Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 86 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Data center | Albany (North Pearl Street) 11 N Pearl St 12207 Albany USA | FirstLight | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Albany Data Center 194 Washington Ave 12210 Albany United States | Magna5 | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Albuquerque 3830 Singer Blvd NE 87109 Albuquerque United States | Pacific Office Auromation | NE (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Albuquerque 5700 W University Blvd SE #310 NM 87106 Albuquerque United States | NOVA Corporation | NM (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | ALEXANDRIA TECHNOLOGY CENTER | QTS | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aligned Ashburn IAD 01 | Aligned | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aligned Ashburn IAD 02 | Aligned | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aligned Ashburn IAD 03 | Aligned | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aligned Dallas DFW01-02 | Aligned | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aligned Dallas DFW03 | Aligned | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aligned Dallas DFW04 | Aligned | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aligned Data Centers: CMH-02 Conesville Industrial Park | Aligned | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aligned Data Centers: NEO-01 | Aligned | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aligned Hillsboro PDX-01 | Aligned | OR (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aligned Hillsboro PDX-02 | Aligned | OR (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aligned ORD-01 Data Center | Aligned | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aligned ORD-02 Data Center | Aligned | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aligned Phoenix PHX 01/02/03 | Aligned | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aligned Phoenix PHX 05 | Aligned | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aligned Phoenix PHX 06 | Aligned | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aligned Quantum Frederick campus | Aligned | MD (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aligned Salt Lake SLC 01 | Aligned | UT (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aligned Salt Lake SLC 02 | Aligned | UT (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aligned Salt Lake SLC 03 | Aligned | UT (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aligned Salt Lake SLC 04 | Aligned | UT (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aligned Shippingport Data Center | Aligned | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Allentown-TekPark 9999 Hamilton Blvd, Building #4 18031 Breinigsville USA | TierPoint | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Alligned Data Centers (Balls Ford) | PROPCO LLC | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | AlohaNAP 91-340 Farrington Hwy 96707 Kapolei USA | fifteenfortyseven Critical Systems Realty (1547) | HI (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | AlohaNAP 91-340 Farrington Hwy 96707 Kapolei USA | fifteenfortyseven Critical Systems Realty (1547) | HI (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Alpha Technologies Huntington Data Center | Alpha Technologies | WV (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Alpharetta (Westside Parkway) 2525 Westside Pkwy 30004 Alpharetta USA | Hewlett Packard (HP) | GA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Alpharetta Data Center 11650 Great Oaks Way GA 30005 Alpharetta United States | Sungard | GA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Alpharetta Data Center 3 11650 Great Oaks Way 30022-2418 Alpharetta USA | Carter Validus Mission Critical REIT | GA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Alpharetta Data Center II 1650 Union Hill Rd 30005 Alpharetta USA | Alpharetta DC | GA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Alterra Marshall Technology Center | Alterra Development | MI (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Altoona 100 Share Way NW 50009 Altoona USA | IA (city-level) | existing or reported | — | — | — | ATLAS data center map | |
| Data center | Altoona Data Center | Meta | IA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Alviso-Milpitas San Jose Campus | Microsoft | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Amazon ATL 15 | Digital Realty | GA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Amazon ATL 16 | Digital Realty | GA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Amazon Bristow Data Center | Amazon | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Amazon Falls Data Center | Amazon | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Amazon Gilroy Data Center | Amazon | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Amazon Lamar County Data Center | Amazon | GA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Amazon Project Cosmos. | Amazon | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Amazon Project Galaxy | Amazon | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Amazon Web Services Mallory | Amazon | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Amazon: PDX80 | Amazon | OR (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Amazon/Stack Louisiana Data Center Campus | Stack Infrastructure | LA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ameresco NAS Lemoore Data Center | CyrusOne | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | American Tower Data Center - Highway 90 | American Tower | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | American Tower