Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 85 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Data center | 55 Middlesex Turnpike 55 Middlesex Turnpike MA 01730 Bedford United States | Digital Realty Trust | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 56 Marietta Street 56 Marietta St NW 30303 Atlanta USA | Digital Realty Trust | GA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 587 McDonnell Blvd. 587 McDonnell Blvd. MO 63042 Hazelwood United States | Cyxtera | MO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 5C Data Centers PHX01 | 5C Data Centers | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 5MW Temple Data Center | Oppidan | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 60 Hudson Street 60 Hudson St, Floor 5 10013 New York USA | Digital Realty Trust | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 60 Hudson Street (JFK12) 60 Hudson Street | Digital Realty | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 600 Albany Post Road 600 Albany Post Rd 10510-2427 Briarcliff Manor USA | Lincoln Rackhouse | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 600 S Federal St. 600 S Federal St 60605 Chicago USA | Zayo Group LLC | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 600 Winter St 600 Winter St MA 02451 Boston United States | Digital Realty Trust | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 611 Folsom St. 611 Folsom St 94107-1304 San Francisco USA | Brookfield Infrastructure Partners LP | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 615 N 48th St 615 N 48th St 85008-6608 Phoenix USA | Cyxtera | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 6200 Technology Blvd | Meta | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 650 Townsend St 650 Townsend st CA 94013 San Francisco United States | Virtustream | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 6606 LBJ Fwy 6606 Lyndon B Johnson Fwy 75240 Dallas USA | Zayo Group LLC | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 6715 Pinecrest Drive 6715 Pinecrest Dr 75024 Plano USA | Lincoln Rackhouse | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 6900 S Peoria St 6900 S Peoria St 80112-4137 Centennial USA | Zayo Group LLC | CO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 700 Austin Ave 700 Austin Ave 76701-2020 Waco USA | Zayo Group LLC | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 701 East Trade Street 701 E Trade St 28202 Charlotte USA | Lincoln Rackhouse | NC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 701 Technology Blvd | Meta | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 701 Union Boulevard (EWR15) 701 Union Blvd | Digital Realty | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 701-703 S Lasalle St. 701 S Lasalle St. 60605 Chicago United States | Vinakom | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 703 Union Boulevard (EWR16) 703 Union Blvd | Digital Realty | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 707 Wilshire Blvd. 707 Wilshire Blvd 90017 Los Angeles USA | Zayo Group LLC | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 710 Tucker St Louis 710 North Tucker 63101 St. Louis United States | Hostirian | MO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 717 Leonard Street Leonard St 717 75201 Dallas United States | Digital Realty Trust | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 717 North Harwood Street 717 N Harwood St 75201 Dallas USA | Crown Castle | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 717 South Wells 717 S Wells St 60607 Chicago USA | Netrality | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 7185 Pollock Drive 7185 Pollock Dr 89119-4415 Las Vegas USA | Zayo Group LLC | NV (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 720 Second Street 720 Second Street 94607 Oakland United States | Digital Realty Trust | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 7218 McNeil Drive 7218 McNeil Dr 78729-7617 Austin USA | Zayo Group LLC | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 725 S. Wells Street, Chicago 725 S. Wells St., 8th Floor 60607 Chicago United States | Steadfast Networks | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 731 E Trade St 731 E Trade St NC 28202 Charlotte United States | Digital Realty Trust | NC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 7337 Trade Street 7337 Trade St 92121 San Diego USA | Mapletree Redwood Data Centre Trust (MRDCT) | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 739 Welch Drive 739 Welch Drive 97501 Medford United States | Data Center West | OR (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 7401 E. Ben White Boulevard E Ben White Blvd 7401 78744 Austin United States | Digital Realty Trust | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 75 Broad Street 75 Broad Street | JEMB Realty Inc. | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 75 South Data Center Campus | Industrial VI Enterprises / Hillwood | GA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 7500 Metro Center Dr 7500 Metro Center Dr 78704 Austin United States | Digital Realty Trust | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 7505 John W. Carpenter Freeway 7505 John W. Carpenter Freeway TX 75247 Dallas United States | CoreSpace | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 7505 Mason King Court 7505 Mason King Court 20109 Manassas United States | Digital Realty Trust | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 7579 W 103rd Ave 7579 W 103rd Ave 80021-4071 Westminster USA | Zayo Group LLC | CO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 760 Doug Davis Dr Doug Davis Dr 760 30354 Atlanta United States | Digital Realty Trust | GA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 7620 Appling Center Dr 7620 Appling Center Drive 38133 Memphis United States | Zayo Group LLC | TN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 7620 Metro Center Drive 7620 Metro Center Drive 78704 Austin United States | Digital Realty Trust | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 7th St. West 7th Street 229 45202 Cincinnati United States | CyrusOne | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 80 Merritt Blvd 80 Merritt Blvd 06611-5436 Trumbull USA | Digital Realty Trust | CT (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 800 E Business Center Dr. 800 E Business Center Dr 60056-2178 Mt Prospect USA | Zayo Group LLC | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 800 South Hope 800 South Hope Street 90017 Los Angeles United States | Thomas Properties Group | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 801 Main Street NW 801 Main