Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 46 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Strinestown Solar approvals received | Strinestown Solar, LLC | PA | planned | 80 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Syracuse and Tours Renewable Energy approvals received | Vesper Energy Development LLC | CA | planned | 80 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Three Peaks Power independent owner | Onward Energy | UT | operating | 80 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | University of Illinois Abbott Power Plt independent owner | University of Illinois | IL | operating | 80 | Gas | 1940 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Utah Red Hills Renewable Energy Park independent owner | MN8 Energy LLC | UT | operating | 80 | Solar | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Walker Solar under construction | MN8 Energy LLC | PA | planned | 80 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Walker Springs I independent owner | Origis Energy USA, Inc | AL | operating | 80 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Walker Springs II independent owner | Origis Energy USA, Inc | AL | operating | 80 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Walton Bainbridge Power Facility independent owner | Walton Bainbridge LLC | GA | operating | 80 | Oil | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Water Strider Solar independent owner | RWE Clean Energy | VA | operating | 80 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wing independent owner | Origis Energy USA, Inc | AL | operating | 80 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Agency GT utility owner | Interstate Power and Light Co | IA | retired | 79 | Gas | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ames GT utility owner | City of Ames - (IA) | IA | operating | 79 | Oil | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Assembly Solar III independent owner | Assembly Solar III, LLC | MI | operating | 79 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cane Creek independent owner | Cane Creek Solar, LLC | MS | operating | 79 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Citrus Solar Energy Center Hybrid utility owner | Florida Power & Light Co | FL | operating | 79 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Covanta Hempstead independent owner | Covanta Hempstead Company | NY | operating | 79 | Other | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Houma utility owner | Terrebonne Parish Consol Gov't | LA | operating | 79 | Gas | 1967 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Innovative Solar 46 independent owner | Cypress Creek Renewables | NC | operating | 79 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | International Paper Red River Mill independent owner | Red River Mill Intl Paper Company | LA | operating | 79 | Other | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | KCE NY 29, LLC planned, approvals not started | Key Capture Energy | NY | planned | 79 | Battery storage | 2030 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | LaFayette Solar Farm independent owner | Boralex US Operations LLC | AL | operating | 79 | Solar | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lone Tree Wind, LLC independent owner | Leeward Asset Management, LLC | IL | operating | 79 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Moonshot independent owner | Moonshot Solar, LLC | MS | operating | 79 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | New Ulm utility owner | New Ulm Public Utilities Comm | MN | operating | 79 | Oil | 1957 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Paulsboro Refinery independent owner | Paulsboro Refining Company - LLC | NJ | operating | 79 | Gas | 1982 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Phobos Solar, LLC independent owner | Phobos Solar, LLC | NC | operating | 79 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pit 6 utility owner | Pacific Gas & Electric Co. | CA | operating | 79 | Hydro | 1965 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Plant No 2 Freeport utility owner | Village of Freeport - (NY) | NY | operating | 79 | Gas | 1973 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Playa Solar 1, LLC independent owner | EDF Renewable Asset Holdings, Inc. | NV | operating | 79 | Solar | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ralston utility owner | Placer County Water Agency - (CA) | CA | operating | 79 | Hydro | 1966 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ratcliff Solar Park approvals received | Greenalia Solar Power Ratcliff, LLC | TX | planned | 79 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rising Tree Wind Farm independent owner | Rising Tree Wind Farm LLC | CA | operating | 79 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rockland Wind Farm independent owner | Ridgeline Energy LLC | ID | operating | 79 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Steele Flats Wind Project LLC independent owner | Steele Flats Wind Project LLC | NE | operating | 79 | Wind | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Trent River Solar, LLC independent owner | SunStrong Management | NC | operating | 79 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Arkwright Summit Wind Farm LLC independent owner | Arkwright Summit Wind Farm LLC | NY | operating | 78 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Black Oak Wind Farm independent owner | Black Oak Wind, LLC | MN | operating | 78 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Eaton utility owner | Mississippi Power Co | MS | retired | 78 | Gas | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Golden Spread Panhandle Wnd Rch utility owner | Golden Spread Electric Cooperative, Inc | TX | operating | 78 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Granite City Works independent owner | United States Steel Granite City Works | IL | operating | 78 | Other | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hank Nikkels Plant 1 utility owner | Chugach Electric Assn Inc | AK | operating | 78 | Gas | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Jericho Rise Wind Farm LLC independent owner | Jericho Rise Wind Farm LLC | NY | operating | 78 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Longbow Solar, LLC independent owner | Headwater Energy, LLC | TX | operating | 78 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mabelvale utility owner | Entergy Arkansas LLC | AR | retired | 78 | Gas | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Markland utility owner | Duke Energy Indiana, LLC | IN | operating | 78 | Hydro | 1967 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mililani South Solar Farm independent owner | Mililani I Solar LLC | HI | operating | 78 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Montezuma Wind II independent owner | NextEra Energy Montezuma Wind II, LLC | CA | operating | 78 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rocky Forge Wind under construction, over half done | Rocky Forge Wind, LLC | VA | planned | 78 | Wind | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sendero independent owner | Sendero Wind Energy, LLC | TX | operating | 78 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Shiras utility owner | City of Marquette - (MI) | MI | retired | 78 | Coal | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Snettisham utility owner | Alaska Electric Light & Power Co. | AK | operating | 78 | Hydro | 1973 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sonoma California Geothermal independent owner | Geysers Power Co LLC | CA | operating | 78 | Other | 1983 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | US DOE Savannah River Site (D Area) independent owner | Savannah River Nuclear Solutions LLC | SC | retired | 78 | Coal | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Vasco Winds independent owner | Vasco Winds, LLC | CA | operating | 78 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Woodward Mountain II independent owner | Pecos Wind II LP | TX | operating | 78 | Wind | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sherbino II BESS SLF interconnection agreement signed 2024-08; online expected 2027-04; request 26INR0296; financial security poste | — | Pecos Co., TX | planned | 77 | Battery storage | 2027 | ERCOT planned capacity changes |
