Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 45 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Bulldog Solar LLC independent owner | Bulldog Solar LLC | GA | operating | 80 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Charles City Wind Farm utility owner | MidAmerican Energy Co | IA | operating | 80 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Clover Creek Solar Community Solar independent owner | AES Distributed Energy | UT | operating | 80 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Conetoe II Solar, LLC independent owner | Deriva Energy | NC | operating | 80 | Solar | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Copenhagen Wind Farm independent owner | EDF Renewable Asset Holdings, Inc. | NY | operating | 80 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | CPV Stagecoach Solar independent owner | CPV Stagecoach Solar, LLC | GA | operating | 80 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Decatur Parkway Solar Project, LLC independent owner | Southern Power Co | GA | operating | 80 | Solar | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Delta Solar Plant planned, approvals not started | Entergy Mississippi LLC | LA | planned | 80 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Desert Harvest, LLC independent owner | Desert Harvest, LLC | CA | operating | 80 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Drawhorn Solar approvals pending | Drawhorn Solar, LLC | GA | planned | 80 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | East Atmore Solar independent owner | East Atmore Solar, LLC | AL | operating | 80 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Eastern Shore Solar, LLC independent owner | Dominion Renewable Energy | VA | operating | 80 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Elektron Solar, LLC independent owner | Elektron Solar, LLC | UT | operating | 80 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ellis Solar LLC independent owner | 174 Power Global Corp. | TX | operating | 80 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Enterprise Solar, LLC independent owner | Clearway Renewable Operation & Maintenance LLC | UT | operating | 80 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Enterprise Storage independent owner | Enterprise Storage LLC | UT | operating | 80 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Escalante BESS I independent owner | Escalante BESS I LLC | UT | operating | 80 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Escalante Solar I, LLC independent owner | Clearway Renewable Operation & Maintenance LLC | UT | operating | 80 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Escalante Solar II, LLC independent owner | Clearway Renewable Operation & Maintenance LLC | UT | operating | 80 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Escalante Solar III, LLC independent owner | Clearway Renewable Operation & Maintenance LLC | UT | operating | 80 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fall River Solar, LLC independent owner | Greenbacker Renewable Energy Corporation | SD | operating | 80 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fiddle Leaf Solar, LLC approvals received | Lightsource Renewable Energy Asset Management, LLC | OK | planned | 80 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Foley Solar, LLC built, not yet in commercial operation | Foley Solar, LLC | AL | planned | 80 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fountain Creek Solar utility owner | Dominion Energy Inc. | VA | operating | 80 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Garnet Mesa Solar independent owner | Garnet Mesa Solar LLC | CO | operating | 80 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gauley River Power Partners independent owner | Central Rivers Power WV, LLC | WV | operating | 80 | Hydro | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gaylord - Consumers utility owner | Consumers Energy Co - (MI) | MI | retired | 80 | Gas | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Georgia-Pacific Palatka Operations independent owner | Georgia-Pacific Consr Ops LLC-Palatka | FL | operating | 80 | Other | 1965 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Goose Prairie Solar independent owner | Goose Prairie Solar LLC | WA | operating | 80 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Grand View Solar Two independent owner | Grand View PV Solar Two, LLC | ID | operating | 80 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Granite Mountain BESS East independent owner | Granite Mountain BESS East LLC | UT | operating | 80 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Granite Mountain Solar East, LLC independent owner | Clearway Renewable Operation & Maintenance LLC | UT | operating | 80 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Graphite Solar I independent owner | Greenbacker Renewable Energy Corporation | UT | operating | 80 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Grasshopper Solar utility owner | Dominion Energy Inc. | VA | operating | 80 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Green Peter utility owner | USACE Northwestern Division | OR | operating | 80 | Hydro | 1967 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Greensville County Solar Project, LLC independent owner | Dominion Energy Inc. | VA | operating | 80 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | GSG LLC independent owner | Leeward Asset Management, LLC | IL | operating | 80 | Wind | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gum Swamp Solar, LLC under construction | Headwater Energy, LLC | NC | planned | 80 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gutenberg Solar utility owner | Dominion Energy Inc. | NC | operating | 80 | Solar | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Halifax County Solar under construction | AES Clean Energy | NC | planned | 80 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Harts Mill Solar, LLC independent owner | Harts Mills Solar, LLC | NC | operating | 80 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | High Top Solar approvals received | Cypress Creek Renewables | WA | planned | 80 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hyco Solar LLC approvals pending | Cypress Creek Renewables | NC | planned | 80 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Iron Springs BESS independent owner | Iron Springs BESS, LLC | UT | operating | 80 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Iron Springs Solar, LLC independent owner | Clearway Renewable Operation & Maintenance LLC | UT | operating | 80 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | J B Sims utility owner | City of Grand Haven - (MI) | MI | retired | 80 | Coal | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Jawbone Wind Project under construction | Triple Oak Power LLC | MT | planned | 80 | Wind | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Johanna Energy Center, LLC independent owner | Johanna Energy Center, LLC | CA | operating | 80 | Battery storage | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Karn Solar Energy Center under construction | Consumers Energy Co - (MI) | MI | planned | 80 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lancaster Solar GA independent owner | Lancaster Solar GA, LLC | GA | operating | 80 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Laredo Ridge Wind LLC independent owner | NRG Energy Gas & Wind Holdings Inc | NE | operating | 80 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Llano Estacado Wind Ranch independent owner | Llano Estacado Wind Ranch | TX | operating | 80 | Wind | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lockhart Solar PV IV, LLC independent owner | Terra-Gen Operating Co-Solar | CA | operating | 80 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lorenzo Wind independent owner | Lorenzo Wind, LLC | TX | operating | 80 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Majestic 1 Wind Farm independent owner | NextEra Energy Majestic Wind | TX | operating | 80 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Majestic II Wind independent owner | NextEra Energy Majestic Wind | TX | operating | 80 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Middle Station independent owner | Calpine New Jersey Generation LLC | NJ | retired | 80 | Oil | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Millcreek Power Generation utility owner | City of St George - (UT) | UT | operating | 80 | Gas | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mountain Wind Power II LLC independent owner | Mountain Wind Power II LLC | WY | operating | 80 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | MTSUN independent owner | Greenbacker Renewable Energy Corporation | MT | operating | 80 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mulqueeney Wind Energy under construction, over half done | Mulqueeney Wind Energy LLC | CA | planned | 80 | Wind | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nestlewood Solar independent owner | Nestlewood Solar | OH | operating | 80 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Norfork utility owner | USCE-Little Rock District | AR | operating | 80 | Hydro | 1944 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | North Branch (WV) utility owner | Virginia Electric & Power Co | WV | retired | 80 | Coal | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | North Brawley Geothermal Plant independent owner | Ormat Nevada Inc | CA | operating | 80 | Other | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | North Star Energy Storage, LLC under construction | North Star Energy Storage, LLC | MN | planned | 80 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Northern Iowa Windpower II independent owner | Avangrid Power LLC | IA | operating | 80 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Old Gold Energy Center, LLC independent owner | Old Gold Energy Center, LLC | IA | operating | 80 | Wind | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Old Hayneville Solar, LLC independent owner | Old Hayneville Solar, LLC | AL | operating | 80 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ostrea Solar, LLC independent owner | Cypress Creek Renewables | WA | operating | 80 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pastoria Power Bank independent owner | Pastoria Power, LLC | CA | operating | 80 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pine River Solar Park utility owner | DTE Electric Company | MI | operating | 80 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pineview Solar, LLC independent owner | Pineview Solar, LLC | GA | operating | 80 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Piney Creek Solar utility owner | Dominion Energy Inc. | VA | operating | 80 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pioneer Solar (CO), LLC independent owner | Pioneer Solar (CO), LLC | CO | operating | 80 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pioneer Wind Park, LLC independent owner | AES Distributed Energy | WY | operating | 80 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pit 3 utility owner | Pacific Gas & Electric Co. | CA | operating | 80 | Hydro | 1925 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pocahontas Prairie Wind Farm utility owner | MidAmerican Energy Co | IA | operating | 80 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Porterhouse Wind (4) LLC independent owner | UPC Power Solutions | TX | operating | 80 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Red Bud Solar Plant utility owner | Duke Energy Carolinas, LLC | NC | operating | 80 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Roaring Brook, LLC independent owner | Avangrid Power LLC | NY | operating | 80 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rocket Solar, LLC independent owner | Rocket Solar, LLC | UT | operating | 80 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sac County Wind, LLC independent owner | Sac County Wind | IA | operating | 80 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sagebrush ESS independent owner | Terra-Gen Operating Co-BESS 2 | CA | operating | 80 | Battery storage | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sand Hill C approvals pending | Viracocha Wind LLC | CA | planned | 80 | Wind | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Scotch Grove Solar approvals pending | Cypress Creek Renewables | NC | planned | 80 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Shell Chemical independent owner | Shell Chemical LP - Geismar | LA | operating | 80 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Shirk Energy Storage independent owner | VESI 15 LLC | CA | operating | 80 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Signal Hill Generating LLC independent owner | Signal Hill Generating LLC | TX | operating | 80 | Gas | 1987 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sigurd Solar LLC independent owner | Sigurd Solar LLC | UT | operating | 80 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sleepy Creek Solar, LLC under construction | Headwater Energy, LLC | NC | planned | 80 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | South Davidson approvals pending | Cypress Creek Renewables | NC | planned | 80 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | South Peak Wind independent owner | ALLETE Clean Energy | MT | operating | 80 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Ailey independent owner | SR Ailey, LLC | GA | operating | 80 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Hope Hull approvals received | SR Hope Hull, LLC | AL | planned | 80 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Horus under construction | SR Horus, LLC | KY | planned | 80 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Steel Solar LLC independent owner | Steel Solar, LLC | UT | operating | 80 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Stevens Mill Solar approvals pending | Cypress Creek Renewables | NC | planned | 80 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Stillwater Wind, LLC independent owner | Pattern Operators LP | MT | operating | 80 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Storm Lake II independent owner | ALLETE Clean Energy | IA | operating | 80 | Wind | 1999 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.