Indianapolis Data Center | American Tower | IN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Amhurst 191 Park Club Ln 14221 Amhurst United States | M&T Bank | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Anaheim 2463 W La Palma Ave 92801-2680 Anaheim USA | Aecero | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Anaheim (South Harbor Boulevard) 300 S Harbor Blvd., Suite 510 92805 Anaheim United States | Cogent Communications Inc. | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Andover 400 Minuteman Rd, MA 01810 Andover United States | Navisite | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Andover Data Center 2 400 Minuteman Rd 01810 Andover USA | Carter Validus Mission Critical REIT | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ann Arbor 1 (Avis Drive) 640 Avis Dr 48108 Ann Arbor USA | Online Tech | MI (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ann Arbor 2 (Data Court) 5430 Data Court, Suite 300 48108 Ann Arbor United States | Online Tech | MI (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Antelope Data Center | Pronghorn Development LLP | UT (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Anthropic New York Data Center | Anthropic / Fluidstack | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Apple Mesa Global Data Command Center | Apple | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Apple NC Campus | Apple | NC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Appliance Park Appliance Park Loop 40218 Louisville USA | GE (General Electric Company) | KY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Applied Digital Adair Data Center | Applied Digital | IA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Applied Digital SD Campus | Applied Digital | SD (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Arapahoe 12500 East Arapahoe Road 80112 Centennial United States | Flexential | CO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Arbinet 75 Broad St 75 Broad St. 20th Floor 10004 New York United States | Arbinet | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Archbald Lackawanna Data Center | Archbald I | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Archer: Dallas Campus | Archer Datacenters | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Archer: Minneapolis Campus | Archer Datacenters | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Arcola Pacific Campus | PowerHouse | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | AREP Powerhouse Las Colinas | American Real Estate Partners | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Arizona 4010 N 3rd Str AZ 85012 Phoenix United States | Ebay | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Arizona Data Centers 1534 West Knudsen 85383 Phoenix United States | Arizona Data Centers | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | ARK Data Center 600 SW 3rd Street - Suite 2170 33060 Pompano Beach United States | Ark Datacenters | FL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Arlington Data Center | D.R. Horton | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Asburn 1 44664 Guilford Dr 20147-6042 Ashburn USA | RagingWire | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ascent Data 90 Beta Drive 15238 Pittsburgh United States | Ascent Data | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | ASH1 | Cologix | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ashburn tbc VA Ashburn United States | WiredRe | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ashburn 11730 Plaza America Dr 20190 Ashburn United States | Dimension Data | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ashburn 21263 Smith Switch Rd 20147 Ashburn USA | Amazon | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ashburn 21800 Beaumeade Cir 20147-6201 Ashburn USA | H5 Data Center | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ashburn 22271 Broderick Dr 20166 Sterling USA | Quality Technology Services (QTS) | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ashburn 22080 Pacific Blvd 20166-9304 Sterling USA | Infomart | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ashburn 21571 Beaumeade Cir 20147-6011 Ashburn USA | Brookfield Infrastructure Partners LP | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ashburn 1 21721 Filigree Ct 20147-6207 Ashburn USA | Zenlayer | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ashburn 2 5870 Trinity Pkwy 20120 Ashburn United States | Dimension Data | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ashburn 2 44610 Guilford Dr 20147 Ashburn USA | RagingWire | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ashburn 2 21691 Filigree Ct 20147-6211 Ashburn USA | Zenlayer | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ashburn 3 44245 Waxpool Rd 20147 Ashburn USA | RagingWire | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ashburn Campus Data Center: IAD1 | DataBank | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ashburn Campus Data Center: IAD3 | DataBank | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ashburn Campus Data Center: IAD4 | DataBank | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ashburn Data Center Campus VA1 | Vantage Data Centers | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ashburn Data Center Campus VA2 | Vantage Data Centers | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Ashburn Data Center Campus VA3 | Vantage Data Centers | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Asheville 100 Technology Dr, Suite C 28803-5009 Asheville USA | Immedion | NC (city-level) | existing or reported | — | — | — | ATLAS data center map |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.