| Power plant | Eagle Springs Solar interconnection agreement signed 2024-04; online expected 2027-03; request 24INR0137; financial security poste | — | Delta Co., TX | planned | 77 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Abilene Energy Center Combustion Turbine utility owner | Evergy Kansas Central, Inc | KS | retired | 77 | Gas | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Arrowleaf Solar and Storage independent owner | ORNI 30 LLC | CA | operating | 77 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bernice Lake utility owner | Homer Electric Assn Inc | AK | operating | 77 | Gas | 1971 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Clover Creek Solar under construction | Dominion Energy Inc. | VA | planned | 77 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Delaware Generating Station independent owner | Constellation Power, Inc | PA | operating | 77 | Oil | 1969 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Farmington Solar independent owner | Farmington Solar, LLC | ME | operating | 77 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Flint River Operations independent owner | GFC - Flint River Mill | GA | operating | 77 | Other | 1980 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Forked River independent owner | Forked River Power, LLC | NJ | operating | 77 | Gas | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | International Paper Pine Hill Mill independent owner | International Paper Co. | AL | operating | 77 | Other | 1968 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kalamazoo River Generating Station independent owner | CMS Generation MI Power LLC | MI | operating | 77 | Gas | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | McClellan (CA) utility owner | Sacramento Municipal Util Dist | CA | operating | 77 | Gas | 1986 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mojave 16/17/18 BESS independent owner | Terra-Gen Operating Co-BESS 2 | CA | operating | 77 | Battery storage | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pinellas County Resource Recovery independent owner | Reworld Projects, LLC | FL | operating | 77 | Other | 1983 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | White Oak Solar, LLC independent owner | White Oak Solar, LLC | GA | operating | 77 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cabokenze Energy Storage planned, approvals not started | Cabokenze Energy Storage, LLC | GA | planned | 76 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Eytcheson Solar planned, approvals not started | Gransolar Texas Fourteen, LLC | TX | planned | 76 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hannibal Energy Center planned, approvals not started | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | MO | planned | 76 | Gas | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Harris Hydro independent owner | Brookfield White Pine Hydro LLC | ME | operating | 76 | Hydro | 1954 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mendota Hills, LLC independent owner | Leeward Asset Management, LLC | IL | operating | 76 | Wind | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Moline utility owner | MidAmerican Energy Co | IL | operating | 76 | Gas | 1942 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nevada Solar One independent owner | Acciona Solar Power | NV | operating | 76 | Solar | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Robinson Solar Plant approvals pending | Duke Energy Carolinas, LLC | SC | planned | 76 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Smithland Hydroelectric Plant utility owner | American Mun Power-Ohio, Inc | KY | operating | 76 | Hydro | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | AC Ranch I under construction | Lydian Energy | NM | planned | 75 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Allora Solar, LLC independent owner | Allora Solar, LLC | SC | operating | 75 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Alton Post Office Solar independent owner | Urban Grid Solar | VA | operating | 75 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ambersweet under construction | Florida Power & Light Co | FL | planned | 75 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Anhinga Solar Energy Center utility owner | Florida Power & Light Co | FL | operating | 75 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Apalachee utility owner | Florida Power & Light Co | FL | operating | 75 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | B & K Solar under construction, over half done | B & K Solar | SC | planned | 75 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Babcock Preserve utility owner | Florida Power & Light Co | FL | operating | 75 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bailey Mill Solar under construction, over half done | Duke Energy Florida, LLC | FL | planned | 75 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Baldy Mesa 2_Silver Peak Hybrid independent owner | AES Clean Energy | CA | operating | 75 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Barefoot Bay Solar Energy Center utility owner | Florida Power & Light Co | FL | operating | 75 | Solar | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bay Ranch Solar Power Plant utility owner | Duke Energy Florida, LLC | FL | operating | 75 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bay Trail Solar Power Plant utility owner | Duke Energy Florida, LLC | FL | operating | 75 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Beautyberry utility owner | Florida Power & Light Co | FL | operating | 75 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bell Ridge Solar independent owner | Bell Ridge Solar, LLC | FL | operating | 75 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Beulah Solar independent owner | SunStrong Management | SC | operating | 75 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Big Brook utility owner | Florida Power & Light Co | FL | operating | 75 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Big Creek 8 utility owner | Southern California Edison Co | CA | operating | 75 | Hydro | 1921 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Big Juniper Solar utility owner | Florida Power & Light Co | FL | operating | 75 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.