Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 64 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Steamboat II independent owner | Steamboat Development Corp | NV | operating | 26 | Other | 1992 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Steamboat III independent owner | Steamboat Development Corp | NV | operating | 26 | Other | 1992 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Stetson Wind II independent owner | Evergreen Wind, LLC | ME | operating | 26 | Wind | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Texas City Plant Union Carbide independent owner | Union Carbide Corp-Texas City | TX | operating | 26 | Other | 1996 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TNSG North Plant utility owner | TDX North Slope Generating Inc. | AK | operating | 26 | Gas | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | U S Alliance Coosa Pines independent owner | Bowater Newport Coosa Pines Op | AL | operating | 26 | Other | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | UCONN Cogen Facility independent owner | University of Connecticut | CT | operating | 26 | Gas | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Victory Garden (Tehachapi) independent owner | Wind Stream Operations LLC | CA | operating | 26 | Wind | 1981 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Windhub Solar B, LLC under construction, over half done | Windhub Solar B, LLC | CA | planned | 26 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | 85 B independent owner | Wind Wall 1 LLC | CA | operating | 25 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Adelite Solar, LLC independent owner | Birch Creek Development | MO | operating | 25 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | AES West Oahu Solar Hybrid independent owner | AES Distributed Energy | HI | operating | 25 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Aidlin Geothermal Power Plant independent owner | Geysers Power Co LLC | CA | operating | 25 | Other | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Arbor Hill Solar utility owner | MidAmerican Energy Co | IA | operating | 25 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Arlington Battery Energy Storage System under construction | PUD No 1 of Snohomish County - (WA) | WA | planned | 25 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Avra Valley Solar independent owner | Solar Avra Valley LLC | AZ | operating | 25 | Solar | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Axium Modesto Solar independent owner | Axium US Solar Holdings LLC | CA | operating | 25 | Solar | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Baxley independent owner | SR Baxley, LLC | GA | operating | 25 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Big Timber Wind Farm independent owner | RWE Clean Energy | MT | operating | 25 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Boulder Park utility owner | Avista Corp | WA | operating | 25 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Caprock Solar 1 LLC independent owner | Deriva Energy | NM | operating | 25 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cascade Energy Storage, LLC independent owner | Engie North America | CA | operating | 25 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Centrahoma East utility owner | Peoples Electric Cooperative | OK | operating | 25 | Gas | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Centrahoma West utility owner | Peoples Electric Cooperative | OK | operating | 25 | Gas | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | CF Industries Yazoo City Complex independent owner | CF Industries Nitrogen LLC | MS | operating | 25 | Gas | 1984 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Claude Vandyke utility owner | Wolverine Power Supply Coop | MI | operating | 25 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cove Fort independent owner | Ormat Cove Fort LLC | UT | operating | 25 | Other | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cushing utility owner | City of Cushing - (OK) | OK | operating | 25 | Gas | 1936 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Custer Energy Center utility owner | Manitowoc Public Utilities | WI | operating | 25 | Gas | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | DeSoto Next Generation Solar Energy utility owner | Florida Power & Light Co | FL | operating | 25 | Solar | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dynamo Solar LLC approvals pending | Laketricity USA Inc. | CA | planned | 25 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Eagle Point Energy Center independent owner | Eagle Point Energy Center, LLC | ME | operating | 25 | Other | 1987 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Eva Creek Wind utility owner | Golden Valley Elec Assn Inc | AK | operating | 25 | Wind | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gaston Solar Power Plant utility owner | Duke Energy Carolinas, LLC | NC | operating | 25 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Georgia-Pacific Crossett LLC independent owner | Georgia-Pacific Crossett LLC | AR | operating | 25 | Gas | 1962 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Glenarm BESS Plant approvals pending | Glenarm BESS LLC | CA | planned | 25 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Greenfield Wind - MT independent owner | Greenbacker Renewable Energy Corporation | MT | operating | 25 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hayhurst Texas Solar independent owner | Hayhurst Texas Solar | TX | operating | 25 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Horsepen Branch Solar planned, approvals not started | Horsepen Branch Solar | VA | planned | 25 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Klondike Wind Power independent owner | Avangrid Power LLC | OR | operating | 25 | Wind | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Maple Lake utility owner | Great River Energy | MN | operating | 25 | Oil | 1978 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mechanicsville Solar independent owner | Mechanicsville Solar, LLC | VA | operating | 25 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Midfield Solar, LLC under construction | Headwater Energy, LLC | NC | planned | 25 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mordor ES1 independent owner | Mordor ES1 LLC | CA | operating | 25 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | NE Renewable Tamworth, LLC independent owner | NE Renewable Tamworth, LLC | NH | operating | 25 | Other | 1987 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Neversink utility owner | New York Power Authority | NY | operating | 25 | Hydro | 1953 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | ONeill utility owner | U S Bureau of Reclamation | CA | operating | 25 | Hydro | 1967 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Orangeville Storage independent owner | Invenergy Services LLC | NY | operating | 25 | Battery storage | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Outer Cape Community Battery independent owner | Eversource | MA | operating | 25 | Battery storage | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pacific-Ultrapower Chinese Station independent owner | IHI Power Services Corp | CA | operating | 25 | Other | 1986 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rainbow Falls Hydro independent owner | Erie Boulevard Hydropower LP | NY | operating | 25 | Hydro | 1956 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Red Lion Energy Center independent owner | Diamond State Generation Partners, LLC | DE | operating | 25 | Gas | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ridgewind independent owner | Ridgewind Power Partners LLC | MN | operating | 25 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rock Lake CT utility owner | Great River Energy | MN | operating | 25 | Oil | 1978 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sheldon Springs Hydroelectric independent owner | Central Rivers Power US, LLC | VT | operating | 25 | Hydro | 1988 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Shoreham Solar Commons independent owner | Deriva Energy | NY | operating | 25 | Solar | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sierra Solar approvals received | Sierra Solar LLC | AZ | planned | 25 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Adamsville independent owner | SR Adamsville, LLC | TN | operating | 25 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | St Marys utility owner | City of St Marys - (OH) | OH | operating | 25 | Oil | 1992 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Taconite Ridge 1 Wind Energy Center utility owner | ALLETE, Inc. | MN | operating | 25 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Techren Solar III LLC independent owner | Techren Solar III LLC | NV | operating | 25 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Techren Solar IV LLC independent owner | Techren Solar IV LLC | NV | operating | 25 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | University of Rochester independent owner | University of Rochester | NY | operating | 25 | Gas | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Upton County BESS independent owner | VESI Upton County BESS, LLC | TX | operating | 25 | Battery storage | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Vandenberg Solar Project independent owner | MN8 Energy LLC | CA | operating | 25 | Solar | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Vansycle independent owner | ESI Vansycle Partners LP | OR | operating | 25 | Wind | 1998 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Waverly Municipal Electric North Plant utility owner | Waverly Municipal Elec Utility - (IA) | IA | operating | 25 | Oil | 1958 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | West Ford Flat independent owner | West Ford Flat Energy Storage | CA | operating | 25 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wilmarth utility owner | Northern States Power Co - Minnesota | MN | operating | 25 | Other | 1948 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Winfield utility owner | Appalachian Power Co | WV | operating | 25 | Hydro | 1938 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blossburg independent owner | Blossburg Power, LLC | PA | operating | 24 | Gas | 1971 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blue Ridge utility owner | Tennessee Valley Authority | GA | operating | 24 | Hydro | 1931 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bowerman Power LFG, LLC independent owner | Bowerman Power LFG, LLC | CA | operating | 24 | Other | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | CalPortland Company Mojave Wind independent owner | CalPortland Company | CA | operating | 24 | Wind | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Etiwanda utility owner | Metropolitan Water District of S CA | CA | operating | 24 | Hydro | 1994 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Five Falls independent owner | Erie Boulevard Hydropower LP | NY | operating | 24 | Hydro | 1955 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Harrisburg Facility independent owner | Harrisburg Authority | PA | operating | 24 | Other | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Indiana University of Pennsylvania independent owner | Indiana University of Penn | PA | operating | 24 | Gas | 1988 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Jersey Valley Geothermal Power Plant independent owner | Ormat Nevada Inc | NV | operating | 24 | Other | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kit Carson Co-Op independent owner | Solar DG NM Amalia, LLC | NM | operating | 24 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lake Preston utility owner | Otter Tail Power Co | SD | operating | 24 | Oil | 1978 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lempster Wind LLC independent owner | Avangrid Power LLC | NH | operating | 24 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Maquoketa 1 utility owner | City of Maquoketa - (IA) | IA | operating | 24 | Gas | 1956 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | McMinnville utility owner | McMinnville Electric System | TN | operating | 24 | Oil | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mount Clinton utility owner | City of Harrisonburg - (VA) | VA | operating | 24 | Oil | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | MPW Solar 1 approvals received | MPW Solar 1, LLC | IA | planned | 24 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mt Pleasant utility owner | City of Mt Pleasant - (IA) | IA | operating | 24 | Oil | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Oak Point Cogen independent owner | Chevron Oronite Co LLC | LA | operating | 24 | Gas | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Orchard Park utility owner | Borough of Chambersburg - (PA) | PA | operating | 24 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ormesa II independent owner | Ormat Nevada Inc | CA | operating | 24 | Other | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pardee utility owner | East Bay Municipal Util Dist - (CA) | CA | operating | 24 | Hydro | 1930 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pearl Station utility owner | Prairie Power, Inc | IL | operating | 24 | Oil | 1973 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | PHP 1 utility owner | City of Portland (OR) | OR | operating | 24 | Hydro | 1982 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Plant Four utility owner | City of Marquette - (MI) | MI | operating | 24 | Oil | 1979 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Saint Marys Falls utility owner | USACE-Detroit District | MI | operating | 24 | Hydro | 1932 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Salt Wells independent owner | Ormat Salt Wells LLC | NV | operating | 24 | Other | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Spencer Gas Turbine utility owner | City of Spencer - (IA) | IA | operating | 24 | Oil | 1970 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sullivan (IL) utility owner | City of Sullivan - (IL) | IL | operating | 24 | Oil | 1948 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Twin Falls Hydro independent owner | Central Rivers Power US, LLC | WA | operating | 24 | Hydro | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | University Solar, LLC independent owner | AES Distributed Energy | RI | operating | 24 | Solar | 2019 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.