Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 16 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Lincoln Land Wind independent owner | Lincoln Land Wind, LLC | IL | operating | 302 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | MEPI GT Facility independent owner | Midwest Electric Power Inc | IL | retired | 302 | Gas | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Priddy Wind Project independent owner | Engie North America | TX | operating | 302 | Wind | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rathdrum Power LLC independent owner | Rathdrum Power LLC | ID | operating | 302 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Santa Rita East independent owner | Invenergy Services LLC | TX | operating | 302 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Seven Cowboy Wind Project, LLC independent owner | Seven Cowboy Wind Project, LLC | OK | operating | 302 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cedar Creek Wind independent owner | Leeward Asset Management, LLC | CO | operating | 301 | Wind | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | El Sauz Ranch Wind, LLC independent owner | El Sauz Ranch Wind, LLC | TX | operating | 301 | Wind | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ida Grove Wind utility owner | MidAmerican Energy Co | IA | operating | 301 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Inertia Wind Project independent owner | Inertia Wind Project, LLC | TX | operating | 301 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Irish Creek Wind independent owner | Irish Creek Wind, LLC | KS | operating | 301 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lacy Creek Wind Energy Center independent owner | Lacy Creek Wind, LLC | TX | operating | 301 | Wind | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Neosho Ridge Wind Energy Center utility owner | Empire District Electric Co | KS | operating | 301 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Solano Wind utility owner | Sacramento Municipal Util Dist | CA | operating | 301 | Wind | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Uva Creek Solar approvals received | Red River Clean Energy | TX | planned | 301 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Walnut Energy Center utility owner | Turlock Irrigation District | CA | operating | 301 | Gas | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Great Rock BESS interconnection agreement signed 2024-08; online expected 2027-12; request 25INR0230 | — | Leon Co., TX | planned | 301 | Battery storage | 2027 | ERCOT planned capacity changes |
| Power plant | Jaguar Solar interconnection agreement signed 2022-09; online expected 2027-12; request 24INR0038; financial security poste | — | McLennan Co., TX | planned | 301 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | 1000 Mile Solar built, not yet in commercial operation | 1000 Mile Solar, LLC | TX | planned | 300 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Amerada approvals pending | Cypress Creek Renewables | TX | planned | 300 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Atlas under construction, over half done | 174 Power Global Corp. | AZ | planned | 300 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | ATLAS SOLAR IV under construction, over half done | ATLAS SOLAR IV, LLC | AZ | planned | 300 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Atlas VII independent owner | Atlas VII LLC | AZ | operating | 300 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Atrisco Energy Storage independent owner | Atrisco Energy Storage LLC | NM | operating | 300 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Atrisco Solar LLC independent owner | Atrisco Solar LLC | NM | operating | 300 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Balko Wind LLC independent owner | Balko Wind LLC | OK | operating | 300 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bellefield 3 Solar and Battery Storage planned, approvals not started | 51LV 8me, LLC | CA | planned | 300 | Solar | 2030 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bighorn Ridge Solar approvals received | NextEra Energy Resources - ERCOT | TX | planned | 300 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Box Canyon (AZ) independent owner | BOCA bn, LLC | AZ | operating | 300 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bronco Plains Wind, LLC independent owner | Bronco Plains Wind, LLC | CO | operating | 300 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cabin Creek utility owner | Public Service Co of Colorado | CO | operating | 300 | Hydro | 1967 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cantaloupe Solar under construction | Cantaloupe Solar - ERCOT | TX | planned | 300 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cartwheel 1 - Storage, LLC independent owner | RWE Clean Energy | TX | operating | 300 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cazadores Solar planned, approvals not started | Cazadores Solar LLC | TX | planned | 300 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cedro Hill Wind LLC independent owner | Cedro Hill Wind, LLC | TX | operating | 300 | Wind | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Chisholm View Wind Project independent owner | Chisholm View Wind Project | OK | operating | 300 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Coles Wind under construction | Coles Wind, LLC | IL | planned | 300 | Wind | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dahlia Energy planned, approvals not started | Dahlia Energy LLC | TX | planned | 300 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Deep Space Solar planned, approvals not started | Deep Space Solar LLC | CO | planned | 300 | Solar | 2030 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Delilah Solar Energy LLC independent owner | Invenergy Services LLC | TX | operating | 300 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Deuel Harvest Wind Energy LLC independent owner | Southern Power Co | SD | operating | 300 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Eagle Shadow Mountain Solar Farm independent owner | 325MK 8me LLC | NV | operating | 300 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Elio Energy LLC planned, approvals not started | Elio Energy LLC | TX | planned | 300 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gordonsville Energy LP utility owner | Virginia Electric & Power Co | VA | operating | 300 | Gas | 1994 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Grant County utility owner | Wisconsin Power & Light Co | WI | operating | 300 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | GulfStar Power, LLC independent owner | GulfStar Power, LLC | TX | operating | 300 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hecate Energy Highland LLC independent owner | Hecate Energy Highland LLC | OH | operating | 300 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Heritage Prairie Solar LLC approvals received | Pattern Operators LP | IL | planned | 300 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | High Noon Solar Energy LLC under construction | Invenergy Services LLC | WI | planned | 300 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hubbard Wind independent owner | Hubbard Wind LLC | TX | operating | 300 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Humidor