Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 15 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Palo Alto Wind Farm utility owner | MidAmerican Energy Co | IA | operating | 340 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sumpter utility owner | Wolverine Power Supply Coop | MI | operating | 340 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Golden Field Solar III, LLC independent owner | Golden Fields Solar III, LLC | CA | operating | 339 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Glen Lyn utility owner | Appalachian Power Co | VA | retired | 338 | Coal | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sage Draw Wind independent owner | Sage Draw Wind, LLC | TX | operating | 338 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sarpy County utility owner | Omaha Public Power District | NE | operating | 338 | Gas | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blythe Mesa Solar II independent owner | Intersect USA, LLC | CA | operating | 336 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TG East independent owner | TG East Wind Project LLC | TX | operating | 336 | Wind | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tracy Combined Cycle Power Plant independent owner | MRP San Joaquin Energy LLC. | CA | operating | 336 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Archer Daniels Midland Decatur independent owner | Archer Daniels Midland Co | IL | operating | 335 | Coal | 1987 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Arroyo Solar under construction | Public Service Co of Colorado | CO | planned | 335 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Faribault Energy Park utility owner | Minnesota Municipal Power Agny | MN | operating | 335 | Gas | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Concho Pearl Solar and Storage approvals received | Red River Clean Energy | TX | planned | 334 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fagus Solar Park independent owner | Excel Advantage Services, LLC | TX | operating | 332 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | J C Weadock utility owner | Consumers Energy Co - (MI) | MI | retired | 331 | Coal | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bellmeade Power Station utility owner | Virginia Electric & Power Co | VA | retired | 330 | Gas | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Boswell Wind independent owner | Boswell Wind, LLC | WY | operating | 330 | Wind | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Indigo Solar & Storage planned, approvals not started | Innovative Solar 245 LLC | TX | planned | 330 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Stampede Solar Hybrid independent owner | Stampede Solar Project LLC | TX | operating | 328 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dickerson Power independent owner | Dickerson Power, LLC | MD | operating | 326 | Gas | 1992 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | FirstEnergy Armstrong Power Station independent owner | Allegheny Energy Supply Co LLC | PA | retired | 326 | Coal | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | AEUG Union Solar, LLC independent owner | Acciona Energy USA Global, LLC | OH | operating | 325 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Clines Corners Wind Farm LLC independent owner | Pattern Operators LP | NM | operating | 325 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Desert Peak Energy Storage I independent owner | Desert Peak Energy Storage I, LLC | CA | operating | 325 | Battery storage | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pecan Prairie North interconnection agreement signed 2021-02; online expected 2027-05; request 21INR0428; financial security poste | — | Leon Co., TX | planned | 324 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Deer Creek Station utility owner | Basin Electric Power Coop | SD | operating | 324 | Gas | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Delaware City Plant independent owner | Delaware City Refining Company LLC | DE | operating | 324 | Gas | 1956 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dow St Charles Operations independent owner | Dow Chemical Co - St Charles | LA | operating | 324 | Gas | 1996 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Foundry Ridge Energy Center LLC planned, approvals not started | Invenergy Services LLC | WI | planned | 324 | Gas | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Notch Peak Solar LLC approvals received | Notch Peak Solar LLC | UT | planned | 324 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pecan Prairie North Solar under construction | Repsol Renewables NA | TX | planned | 324 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Shamrock Wind independent owner | Shamrock Wind LLC | TX | operating | 324 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Whelan Energy Center utility owner | City of Hastings - (NE) | NE | operating | 324 | Coal | 1981 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cayuga Operating Company independent owner | Cayuga Operating Company, LLC | NY | retired | 323 | Coal | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mid-Georgia Cogeneration Facility independent owner | SEPG MGA, LLC | GA | operating | 323 | Gas | 1997 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Brooklyn Navy Yard Cogeneration independent owner | Brooklyn Navy Yard Cogen PLP | NY | operating | 322 | Gas | 1996 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lake Creek independent owner | Luminant Generation Company LLC | TX | retired | 322 | Gas | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Holden utility owner | Associated Electric Coop, Inc | MO | operating | 321 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Maple Ridge Wind Farm independent owner | Flat Rock Windpower, LLC | NY | operating | 321 | Wind | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wallace Dam utility owner | Georgia Power Co | GA | operating | 321 | Hydro | 1979 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fort Randall utility owner | USACE-Omaha | SD | operating | 320 | Hydro | 1954 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Vidal Energy Center under construction, over half done | CDH Vidal LLC | CA | planned | 320 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Langley Gulch Power Plant utility owner | Idaho Power Co | ID | operating | 319 | Gas | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mint Farm Generating Station utility owner | Puget Sound Energy Inc | WA | operating | 319 | Gas | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rock River utility owner | Wisconsin Power & Light Co | WI | retired | 319 | Gas | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bayou Cogen Plant independent owner | Air Liquide Large Industries U S LP | TX | operating | 318 | Gas | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Frederickson Power LP independent owner | Frederickson Power LP | WA | operating | 318 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rattlesnake Creek Wind Project independent owner | Rattlesnake Creek Wind Project, LLC | NE | operating | 318 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Solar Star 1 independent owner | Solar Star California XIX, LLC | CA | operating | 318 | Solar | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wilson utility owner | Georgia Power Co | GA | operating | 318 | Oil | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Theodore Cogen Facility utility owner | Alabama Power Co | AL | operating | 317 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Azure Sky Solar independent owner | Azure Sky Solar