Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 65 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Vestaburg utility owner | Wolverine Power Supply Coop | MI | operating | 24 | Gas | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wamego utility owner | City of Wamego - (KS) | KS | operating | 24 | Gas | 1956 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wellington 1 utility owner | City of Wellington - (KS) | KS | operating | 24 | Gas | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wind Park Bear Creek independent owner | Leeward Asset Management, LLC | PA | operating | 24 | Wind | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Adams Wind Farm independent owner | Justin McNeilus | MN | operating | 23 | Wind | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Allendale Biomass independent owner | Allendale Biomass LLC | SC | operating | 23 | Other | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Barber Creek utility owner | Basin Electric Power Coop | WY | operating | 23 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Boott Hydropower independent owner | Boott Hydro, LLC - Hybrid | MA | operating | 23 | Hydro | 1985 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Buena Vista Biomass Power independent owner | Buena Vista Biomass LLC | CA | operating | 23 | Other | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Calverton Solar Energy Center independent owner | LI Solar Generation, LLC | NY | operating | 23 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Camp Reed independent owner | Idaho Wind Partners 1 LLC | ID | operating | 23 | Wind | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Canton Mountain Wind independent owner | CPV Canton Mountain Wind LLC | ME | operating | 23 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cold Springs Windfarm independent owner | Mountain Air Projects, LLC | ID | operating | 23 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crisp Plant utility owner | Crisp County Power Comm | GA | operating | 23 | Gas | 1957 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | DD Fayetteville Solar NC LLC utility owner | Duke Energy Progress - (NC) | NC | operating | 23 | Solar | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Delta Power utility owner | Golden Valley Elec Assn Inc | AK | operating | 23 | Oil | 1976 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Desert Meadow Windfarm independent owner | Mountain Air Projects, LLC | ID | operating | 23 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dorchester Biomass independent owner | Dorchester Biomass LLC | SC | operating | 23 | Other | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | East Nash PV2 independent owner | Pine Gate Renewables | NC | operating | 23 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Electron independent owner | Electron Hydro LLC | WA | operating | 23 | Hydro | 1904 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | English Creek Solar utility owner | Tampa Electric Co | FL | operating | 23 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ewington Energy Systems, LLC independent owner | Ewington Energy Systems, LLC | MN | operating | 23 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gem State utility owner | City of Idaho Falls - (ID) | ID | operating | 23 | Hydro | 1988 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gladstone utility owner | Upper Peninsula Power Company | MI | operating | 23 | Oil | 1975 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hammett Hill Windfarm independent owner | Mountain Air Projects, LLC | ID | operating | 23 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hartzog utility owner | Basin Electric Power Coop | WY | operating | 23 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Imperial Valley Solar Company 1 LLC utility owner | Imperial Irrigation District | CA | operating | 23 | Solar | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Johnson 2 utility owner | Central Nebraska Pub P&I Dist | NE | operating | 23 | Hydro | 1941 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kerckhoff utility owner | Pacific Gas & Electric Co. | CA | operating | 23 | Hydro | 1920 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Koda Biomass Plant independent owner | Koda Energy LLC | MN | operating | 23 | Other | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lederle Laboratories independent owner | Veolia NA - Municipal & Commercial Business | NY | operating | 23 | Gas | 1990 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mainline Windfarm independent owner | Mountain Air Projects, LLC | ID | operating | 23 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Middlesex County Utilities Authority independent owner | Middlesex County Utilities Authority - (NJ) | NJ | operating | 23 | Other | 1961 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Miles City GT utility owner | Montana-Dakota Utilities Co | MT | operating | 23 | Gas | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mosinee Mill independent owner | Ahlstrom-Munksjo NA Specialty Solutions, LLC | WI | operating | 23 | Other | 1916 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | New York Presbyterian Hospital- 68th Street independent owner | NY - PRESBYTERIAN HOSPITAL- 68TH ST | NY | operating | 23 | Oil | 1997 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ocoee 2 utility owner | Tennessee Valley Authority | TN | operating | 23 | Hydro | 1913 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Power County Wind Park North independent owner | Power County Wind Park North LLC | ID | operating | 23 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Power County Wind Park South independent owner | Power County Wind Park South LLC | ID | operating | 23 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rawhide Prairie Solar Hybrid independent owner | Greenbacker Renewable Energy Corporation | CO | operating | 23 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Red Wing utility owner | Northern States Power Co - Minnesota | MN | operating | 23 | Other | 1949 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ryegrass Windfarm independent owner | Mountain Air Projects, LLC | ID | operating | 23 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Speedway Solar NC, LLC independent owner | Deriva Energy | NC | operating | 23 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | St Croix Falls utility owner | Northern States Power Co - Minnesota | WI | operating | 23 | Hydro | 1910 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Stony Knoll Solar, LLC independent owner | Deriva Energy | NC | operating | 23 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sunshine Gas Producers independent owner | Sunshine Gas Producers LLC | CA | operating | 23 | Other | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Swan Lake independent owner | Southeast Alaska Power Agency | AK | operating | 23 | Hydro | 1984 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Two Ponds Windfarm independent owner | Mountain Air Projects, LLC | ID | operating | 23 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tyee Lake Hydroelectric Facility independent owner | Southeast Alaska Power Agency | AK | operating | 23 | Hydro | 1983 