Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 14 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Waiau utility owner | Hawaiian Electric Co Inc | HI | operating | 375 | Oil | 1959 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Round Butte utility owner | Portland General Electric Co | OR | operating | 373 | Hydro | 1964 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kemper County utility owner | Tennessee Valley Authority | MS | operating | 372 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Alliant Energy Neenah utility owner | Wisconsin Power & Light Co | WI | operating | 371 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | J D Kennedy utility owner | JEA | FL | operating | 370 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | F B Culley utility owner | Southern Indiana Gas & Elec Co | IN | operating | 369 | Coal | 1966 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Darbytown utility owner | Virginia Electric & Power Co | VA | operating | 368 | Gas | 1990 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Timmerman Power Plant utility owner | Lower Colorado River Authority | TX | operating | 368 | Gas | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lupinus Solar 2, LLC planned, approvals not started | Sunraycer Assets I LLC | TX | planned | 367 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Western Trail Wind, LLC independent owner | Orsted Onshore North America | TX | operating | 367 | Wind | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Clearwater Wind I independent owner | Clearwater Energy Resources LLC | MT | operating | 366 | Wind | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Space City Solar interconnection agreement signed 2025-12; online expected 2027-06; request 21INR0341; financial security poste | — | Wharton Co., TX | planned | 366 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Arlington Energy Center II independent owner | Arlington Energy Center II | CA | operating | 365 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Brunot Island independent owner | Brunot Island Power, LLC | PA | operating | 365 | Gas | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nearman Creek utility owner | City of Kansas City - (KS) | KS | operating | 365 | Coal | 1981 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | J R Whiting utility owner | Consumers Energy Co - (MI) | MI | retired | 364 | Coal | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lonesome Creek Station utility owner | Basin Electric Power Coop | ND | operating | 363 | Gas | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Quantum II Solar built, not yet in commercial operation | Intersect USA, LLC | TX | planned | 363 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Quantum Solar built, not yet in commercial operation | Intersect USA, LLC | TX | planned | 363 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blue Lake utility owner | Northern States Power Co - Minnesota | MN | operating | 362 | Gas | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | J Strom Thurmond utility owner | USCE-Savannah District | SC | operating | 362 | Hydro | 1953 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wyodak utility owner | PacifiCorp | WY | operating | 362 | Coal | 1978 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Garrison Energy Center LLC independent owner | Garrison Energy Center LLC | DE | operating | 361 | Gas | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cherry approvals received | Westlands Cherry, LLC | CA | planned | 360 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dawn Break Solar approvals pending | Dawn Break Solar, LLC | WI | planned | 360 | Battery storage | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hartwell Energy Facility utility owner | Oglethorpe Power Corporation | GA | operating | 360 | Gas | 1994 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Red Tailed Hawk Solar LLC independent owner | Acciona Energy USA Global, LLC | TX | operating | 360 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sunfish Solar 2 under construction | Consumers Energy Co - (MI) | MI | planned | 360 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Arco Wind and Solar Project approvals received | PacifiCorp | ID | planned | 359 | Wind | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Calcasieu utility owner | Entergy Louisiana LLC | LA | operating | 359 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ector County Energy Center independent owner | Ector County Generation, LLC | TX | operating | 359 | Gas | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Las Vegas Generating Station utility owner | Nevada Power Co | NV | operating | 359 | Gas | 1994 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dean utility owner | DTE Electric Company | MI | operating | 358 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | PPG Powerhouse C independent owner | Westlake 2 US LLC | LA | operating | 358 | Gas | 1977 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TORMES SOLAR interconnection agreement signed 2024-04; online expected 2027-03; request 22INR0437; financial security poste | — | Navarro Co., TX | planned | 357 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Crete Energy Venture LLC independent owner | Crete Energy Venture LLC | IL | operating | 356 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | New Castle Plant independent owner | New Castle Power, LLC | PA | operating | 354 | Gas | 1952 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Big Sandy Peaker Plant independent owner | Middle River Power II, LLC | WV | operating | 353 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Essential Power Massachusetts LLC independent owner | NAEA Energy Massachusetts LLC | MA | retired | 353 | Gas | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Foard City Wind independent owner | Foard City Wind, LLC | TX | operating | 353 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | University Park South independent owner | University Park Energy LLC | IL | operating | 353 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lucy Solar interconnection agreement signed 2024-05; online expected 2027-06; request 25INR0225; financial security poste | — | Concho Co., TX | planned | 352 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Frontier Windpower II independent owner | Deriva Energy | OK | operating | 352 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kraft utility owner | Georgia Power Co | GA | retired | 352 | Coal | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Narrows Gas Turbines Generating independent owner | Astoria Generating Company, L.P. | NY | operating | 352 | Gas | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Proxima independent owner | Proxima Solar, LLC | CA | operating | 352 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rowdy Creek Solar interconnection agreement signed 2025-05; online expected 2027-12; request 24INR0186; financial security poste | — | Lamar Co., TX | planned | 352 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Funston Solar interconnection agreement signed 2024-10; online expected 2027-02; request 29INR0015; financial security poste | — | Jones Co., TX | planned | 351 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Knox Lee utility owner | Southwestern Electric Power Co | TX | operating | 351 | Gas | 1974 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lucy Solar under construction, over half done | Concho County Solar 1 LLC | TX | planned | 351 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | South Harper utility owner | Evergy Missouri West | MO | operating | 351 | Gas | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Chillingham Solar built, not yet in commercial operation | Chillingham Solar LLC | TX | planned | 350 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cottonwood Bayou Solar built, not yet in commercial operation | Cottonwood Bayou Solar, LLC | TX | planned | 350 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cowans Ford utility owner | Duke Energy Carolinas, LLC | NC | operating | 350 | Hydro | 1963 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crimson independent owner | RE Crimson LLC | CA | operating | 350 | Battery storage | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Easley Solar independent owner | IP Easley, LLC | CA | operating | 350 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Elisabeth Solar approvals pending | Leeward Asset Management, LLC | AZ | planned | 350 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Funston Solar under construction, over half done | Funston Solar, LLC | TX | planned | 350 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Harvey Solar approvals received | Leeward Asset Management, LLC | OH | planned | 350 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mohave County Wind Farm independent owner | Mohave County Wind Farm | AZ | operating | 350 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Red Cloud Wind LLC independent owner | Pattern Operators LP | NM | operating | 350 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | River Valley utility owner | Oklahoma Gas & Electric Co | OK | operating | 350 | Coal | 1990 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Scarlet II Hybrid independent owner | EDPR Scarlet II LLC | CA | operating | 350 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wallingford Energy independent owner | Wallingford Energy LLC | CT | operating | 350 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Astoria Station utility owner | Otter Tail Power Co | SD | operating | 349 | Gas | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Caithness Long Island Energy Center independent owner | Caithness Long Island, LLC | NY | operating | 349 | Gas | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Harry D Mattison Gas Plant utility owner | Southwestern Electric Power Co | AR | operating | 349 | Gas | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Holcomb utility owner | Sunflower Electric Power Corp | KS | operating | 349 | Coal | 1983 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Major Oak Power independent owner | Major Oak Power, LLC | TX | operating | 349 | Coal | 1990 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Murray Gill utility owner | Evergy Kansas South, Inc | KS | retired | 349 | Gas | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rex Brown utility owner | Entergy Mississippi LLC | MS | retired | 349 | Gas | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Agua Caliente Solar Project independent owner | Agua Caliente Solar | AZ | operating | 348 | Solar | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Platinum Storage independent owner | Platinum Energy Storage LLC | TX | operating | 348 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rio Grande utility owner | El Paso Electric Co | NM | operating | 348 | Gas | 1958 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Thunder Wolf Energy Center Hybrid independent owner | Thunder Wolf Energy Center, LLC | CO | operating | 348 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tulsa utility owner | Public Service Co of Oklahoma | OK | operating | 348 | Gas | 1956 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cannon Falls Energy Center independent owner | Invenergy Services LLC | MN | operating | 347 | Gas | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | George M Sullivan Generation Plant 2 utility owner | Chugach Electric Assn Inc | AK | operating | 347 | Gas | 1979 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sheboygan Falls utility owner | Wisconsin Power & Light Co | WI | operating | 347 | Gas | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Enterprise Energy Facility independent owner | DEGS of O&M, LLC | MS | retired | 346 | Gas | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Genoa utility owner | Dairyland Power Coop | WI | retired | 346 | Coal | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Spring Creek Energy Center utility owner | Evergy Kansas Central, Inc | OK | operating | 346 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cass County utility owner | Omaha Public Power District | NE | operating | 345 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hutchinson Energy Center utility owner | Evergy Kansas Central, Inc | KS | operating | 345 | Gas | 1974 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Anson County Generation Facility utility owner | North Carolina El Member Corp | NC | operating | 344 | Gas | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cooper utility owner | East Kentucky Power Coop, Inc | KY | operating | 344 | Coal | 1965 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hamlet Generating Facility utility owner | North Carolina El Member Corp | NC | operating | 344 | Gas | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mitchell (GA) utility owner | Georgia Power Co | GA | retired | 344 | Coal | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TXU Sweetwater Generating Plant independent owner | Luminant Generation Company LLC | TX | retired | 344 | Gas | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Indian River Plant utility owner | Orlando Utilities Comm | FL | operating | 343 | Gas | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lower Snake River Wind Energy Project utility owner | Puget Sound Energy Inc | WA | operating | 343 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | NRG Norwalk Harbor independent owner | Norwalk Power LLC | CT | retired | 343 | Oil | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lansing utility owner | Interstate Power and Light Co | IA | retired | 341 | Coal | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Louis Doc Bonin utility owner | Lafayette Utilities System | LA | retired | 341 | Gas | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Alle-Catt Wind Energy LLC under construction, over half done | Invenergy Services LLC | NY | planned | 340 | Wind | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Beaver Creek Wind utility owner | MidAmerican Energy Co | IA | operating | 340 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | BMP Wind (TX) independent owner | BMP Wind LLC | TX | operating | 340 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bull Shoals utility owner | USCE-Little Rock District | AR | operating | 340 | Hydro | 1952 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Georgetown utility owner | AES Indiana | IN | operating | 340 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | North English utility owner | MidAmerican Energy Co | IA | operating | 340 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.