC utility owner | Public Service Co of Oklahoma | OK | operating | 288 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Monarch Creek Wind, LLC under construction, over half done | Monarch Creek Wind, LLC | TX | planned | 288 | Wind | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | NAEA Lakewood LLC independent owner | Essential Power Operating Company, LLC | NJ | operating | 288 | Gas | 1994 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Afton Generating Station utility owner | Public Service Co of NM | NM | operating | 287 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Archtop Solar independent owner | Archtop Property Management LLC | IL | operating | 287 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Coyote Springs II utility owner | Avista Corp | OR | operating | 287 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fifth Standard Solar PV, LLC (Hybrid) independent owner | RWE Clean Energy | CA | operating | 287 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Vikings Energy Farm independent owner | Vikings Energy Farm, LLC | CA | operating | 287 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Spindletop Solar interconnection agreement signed 2025-12; online expected 2027-12; request 27INR0313; financial security poste | — | Nacogdoches Co., TX | planned | 286 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Chestnut independent owner | Chestnut Westside LLC | CA | operating | 286 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ferndale Generating Station utility owner | Puget Sound Energy Inc | WA | operating | 286 | Gas | 1994 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pomeroy Wind Farm utility owner | MidAmerican Energy Co | IA | operating | 286 | Wind | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Saranac Facility independent owner | Saranac Power Partners LP | NY | operating | 286 | Gas | 1994 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Chambers Cogeneration LP independent owner | US Operating Services Company | NJ | retired | 285 | Coal | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Escape Solar Plant independent owner | Escape Solar LLC | NV | operating | 285 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wolf Hills Energy independent owner | Middle River Power II, LLC | VA | operating | 285 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Inver Hills utility owner | Northern States Power Co - Minnesota | MN | operating | 284 | Gas | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | LSP-Cottage Grove LP independent owner | Cottage Grove Operating Services LLC | MN | operating | 284 | Gas | 1997 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Whitewater Generating Station utility owner | Wisconsin Electric Power Co | WI | operating | 284 | Gas | 1997 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Monarch Creek Wind interconnection agreement signed 2020-08; online expected 2027-09; request 21INR0263; financial security poste | — | Throckmorton Co., TX | planned | 283 | Wind | 2027 | ERCOT planned capacity changes |
| Power plant | Johnson County utility owner | Johnson County Power LLC | TX | operating | 283 | Gas | 1996 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Noblesville utility owner | Duke Energy Indiana, LLC | IN | operating | 283 | Gas | 1950 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pattern Gulf Wind independent owner | Pattern Operators LP | TX | operating | 283 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ray D Nixon utility owner | City of Colorado Springs - (CO) | CO | operating | 283 | Coal | 1980 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tanzanite Storage independent owner | Tanzanite Energy Storage LLC | TX | operating | 283 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Palo Duro Wind independent owner | Palo Duro Wind | TX | operating | 282 | Wind | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Big Sandy utility owner | Kentucky Power Co | KY | operating | 281 | Gas | 1963 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Western Plains Wind Farm utility owner | Evergy Kansas Central, Inc | KS | operating | 281 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Excelsior Energy Center under construction | Excelsior Energy Center, LLC | NY | planned | 280 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hog Bayou Energy Center independent owner | Mobile Energy LLC | AL | operating | 280 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mojave Solar Project independent owner | Mojave Solar LLC | CA | operating | 280 | Solar | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Piedra Solar built, not yet in commercial operation | Piedra Solar, LLC | TX | planned | 280 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Solana Generating Station independent owner | Arizona Solar One LLC | AZ | operating | 280 | Solar | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wheatridge Hybrid independent owner | Wheatridge Wind Holdings, LLC | OR | operating | 280 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Silver Peak independent owner | Silver Peak Solar, LLC | NV | operating | 279 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Solar Star 2 independent owner | Solar Star California XX, LLC | CA | operating | 279 | Solar | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | FirstEnergy Albright utility owner | Monongahela Power Co | WV | retired | 278 | Coal | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | King Mountain Wind Ranch 1 independent owner | FPL Energy Upton Wind LP | TX | operating | 278 | Wind | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lake Road (MO) utility owner | Evergy Missouri West | MO | operating | 278 | Gas | 1950 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Radfords Run Wind Farm independent owner | RWE Clean Energy | IL | operating | 278 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tiger Bay utility owner | Duke Energy Florida, LLC | FL | operating | 278 | Gas | 1997 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Yellowtail utility owner | U S Bureau of Reclamation | MT | operating | 278 | Hydro | 1966 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crossroads Wind interconnection agreement signed 2024-07; online expected 2028-02; request 26INR0021; financial security poste | — | Victoria Co., TX | planned | 277 | Wind | 2028 | ERCOT planned capacity changes |
| Power plant | Motiva Enterprises Port Arthur Refinery independent owner | Motiva Enterprises LLC | TX | operating | 277 | Gas | 1957 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | RE Tranquillity independent owner | Southern Power Co | CA | operating | 277 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bethel Wind Farm LLC independent owner | Southern Power Co | TX | operating | 276 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blue Hills Wind Project approvals pending | Greenalia Wind Power Blue Hills, LLC | TX | planned | 276 | Wind | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Devil Canyon utility owner | California Dept. of Water Resources | CA | operating | 276 | Hydro | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Muscatine Plant #1 utility owner | Board of Water Electric & Communications | IA | operating | 276 | Coal | 1958 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.