Project, LLC | TX | operating | 316 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Darlington County utility owner | Duke Energy Progress - (NC) | SC | operating | 316 | Gas | 1997 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nodaway utility owner | Associated Electric Coop, Inc | MO | operating | 316 | Gas | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | NRG Rockford I independent owner | Rockford Generation LLC | IL | operating | 316 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Colgate utility owner | Yuba County Water Agency - (CA) | CA | operating | 315 | Hydro | 1969 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Delaware Generating Station independent owner | Constellation Power, Inc | PA | retired | 315 | Oil | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Desert Sunlight 300, LLC independent owner | NextEra Energy Desert Sunlight 300, LLC | CA | operating | 314 | Solar | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Calumet Energy Team LLC independent owner | IPA Operations Inc - Calumet | IL | operating | 313 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Daggett 2 independent owner | Daggett Solar Power 2 LLC | CA | operating | 313 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Myrtle Solar, LLC built, not yet in commercial operation | Myrtle Solar, LLC | TX | planned | 313 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Beluga utility owner | Chugach Electric Assn Inc | AK | operating | 312 | Gas | 1968 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Red Egret BESS interconnection agreement signed 2023-06; online expected 2027-11; request 24INR0281; financial security poste | — | Galveston Co., TX | planned | 311 | Battery storage | 2027 | ERCOT planned capacity changes |
| Power plant | Arbor Hill Wind Farm utility owner | MidAmerican Energy Co | IA | operating | 310 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | BT Hickerson Solar, LLC independent owner | BT Hickerson Solar, LLC | TX | operating | 310 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | CFB Power Plant independent owner | Formosa Plastics Corp | TX | operating | 310 | Gas | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Delilah Solar Energy II LLC independent owner | Invenergy Services LLC | TX | operating | 310 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Milford Solar Phase II under construction | Milford Solar Phase II, LLC | UT | planned | 310 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Paris Solar utility owner | Wisconsin Electric Power Co | WI | operating | 310 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Shell Chemical Appalachia LLC independent owner | Shell Chemical Appalachia LLC | PA | operating | 310 | Gas | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Canyon Wind Project, LLC independent owner | Canyon Wind Project, LLC | TX | operating | 309 | Wind | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SanPat Solar I interconnection agreement signed 2023-10; online expected 2027-07; request 25INR0081; financial security poste | — | San Patricio Co., TX | planned | 309 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Seine BESS interconnection agreement signed 2024-12; online expected 2027-10; request 23INR0140; financial security poste | — | Foard Co., TX | planned | 309 | Battery storage | 2027 | ERCOT planned capacity changes |
| Power plant | Fence Post Solar Hybrid Project, LLC independent owner | Fence Post Solar Project, LLC | TX | operating | 308 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Karankawa Wind LLC independent owner | Avangrid Power LLC | TX | operating | 307 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ocean State Power II independent owner | Ocean State Power II | RI | operating | 307 | Gas | 1991 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | WPWP independent owner | Wild Plains Wind Project, LLC | KS | operating | 307 | Wind | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Laurel Wind Energy Center interconnection agreement signed 2024-10; online expected 2027-12; request 27INR0056; financial security poste | — | Pecos Co., TX | planned | 307 | Wind | 2027 | ERCOT planned capacity changes |
| Power plant | Ash Creek BESS planned, approvals not started | ACTX BESS Project LLC | TX | planned | 306 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crossroads Energy Center utility owner | Clarksdale Public Utilities | MS | operating | 306 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Greasewood II LLC independent owner | Greasewood II LLC | TX | operating | 306 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hennepin Power Station independent owner | Dynegy Midwest Generation Inc | IL | retired | 306 | Coal | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Juno Solar Project independent owner | SE Juno, LLC | TX | operating | 306 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | La Joya NM independent owner | Avangrid Power LLC | NM | operating | 306 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Los Esteros Critical Energy Center independent owner | Los Esteros Critical Energy Facility LLC | CA | operating | 306 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SGT Hoskins Solar Project Hybrid planned, approvals not started | SGT Hoskins Solar Project, LLC | TX | planned | 306 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Westlake Plaquemine independent owner | Westlake Chemicals & Vinyls LLC | LA | operating | 306 | Gas | 1997 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Butler-Warner Generation Plant utility owner | Fayetteville Public Works Commission | NC | operating | 305 | Gas | 1976 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Estonian Solar Project, LLC independent owner | Enel Green Power Estonian Solar Project, LLC | TX | operating | 305 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hubbard Wind II independent owner | Hubbard Wind II, LLC | TX | operating | 305 | Wind | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mooreland utility owner | Western Farmers Elec Coop, Inc | OK | operating | 305 | Gas | 1964 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dakota Range Wind utility owner | Northern States Power Co - Minnesota | SD | operating | 304 | Wind | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Diamond Spring, LLC independent owner | ALLETE Clean Energy | OK | operating | 304 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SMT Ironman Battery Storage Plant independent owner | SMT Ironman BESS LLC | TX | operating | 304 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | NavBoot BESS interconnection agreement signed 2025-10; online expected 2027-11; request 25INR0375 | — | Nueces Co., TX | planned | 304 | Battery storage | 2027 | ERCOT planned capacity changes |
| Power plant | Goat Mountain Wind-Repower interconnection agreement signed 2026-02; online expected 2027-03; request 27INR0367; financial security poste | — | Sterling Co., TX | planned | 303 | Wind | 2027 | ERCOT planned capacity changes |
| Power plant | Caddo Wind independent owner | ALLETE Clean Energy | OK | operating | 303 | Wind | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Goldendale Generating Station utility owner | Puget Sound Energy Inc | WA | operating | 303 | Gas | 2004 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blue Creek Wind Project independent owner | Avangrid Power LLC | OH | operating | 302 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Indiana Crossroads Wind Farm LLC independent owner | Indiana Crossroads Wind Farms LLC | IN | operating | 302 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.