Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 83 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Data center | 121 Varick St 121 Varick St | 121 Varick Street Corp. | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1210 Integrity Drive 1210 Integrity Dr 75081 Richardson USA | Digital Realty Trust | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1215 Integrity Drive 1215 Integrity Dr 75081 Richardson USA | Digital Realty Trust | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1221 Coit Road 1221 Coit Rd 75075-7761 Plano USA | Mapletree Redwood Data Centre Trust (MRDCT) | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 12270 World Trade Drive 12270 World Trade Dr 92128-3765 San Diego USA | Zayo Group LLC | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 12270 World Trade Drive 12270 World Trade Drive San Diego United States | redIT | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1232 Alma Road 1232 Alma Road TX 75081 Richardson United States | Digital Realty Trust | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 125 North Myers Street 125 North Myers Street NC 28202 Charlotte United States | Digital Realty Trust | NC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 128 First Ave 128 1st Ave 02494 Needham USA | Digital Realty Trust | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1300 Federal Boulevard 1300 Federal Boulevard NJ Carteret United States | Goldman Sachs | NJ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1301 Fannin 1301 Fannin St 77002 Houston USA | Netrality | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1304 SQUIRE CT | ELECTRIC BUILDING LLC | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1320 Kifer Rd 1320 Kifer Rd 94086 Sunnyvale USA | Cyxtera | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1331 E Business Center Dr. 1331 E Business Center Dr. 60056 Chicago United States | Unclaimed | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1350 Duane Avenue 1350 Duane Avenue 95054 Santa Clara United States | Digital Realty Trust | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1400 Federal Boulevard 1400 Federal Boulevard NJ Carteret United States | NASDAQ | NJ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1400 Kifer Rd 1400 Kifer Rd 94086-5306 Sunnyvale USA | Cyxtera | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1420 E Devon Ave 1420 E Devon Ave 60007 Elk Grove Village USA | Digital Realty Trust | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 14520 NE 87th St 14520 NE 87th St WA 98052 Redmond United States | Griffin Capital Net Lease REIT | NE (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 14901 FAA Blvd. 14901 FAA Blvd. TX 76155 Fort Worth United States | Cyxtera | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 14901 FAA Blvd., Building 2 14901 FAA Blvd., Building 2 TX 76155 Fort Worth United States | Cyxtera | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1500 Champa Street 1500 Champa Street CO 80202 Denver United States | Zayo Group LLC | CO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1500 Towerview Road 1500 Towerview Road MN 55121 Eagan United States | Digital Realty Trust | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1506 Moran Road 1506 Moran Rd 20166-9306 Sterling USA | Digital Realty Trust | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1525 Comstock Street 1525 Comstock Street 95054 Santa Clara United States | Digital Realty Trust | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1525 Rockwell Ave 1525 Rockwell Ave. 44114 Cleveland United States | Zayo Group LLC | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1623 Farnam 1623 Farnam Rd. 68102 Omaha United States | Nebraska Data Centers | NE (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 165 Halsey 165 Halsey St 07102 Newark United States | Zayo Group LLC | NJ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 165 Halsey Meet-Me Room 165 Halsey St, 9th floor meet-me room 07102-2834 Newark United States | Tishman Real Estate Services | NJ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 17201 Waterview Pkwy 17201 Waterview Pkwy 75252 Dallas USA | Digital Realty Trust | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 17222 Von Karman Ave 17222 Von Karman Ave 92614-6202 Irvine USA | Zayo Group LLC | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1725 Comstock Street 1725 Comstock Street 95054 Santa Clara United States | Digital Realty Trust | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 17400 Von Karman Ave 17400 Von Karman Ave 92614-6206 Irvine USA | Zayo Group LLC | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1780 Business Center Drive 1780 Business Center Dr 20190-5318 Reston USA | Digital Realty Trust | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 17836 Gilette Avenue 17836 Gilette Avenue CA 92614 Irvine United States | Cyxtera | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 180 E Broad Street (Continental Plaza Building) 180 E Broad Street 43215 Columbus United States | Continental Realty | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 180 Peachtree 180 Peachtree St NW 30303 Atlanta USA | Mapletree Redwood Data Centre Trust (MRDCT) | GA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1805 Center Park Drive 1805 Center Park Dr 28217-2900 Charlotte USA | Mapletree Redwood Data Centre Trust (MRDCT) | NC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1808 Swift Dr. 1808 Swift Dr 60523 Oak Brook USA | Zayo Group LLC | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 190 Park Center Plaza San Jose 190 Park Center Plaza 95113 San Jose United States | Telepacific | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1900 S. Price Road S Price Rd 1900 85286 Chandler United States | Digital Realty Trust | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1918 Wake Forest Rd 1918 Wake Forest Rd 27606 Raleigh United States | CenturyLink | NC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1919 w Lone Cactus Dr 1919 w Lone Cactus Dr 85027 Phoenix United States | CyberTrails | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 19508 Freedom Trail Road | JK Land Holdings | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 19675 W Ten Mile Road 19675 W 10 Mile Rd 48075 Southfield USA | Mapletree Redwood Data Centre Trust (MRDCT) | MI (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 1977 Saturn Data Center | HMC Capital | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 2 Christie Heights 2 Christie Heights St 07605 Leonia USA | Mapletree Redwood Data Centre Trust (MRDCT) | NJ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 2 Peekay Drive Peekay Dr 2 07014 Clifton United States | Digital Realty Trust | NJ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 2 Peekay Drive 2 Peekay Dr 07014 Clifton USA | CBRE | NJ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 