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wasson CO2 Removal Plant independent owner | Occidental Permian Ltd | TX | operating | 23 | Gas | 1988 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Yonah utility owner | Georgia Power Co | GA | operating | 23 | Hydro | 1925 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Amana Society Service Company independent owner | Amana Society Service Co | IA | operating | 22 | Oil | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Beaver Dam (PA) independent owner | Beaver Dam Energy LLC | PA | operating | 22 | Gas | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Branford independent owner | Connecticut Jet Power LLC | CT | operating | 22 | Oil | 1967 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bryan (TX) utility owner | City of Bryan - (TX) | TX | operating | 22 | Gas | 1975 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Butler Solar Farm 20 independent owner | Southern Power Co | GA | operating | 22 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Byllesby 2 utility owner | Appalachian Power Co | VA | operating | 22 | Hydro | 1912 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Chippewa Falls utility owner | Northern States Power Co - Minnesota | WI | operating | 22 | Hydro | 1928 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Don Henry utility owner | City of Hastings - (NE) | NE | operating | 22 | Gas | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dutch Flat utility owner | Pacific Gas & Electric Co. | CA | operating | 22 | Hydro | 1943 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dutch Harbor utility owner | City of Unalaska - (AK) | AK | operating | 22 | Oil | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | E J West independent owner | Erie Boulevard Hydropower LP | NY | operating | 22 | Hydro | 1930 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Eight Flags Energy independent owner | Eight Flags Energy LLC | FL | operating | 22 | Gas | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Forest City Light Plant utility owner | City of Forest City- (IA) | IA | operating | 22 | Oil | 1950 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fort Detrick Solar PV independent owner | Montevue Lane Solar, LLC | MD | operating | 22 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Franklin Drive independent owner | Connecticut Jet Power LLC | CT | operating | 22 | Oil | 1968 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gaskell West Storage 1, LLC built, not yet in commercial operation | Matrix Renewables | CA | planned | 22 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | GBG SOLAR built, not yet in commercial operation | Greater Bryant G Solar, LLC | TX | planned | 22 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Geo East Mesa II independent owner | Ormat Nevada Inc | CA | operating | 22 | Other | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Grizzly utility owner | City of Santa Clara - (CA) | CA | operating | 22 | Hydro | 1993 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | High Mesa CO independent owner | AES Clean Energy | CO | operating | 22 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Holton utility owner | City of Holton - (KS) | KS | operating | 22 | Oil | 1958 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Jeffrey utility owner | Central Nebraska Pub P&I Dist | NE | operating | 22 | Hydro | 1941 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | John H Warden independent owner | L'Anse Warden Electric Company LLC | MI | operating | 22 | Other | 1959 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Johnson 1 utility owner | Central Nebraska Pub P&I Dist | NE | operating | 22 | Hydro | 1941 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Litchfield utility owner | Litchfield Public Utilities | MN | operating | 22 | Oil | 1963 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mamm Creek independent owner | AES Clean Energy | CO | operating | 22 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | McKay Bay Facility independent owner | City of Tampa (FL) | FL | operating | 22 | Other | 1985 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mountain View III independent owner | Avangrid Power LLC | CA | operating | 22 | Wind | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nantucket Hybrid utility owner | Nantucket Electric Co | MA | operating | 22 | Oil | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nevada utility owner | Evergy Missouri West | MO | operating | 22 | Oil | 1974 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | O'Brien Solar Fields utility owner | Madison Gas & Electric Co | WI | operating | 22 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Oxbow Creek independent owner | Oxbow Creek Energy LLC | PA | operating | 22 | Gas | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pittsburgh Airport Gas Plant independent owner | IMG Energy Solutions | PA | operating | 22 | Gas | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Powell Valley utility owner | Powell Valley Electric Coop | TN | operating | 22 | Oil | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Roundtop independent owner | Roundtop Energy LLC | PA | operating | 22 | Gas | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ruff Solar LLC independent owner | Sol Systems | NC | operating | 22 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ryegate Associates, LLC independent owner | Ryegate Associates, LLC | VT | operating | 22 | Other | 1992 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sabetha Power Plant utility owner | City of Sabetha - (KS) | KS | operating | 22 | Oil | 1947 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sawtooth Wind Project independent owner | Idaho Winds LLC | ID | operating | 22 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Star Peak Geothermal Plant independent owner | Star Peak Geothermal LLC. | NV | operating | 22 | Other | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Thorpe utility owner | Duke Energy Carolinas, LLC | NC | operating | 22 | Hydro | 1941 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Torrington independent owner | Connecticut Jet Power LLC | CT | operating | 22 | Oil | 1967 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Trenton Falls independent owner | Erie Boulevard Hydropower LP | NY | operating | 22 | Hydro | 1919 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Twin Rivers Paper Co LLC independent owner | Twin Rivers Paper Co LLC | ME | operating | 22 | Other | 1987 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Two Hearted Solar independent owner | Two Hearted Solar, LLC | NC | operating | 22 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Voyager Wind IV independent owner | Terra-Gen Operating Co-Wind | CA | operating | 22 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wayne IC utility owner | City of Wayne (NE) | NE | operating | 22 | Oil | 1947 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | William F Matson Generating Station utility owner | Allegheny Electric Coop Inc | PA | operating | 22 | Hydro | 1988 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wolf Run Energy independent owner | Wolf Run Energy LLC | PA | operating | 22 | Gas | 2019 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.