Street NW NC 28645 Lenoir United States | Dacentec | NC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 8029 Corporate Drive 8029 Corporate Dr 21236 Nottingham USA | Lincoln Rackhouse | MD (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 8100 Boone Boulevard 8100 Boone Boulevard 22182 Vienna United States | Digital Realty Trust | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 811 10th Ave 811 10th Avenue 10019 New York United States | Brookfield Infrastructure Partners LP | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 8180 Green Meadows Dr 8180 Green Meadows Dr N 43035-9605 Lewis Center USA | Cyxtera | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 8201 E. Riverside Drive, Building 4-6 E Riverside Dr 8201, Building 4-6 78744 Austin United States | Digital Realty Trust | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 8217 Linton Hall Road 8217 Linton Hall Rd 20155 Gainesville USA | Digital Realty Trust | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 840 S Canal St 840 Canal St 60607 Chicago USA | Zayo Group LLC | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 840 South Canal Street 840 South Canal Street IL 60607 Chicago United States | Red Sea Group | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 8435 N. Stemmons Freeway N Stemmons Fwy 8435 75247 Dallas United States | Digital Realty Trust | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 850 E. Collins Blvd 850 E. Collins Blvd TX 75081 Richardson United States | Digital Realty Trust | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 8521 E Princess Dr 8521 E Princess Dr 85255 Scottsdale USA | Cyxtera | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 8534 Concord Center Dr 8534 Concord Center Dr CO 80112 Englewood United States | Digital Realty Trust | CO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 8600 Harry Hines Blvd. 8600 Harry Hines Blvd 75235-3015 Dallas USA | Zayo Group LLC | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 8619 Westwood Center Drive 8619 Westwood Center Drive VA 22182 Vienna United States | Virtustream | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 900 Quality Way 900 Quality Way TX 75081 Richardson United States | Digital Realty Trust | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 900 Walnut 900 Walnut St 63102 St. Louis USA | Netrality | MO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 9001 Hornbaker Rd | MJV ASSOCIATES LLC | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 904 Quality Way 904 Quality Way TX 75081 Richardson United States | Digital Realty Trust | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 907 Security Row Security Row 907 75081 Richardson United States | Digital Realty Trust | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 908 Quality Way 908 Quality Way TX 75081 Richardson United States | Digital Realty Trust | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 910Telecom 910 15th St. CO 80202 Denver United States | 910Telecom | CO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 9110 Commerce Center Circle Commerce Center Cir 9110 80129 Littleton United States | Cyxtera | CO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 9180 Commerce Center Circle Commerce Center Cir 9180 80129 Littleton United States | Cyxtera | CO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 9310 Florida Palm Dr 9310 Florida Palm Dr 33619 Tampa USA | Cyxtera | FL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 9333, 9355 & 9377 Grand Ave. 9333, 9355 & 9377 Grand Ave. IL 60131 Franklin Park United States | Digital Realty Trust | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 950 E. Collins Blvd 950 E. Collins Blvd TX 75081 Richardson United States | Digital Realty Trust | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 9606 Aero Drive 9606 Aero Drive CA 92123 San Diego United States | redIT | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 9606 Aero Drive 9606 Aero Dr 92123 San Diego USA | Zayo Group LLC | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 9706 E. Easter Avenue 9706 E. Easter Avenue 80112 Englewood United States | Unknown | CO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Abernathy Data Center (Fluidstack / Anthropic) | TeraWulf | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Abilene 1049 N 3rd St 79601 Abilene USA | Tolar Systems | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Abilene Stargate Campus - Phase 1 | Crusoe | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Abilene Stargate Campus - Phase 2 | Crusoe | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | ABTEEN VENTURES LLC (CloudHQ) | ABTEEN VENTURES LLC (CloudHQ) | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | ACC4 Digital Realty | GRIZZLY VENTURES LLC | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | ACC5 ACC6 Digital Realty | FOX PROPERTIES LLC | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | ACC7 Digital Realty | ALSHAIN VENTURES LLC | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Accokeek Center | A.I., INC | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | ACD.net MetroIX 1800 N Grand River Ave 48906 Lansing United States | ACD.net | MI (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | AcroNOC INC 1415 Louisiana St 77002 Houston United States | AcroNOC | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | ACS Fort Worth | ACS DC Hicks Field Road | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Adams Fork Harless Data Center Energy Campus | TransGas Development LLC | WV (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Advance2000 1140 Wehrle Drive 14221 Williamsville United States | Advance2000 | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Aiken Data Center | Meta | SC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Airport Gateway Commerce Center | UNICORN INTERESTS LLC, PCL F1 | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | AirWorld Technology Center 10828 NW AirWorld Drive 64153 Kansas City United States | Layered Technologies, Inc. | MO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | AirWorld Technology Center 10828 NW AirWorld Drive 64153 Kansas City United States | Layered Technologies, Inc. | MO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | AISO Solar Powered Data Center 25655 Louisa Lane 92585 Romoland United States | Aiso | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Akron P.O. Box 2133 OH 44309 Akron United States | Involta | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Albany (Airline Drive) 10 Airline Dr 12205 Albany USA | CenturyLink | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.