200 N. LaSalle 200 N LaSalle St 60601 Chicago United States | CenturyLink | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 200 North Nash Street 200 North Nash Street CA 90245 El Segundo United States | Digital Realty Trust | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 200 Paul Avenue 1-4 200 Paul Avenue 1-4 94110 San Francisco United States | Digital Realty Trust | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 200 South 10th Street 200 South 10th Street 78501 McAllen United States | CBRE | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 200 Technology Center 200 SE 1st Street 33131 Miami United States | Transwestern | FL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 2000 Kubach Road 2000 Kubach Rd 19116 Philadelphia USA | Mapletree Redwood Data Centre Trust (MRDCT) | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 2001 Sixth Avenue 2001 Sixth Avenue 98121 Seattle United States | Digital Realty Trust | WA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 2010 East Centennial Circle 2010 East Centennial Circle 85280 Tempe United States | Digital Realty Trust | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 2020 Live Oak 2020 Live Oak 75201 Dallas United States | MCFMAX | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 2045 & 2055 LaFayette Street 2045 & 2055 LaFayette Street 90210 Santa Clara United States | Digital Realty Trust | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 2055 E Technology Circle 2055 E Technology Circle 85284 Tempe United States | Digital Realty Trust | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 209 10th Ave South 209 10th Ave South 37203 Nashville United States | Zayo Group LLC | TN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 210 Hudson Street 210 Hudson St, Suite 802 07302 Jersey City United States | Cyxtera | NJ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 210 N. Tucker Blvd 210 N. Tucker Blvd., Suite 700 63101 St. Louis United States | Cybercon | MO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 210 North Tucker 210 N Tucker Blvd 63101 St. Louis USA | Netrality | MO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 21110 Ridgetop Circle 21110 Ridgetop Circle VA Sterling United States | Digital Realty Trust | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 2121 S. Price Road 2121 S. Price Road AZ 85286 Chandler United States | Digital Realty Trust | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 21310 BEAUMEADE CIR | BEAUMEADE DC BUILDING LLC | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 21320 BEAUMEADE CIR | BEAUMEADE DC BUILDING LLC | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 21455 Beaumeade Circle | Equinix | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 21551 Beaumeade Cir 21551 Beaumeade Cir 20147 Ashburn United States | Digital Realty Trust | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 21561-21571 Beaumeade Cir 21561-21571 Beaumeade Cir 20147 Ashburn United States | Digital Realty Trust | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 216 West Jackson Boulevard 216 West Jackson Boulevard 60606 Chicago United States | ANET Internet Solutions | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 21625 Gresham Drive 21625 Gresham Dr 20147 Ashburn USA | Digital Realty Trust | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 21635 Red Rum Dr 21635 Red Rum Dr 20147 Ashburn USA | Zayo Group LLC | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 21641 CHARLES VIEW DR | Amazon | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 21745 Sir Timothy Drive 21745 Sir Timothy Drive 20147 Ashburn USA | Digital Realty Trust | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 21955 LOUDOUN COUNTY PKWY | CloudHQ | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 2200 Busse Road 2200 Busse Rd 60007-6020 Elk Grove Village USA | Digital Realty Trust | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 22165 BEAUMEADE CIR | Equinix | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 2220 De La Cruz Boulevard 2220 De La Cruz Blvd 95050 Santa Clara USA | Digital Realty Trust | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 22350 KIPPER DR AWS | Amazon | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 22370 KIPPER DR AWS | Amazon | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 2260 East El Segundo Blvd 2260 East El Segundo Boulevard 90245 El Segundo United States | Digital Realty Trust | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 22660 Executive Dr Prologis | Prologis | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 22810 International Dr 22810 International Dr 20166 Sterling USA | Cyxtera | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 22860 International Drive 22860 International Drive VA 20166 Sterling United States | Cyxtera | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 22945 INTERNATIONAL DR AWS | Amazon | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 2299 Busse Road 2299 Busse Rd 60007 Elk Grove Village USA | Digital Realty Trust | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 22995 Wilder Court 22995 Wilder Court VA 20166 Sterling United States | Cyxtera | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 23005 INTERNATIONAL DR | DULLES NCP II LLC | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 2323 Bryan Street 2323 Bryan Street TX 75201 Dallas United States | Digital Realty Trust | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 2401 Holly Kansas City 2401 Holly St 64108 Kansas City United States | Wholesale Internet, Inc. | MO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 24244 QUAIL RIDGE LN | Amazon | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 2440 Marsh Lane 2440 Marsh Lane TX 75006 Carrollton United States | Digital Realty Trust | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 250 Williams Atlanta Data Center 250 Williams St NW 30303 Atlanta USA | Carter Validus Mission Critical REIT | GA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 250 Williams Street NW Williams St NW 250 30303 Atlanta United States | Digital Realty Trust | GA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 251 Exchange Place 251 Exchange Pl 20170-4822 Herndon USA | Lincoln Rackhouse | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 2701 Devils Glen Road 2701 Devils Glen Road 52722 Bettendorf United States | ColoHub LLC | IA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 274 Brannan Street 274 Brannan Street 94107 San Francisco United States | The Swig Company | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | 2775 Northwoods Parkway 2775 Northwoods Pkwy 30071-1533 Norcross USA | Mapletree Redwood Data Centre Trust (MRDCT) | GA (city-level) | existing or reported | — | — | — | ATLAS data center map |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.