Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 42 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Breckinridge Wind Project LLC independent owner | NextEra Energy Resources Breckinridge | OK | operating | 99 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Campbell Hill Windpower independent owner | Deriva Energy | WY | operating | 99 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Central Plains Wind Farm utility owner | Evergy Kansas Central, Inc | KS | operating | 99 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cooks Mill PV I independent owner | Cooks Mill PV I, LLC | IL | operating | 99 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crane Creek Wind Energy Center utility owner | Wisconsin Public Service Corp | IA | operating | 99 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crooked Creek PV I independent owner | Crooked Creek PV I, LLC | IL | operating | 99 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Day County Wind LLC independent owner | Day County Wind LLC | SD | operating | 99 | Wind | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dressor Plains Solar, LLC independent owner | Dressor Plains Solar, LLC | IL | operating | 99 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Edgewater under construction | Wisconsin Power & Light Co | WI | planned | 99 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Electrolyte BESS independent owner | Henrietta BESS LLC | CA | operating | 99 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Elm Creek Wind LLC independent owner | Avangrid Power LLC | MN | operating | 99 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ensign Wind LLC independent owner | NextEra Energy Resources Ensign Wind | KS | operating | 99 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Franklin County Wind Farm utility owner | Interstate Power and Light Co | IA | operating | 99 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Granite Reliable Power independent owner | NexteraEnergy | NH | operating | 99 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Grant Solar, LLC approvals pending | Geronimo Power | SD | planned | 99 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Harvest Gold Solar independent owner | Harvest Gold Solar Power, LLC | MS | operating | 99 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Harvest Wind Project independent owner | Harvest Wind Project TIC | WA | operating | 99 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lead BESS 1 independent owner | Hanford BESS LLC | CA | operating | 99 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | McGinness Hills 3 independent owner | Ormat Nevada Inc | NV | operating | 99 | Other | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Milford Solar 1 independent owner | Milford Solar 1, LLC | UT | operating | 99 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Minco Wind I, LLC independent owner | FPLE Wind, LLC | OK | operating | 99 | Wind | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Moody Air Force Base Solar utility owner | Georgia Power Co | GA | operating | 99 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mower County Wind Energy Center utility owner | Northern States Power Co - Minnesota | MN | operating | 99 | Wind | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Noosa Energy Storage LLC under construction | Engie North America | CA | planned | 99 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Oliver Wind III, LLC independent owner | Oliver Wind III, LLC | ND | operating | 99 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Paulding Wind Farm II independent owner | Paulding Wind Farm II LLC | OH | operating | 99 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pebble Springs Wind LLC independent owner | Avangrid Power LLC | OR | operating | 99 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Perrin Ranch Wind LLC independent owner | Perrin Ranch Wind LLC | AZ | operating | 99 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Prairie State Solar Project independent owner | Prairie State Solar, LLC | IL | operating | 99 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Redbed Plains Wind Farm independent owner | Redbed Plains Wind Farm LLC | OK | operating | 99 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rising Tree Wind Farm III independent owner | Rising Tree Wind Farm III LLC | CA | operating | 99 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Robert A Reid utility owner | Big Rivers Electric Corp | KY | operating | 99 | Gas | 1976 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Seiling Wind II independent owner | NextEra Energy Seiling Wind | OK | operating | 99 | Wind | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SEMASS Resource Recovery independent owner | SEMASS Partnership | MA | operating | 99 | Other | 1988 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Silver Lake utility owner | Rochester Public Utilities | MN | retired | 99 | Coal | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | St Nicholas Cogen Project independent owner | Schuylkill Energy Resource Inc | PA | operating | 99 | Coal | 1990 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Star Point Wind Project LLC independent owner | Avangrid Power LLC | OR | operating | 99 | Wind | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sweetwater Wind 2 LLC independent owner | Leeward Asset Management, LLC | TX | operating | 99 | Wind | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tom G Smith utility owner | City of Lake Worth Beach - (FL) | FL | operating | 99 | Gas | 1965 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wautoma Solar utility owner | Wisconsin Power & Light Co | WI | operating | 99 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Altona independent owner | Valcour Operating Services, LLC | NY | operating | 98 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bayou Galion Solar Project independent owner | Bayou Galion Solar Project, LLC | LA | operating | 98 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cambria Cogen independent owner | Cambria CoGen Co | PA | retired | 98 | Coal | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Carambola BESS independent owner | Carambola BESS LLC | TX | operating | 98 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hancock County Wind Energy Center independent owner | FPL Energy Hancock County Wind, LLC | IA | operating | 98 | Wind | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Henrietta Peaker independent owner | MRP San Joaquin Energy LLC. | CA | operating | 98 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hoopeston Wind LLC independent owner | Hoopeston Wind LLC | IL | operating | 98 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lansing BWL REO Town Plant utility owner | Lansing Board of Water and Light | MI | operating | 98 | Gas | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Laurel Mountain Hybrid independent owner | AES Distributed Energy | WV | operating | 98 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Osceola Windpower LLC independent owner | Osceola Windpower LLC | IA | operating | 98 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Project Orange Associates LP independent owner | Project Orange Associates LP | NY | retired | 98 | Gas | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Quilt Block Wind Farm LLC independent owner | Quilt Block Wind Farm LLC | WI | operating | 98 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Scholz utility owner | Florida Power & Light Co | FL | retired | 98 | Coal | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SF Azalea, LLC independent owner | Idemitsu Renewables | CA | operating | 98 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Spring Grove I utility owner | Dominion Energy Inc. | VA | operating | 98 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TECO CHP-1 independent owner | Texas Medical Center Central | TX | operating | 98 | Gas | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Thompson Falls utility owner | NorthWestern Energy (MT Hydro) | MT | operating | 98 | Hydro | 1915 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Acid BESS independent owner | Malaga BESS LLC | CA | operating | 97 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Balch 2 utility owner | Pacific Gas & Electric Co. | CA | operating | 97 | Hydro | 1958 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | CalTex Holdings LP independent owner | CalTex Holdings LP | TX | retired | 97 | Gas | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Coyote Ridge independent owner | Coyote Ridge LLC | SD | operating | 97 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dartmouth Power Associates LP independent owner | Dartmouth Energy Center | MA | operating | 97 | Gas | 1992 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fernandina Beach Mill independent owner | WestRock, Fernandina Beach | FL | operating | 97 | Other | 1982 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | General Electric Plastic utility owner | Alabama Power Co | AL | operating | 97 | Gas | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Soldotna utility owner | Homer Electric Assn Inc | AK | operating | 97 | Gas | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Albany Paper Mill independent owner | International Paper | OR | retired | 96 | Gas | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blake Solar Plant independent owner | Horus West Virginia 1, LLC | WV | operating | 96 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | C E Newman utility owner | City of Garland - (TX) | TX | retired | 96 | Gas | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Colorado Highlands Wind independent owner | Colorado Highlands Wind LLC | CO | operating | 96 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cooperative Solar Three-Marion approvals received | East Kentucky Power Coop, Inc | KY | planned | 96 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Covington (MS) approvals received | Origis Energy USA, Inc | MS | planned | 96 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Grant Town Power Plant independent owner | American Bituminous Power LP | WV | operating | 96 | Coal | 1992 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Greers Ferry Lake utility owner | USCE-Little Rock District | AR | operating | 96 | Hydro | 1964 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hiram Clarke independent owner | Biofuels Power Corporation | TX | retired | 96 | Gas | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | International Paper Georgetown Mill independent owner | International Paper Co-GT Mill | SC | operating | 96 | Other | 1966 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nevada Cogen Associates 2 Black Mountain independent owner | Nevada Cogeneration Assoc # 2 | NV | operating | 96 | Gas | 1992 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nine Canyon utility owner | Energy Northwest | WA | operating | 96 | Wind | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Palm Beach Renewable Energy Facility 2 independent owner | Solid Waste Authority of Palm Beach Co | FL | operating | 96 | Other | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | S A Carlson utility owner | Jamestown Board of Public Util | NY | operating | 96 | Gas | 1951 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Warren F Sam Beasley Generation Station utility owner | Delaware Municipal Electric Corp | DE | operating | 96 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Waterbury Generation independent owner | Engie North America | CT | operating | 96 | Gas | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wittig Solar Park approvals received | Greenalia Solar Power Wittig, LLC | TX | planned | 96 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hoke Solar interconnection agreement signed 2022-04; online expected 2027-07; request 23INR0231; financial security poste | — | Gonzales Co., TX | planned | 95 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Big Muddy Solar under construction, over half done | Big Muddy Solar Project, LLC | IL | planned | 95 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blewett utility owner | Duke Energy Progress - (NC) | NC | operating | 95 | Oil | 1912 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blue Ridge Solar under construction | Dominion Renewable Energy | VA | planned | 95 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Exchequer independent owner | Merced Irrigation District | CA | operating | 95 | Hydro | 1967 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Flatiron utility owner | U S Bureau of Reclamation | CO | operating | 95 | Hydro | 1954 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Glen Canyon Solar A, LLC under construction | AES Distributed Energy | UT | planned | 95 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Happy Solar 1 independent owner | Lightsource Renewable Energy Asset Management, LLC | AR | operating | 95 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Heat Recovery Coke Facility independent owner | Cokenergy Inc | IN | operating | 95 | Other | 1998 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | ISG Weirton independent owner | Weirton Steel Corp | WV | retired | 95 | Gas | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Medical Area Total Energy Plant independent owner | MATEP LLC | MA | operating | 95 | Gas | 1980 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nevada Cogen Assoc#1 GarnetVly independent owner | Nevada Cogeneration Assoc # 1 | NV | operating | 95 | Gas | 1992 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Red Maple LRE approvals pending | Leeward Asset Management, LLC | IL | planned | 95 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | San Roman Wind I, LLC independent owner | Acciona Energy USA Global, LLC | TX | operating | 95 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sappi Cloquet Mill independent owner | Sappi Cloquet LLC | MN | operating | 95 | Other | 1929 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Scrubgrass Reclamation CO. LP. independent owner | Scrubgrass Reclamation CO. LP. | PA | operating | 95 | Coal | 1993 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sleeping Bear LLC independent owner | NRG Energy Gas & Wind Holdings Inc | OK | operating | 95 | Wind | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Stallings independent owner | Dynegy Midwest Generation Inc | IL | retired | 95 | Gas | 2013 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.