Storage I planned, approvals not started | Hecate Grid Humidor Storage 1 LLC | CA | planned | 300 | Battery storage | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kern River Cogeneration independent owner | Kern River Cogeneration Co | CA | operating | 300 | Gas | 1985 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Key Energy Storage approvals received | Key Energy Storage LLC | CA | planned | 300 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Koshkonong Solar Energy Center LLC under construction, over half done | Invenergy Services LLC | WI | planned | 300 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mammoth Central II Solar Facility under construction | Mammoth Central II LLC | IN | planned | 300 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mammoth Central Solar Project under construction | Mammoth Central LLC | IN | planned | 300 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mammoth South Solar Project under construction, over half done | Mammoth South LLC | IN | planned | 300 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Manchief Electric Generating Station utility owner | Public Service Co of Colorado | CO | operating | 300 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | McFarland A Solar and Storage independent owner | AES Clean Energy | AZ | operating | 300 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Meadow Springs Renewable Energy (Hybrid) planned, approvals not started | Vesper Energy Development LLC | IL | planned | 300 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Milligan 1 Wind Farm independent owner | Milligan 1 Wind, LLC | NE | operating | 300 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mossyrock utility owner | City of Tacoma - (WA) | WA | operating | 300 | Hydro | 1968 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | New Melones utility owner | U S Bureau of Reclamation | CA | operating | 300 | Hydro | 1979 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nighthawk Energy Storage, LLC independent owner | Nighthawk Energy Storage, LLC | CA | operating | 300 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | NISA Electric Generation Project approvals received | NYC Energy LLC | NY | planned | 300 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | O'Bannion Energy Storage approvals received | O'Bannion Energy Storage, LLC | TX | planned | 300 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Overnight Solar under construction | Overnight Solar LLC | CA | planned | 300 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Oxbow Solar 1 independent owner | Lightsource Renewable Energy Asset Management, LLC | LA | operating | 300 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Papago Energy Storage independent owner | RE Papago LLC | AZ | operating | 300 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pease River Solar planned, approvals not started | Pease River Solar LLC | TX | planned | 300 | Solar | 2030 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Peregrine Solar independent owner | RWE Clean Energy | TX | operating | 300 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pinopolis BESS planned, approvals not started | Pinopolis BESS LLC | SC | planned | 300 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pioneer Prairie Wind Farm independent owner | Pioneer Prairie Wind Farm I, LLC | IA | operating | 300 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | PP Jaguar BESS LLC independent owner | PP Jaguar BESS LLC | TX | operating | 300 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Prairie Hill Wind Project independent owner | Engie North America | TX | operating | 300 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Prosperity Wind independent owner | Prosperity Wind, LLC | IL | operating | 300 | Wind | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Prospero Solar independent owner | Prospero Energy Project, LLC (Longroad) | TX | operating | 300 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ranchero Wind Farm LLC independent owner | Ranchero Wind Farm LLC | TX | operating | 300 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Red Egret under construction | Red Egret, LLC | TX | planned | 300 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Roadhouse Energy Center approvals pending | Roadhouse Energy Storage | CA | planned | 300 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rock Creek Wind Project independent owner | Enel Green Power NA, Inc. | MO | operating | 300 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rocky Run Solar planned, approvals not started | Dominion Renewable Energy | VA | planned | 300 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rodeo Ranch Energy Storage independent owner | Rodeo Ranch Energy Storage, LLC | TX | operating | 300 | Battery storage | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sacramento Valley Energy Center, LLC under construction | Sacramento Valley Energy Center, LLC | CA | planned | 300 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | San Juan Solar I independent owner | San Juan Solar I, LLC | NM | operating | 300 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Santa Rita Wind Energy independent owner | BHE Renewables, LLC | TX | operating | 300 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Singer Solar planned, approvals not started | Singer Solar, LLC | LA | planned | 300 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Soldier Creek Wind independent owner | Soldier Creek Wind LLC | KS | operating | 300 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | South Plains II independent owner | Onward Energy | TX | operating | 300 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Split Rail Solar Energy LLC independent owner | Invenergy Services LLC | MO | operating | 300 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Stateline Solar independent owner | Southern Power Co | CA | operating | 300 | Solar | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Streator Cayuga Ridge South independent owner | Avangrid Power LLC | IL | operating | 300 | Wind | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sycamore Cogeneration independent owner | Sycamore Cogeneration Co | CA | operating | 300 | Gas | 1987 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tahoka Wind independent owner | Tahoka Wind, LLC | TX | operating | 300 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Thunderhead Wind Energy LLC independent owner | Invenergy Services LLC | NE | operating | 300 | Wind | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Torrecillas Wind Energy, LLC independent owner | Torrecillas Wind Energy, LLC | TX | operating | 300 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TREX US Red Holly approvals pending | TREX US Red Holly LLC | TX | planned | 300 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TX Jumbo Road Wind independent owner | TX Jumbo Road Wind, LLC | TX | operating | 300 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Utah Solar 1 planned, approvals not started | ECG Utah Solar1, LLC | UT | planned | 300 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Uvalde Solar 2 planned, approvals not started | RWE Clean Energy | TX | planned | 300 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.