Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 41 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Maverick Solar 4, LLC independent owner | Maverick Solar 4, LLC | CA | operating | 100 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Meadow Lake Wind Farm V LLC independent owner | Meadow Lake Wind Farm V LLC | IN | operating | 100 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Merrillville Solar planned, approvals not started | Lightsource Renewable Energy Asset Management, LLC | IN | planned | 100 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mesquite Solar 2, LLC independent owner | RWE Clean Energy | AZ | operating | 100 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | New Frontier Wind independent owner | Meadowlark Wind I LLC | ND | operating | 100 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | New Frontiers Solar approvals pending | Clover Creek Solar Project LLC d/b/a New Frontiers Solar Park | KY | planned | 100 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | New Harvest Wind Project LLC independent owner | Avangrid Power LLC | IA | operating | 100 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | New Market Solar independent owner | New Market Solar | OH | operating | 100 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | North Fork TX independent owner | Engie North America | TX | operating | 100 | Battery storage | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | North Star Solar Project independent owner | North Star Solar PV LLC | MN | operating | 100 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Northern Divide Energy Storage under construction, over half done | Northern Divide Energy Storage, LLC | ND | planned | 100 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Northern Wind utility owner | Northern States Power Co - Minnesota | MN | operating | 100 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nottingham Solar under construction | BQ Energy Development | OH | planned | 100 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Oak Trail Solar, LLC independent owner | Leeward Asset Management, LLC | NC | operating | 100 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | OCI Alamo 5 LLC independent owner | RWE Clean Energy | TX | operating | 100 | Solar | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | OCI Alamo 7 LLC independent owner | RWE Clean Energy | TX | operating | 100 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ocotillo Wells independent owner | Conductive Power | CA | operating | 100 | Battery storage | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | OETN1 independent owner | OE_TN1 | TN | operating | 100 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Oso Negro approvals received | Oso Negro, LLC | NM | planned | 100 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ozark utility owner | USCE-Little Rock District | AR | operating | 100 | Hydro | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pamela Heights I Energy Center under construction | Pamela Heights I Energy Center LLC | TX | planned | 100 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pickaway Solar independent owner | Dominion Renewable Energy | OH | operating | 100 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Playa Solar 2 independent owner | EDF Renewable Asset Holdings, Inc. | NV | operating | 100 | Solar | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Point Beach Solar independent owner | Point Beach Solar | WI | operating | 100 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Polaris Solar Park utility owner | DTE Electric Company | MI | operating | 100 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pome BESS independent owner | MN8 Energy LLC | CA | operating | 100 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ponderosa Wind II independent owner | Ponderosa Wind II, LLC | OK | operating | 100 | Wind | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Powerline Energy Storage under construction | Duke Energy Florida, LLC | FL | planned | 100 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ragsdale Solar LLC independent owner | Ragsdale Solar, LLC | MS | operating | 100 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Raven Storage under construction, over half done | Raven Storage, LLC | TX | planned | 100 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | RE Astoria independent owner | RE Astoria LLC | CA | operating | 100 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Redfield Solar independent owner | Redfield PV I, LLC | AR | operating | 100 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Renegade Solar Energy LLC utility owner | Upper Michigan Energy Resources Company | MI | operating | 100 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Riverside Solar LLC planned, approvals not started | AES Clean Energy | NY | planned | 100 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Riverstart Solar Park III independent owner | Riverstart Solar Park III LLC | IN | operating | 100 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Roanoke Rapids utility owner | Virginia Electric & Power Co | NC | operating | 100 | Hydro | 1955 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rose Gold Solar planned, approvals not started | Leeward Asset Management, LLC | IN | planned | 100 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rustic Hills Solar I approvals received | Clenera DevCo LLC | IN | planned | 100 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rustic Hills Solar II LLC approvals received | Clenera DevCo LLC | IN | planned | 100 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sadler Solar utility owner | Dominion Energy Inc. | VA | operating | 100 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Saint Energy Storage II LLC independent owner | Saint Energy Storage II LLC | AZ | operating | 100 | Battery storage | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Saint Solar independent owner | Saint Solar LLC | AZ | operating | 100 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | San Pablo Raceway independent owner | AES Distributed Energy | CA | operating | 100 | Solar | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sanborn BESS 1 independent owner | Terra-Gen Operating Co-BESS | CA | operating | 100 | Battery storage | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sanborn BESS 2 independent owner | Terra-Gen Operating Co-BESS | CA | operating | 100 | Battery storage | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Saticoy independent owner | Ventura Energy Storage, LLC | CA | operating | 100 | Battery storage | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SC 1 Data Center, Phase 2 independent owner | Xeres Ventures LLC | CA | operating | 100 | Oil | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Second Division Solar independent owner | Lightsource Renewable Energy Asset Management, LLC | TX | operating | 100 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Seven Flags BESS LLC independent owner | Seven Flags BESS LLC | TX | operating | 100 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Shoreham Energy LLC independent owner | MPH Cross Island Power | NY | operating | 100 | Oil | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sinnissippi Solar Energy LLC planned, approvals not started | Invenergy Services LLC | WI | planned | 100 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SJRR (LIG) independent owner | SJRR Power LLC | TX | operating | 100 | Gas | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sky Ranch BESS II independent owner | Sky Ranch Bess II | NM | operating | 100 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Solex Ridge Solar approvals pending | Solex Ridge, LLC | TX | planned | 100 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Somerset Solar LLC planned, approvals not started | AES Clean Energy | NY | planned | 100 | Solar | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Southampton Solar, LLC independent owner | Dominion Renewable Energy | VA | operating | 100 | Solar | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sowega Power utility owner | SOWEGA Power LLC | GA | operating | 100 | Gas | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Springfield Solar (WI) utility owner | Wisconsin Power & Light Co | WI | operating | 100 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Bacon III approvals received | SR Bacon III, LLC | GA | planned | 100 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Cordova approvals received | SR Cordova, LLC | SC | planned | 100 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Lambert I, LLC independent owner | SR Lambert I, LLC | SC | operating | 100 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Lambert II independent owner | SR Lambert II, LLC | SC | operating | 100 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Lumpkin independent owner | SR Lumpkin, LLC | GA | operating | 100 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | St Gall Energy Storage II independent owner | St Gall Energy Storage II LLC | TX | operating | 100 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Stoneray Power Partners, LLC independent owner | EDF Renewable Asset Holdings, Inc. | MN | operating | 100 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Stoneridge Solar, LLC built, not yet in commercial operation | RWE Clean Energy | TX | planned | 100 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Strasburg Solar Park under construction | DTE Electric Company | MI | planned | 100 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sunflower County utility owner | Sunflower County Solar Project, LLC | MS | operating | 100 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Swift Air Solar III independent owner | Origis Energy USA, Inc | TX | operating | 100 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Switchgrass Plains Solar, LLC under construction, over half done | Switchgrass Plains Solar, LLC | IL | planned | 100 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Techren Solar I LLC independent owner | Techren Solar I LLC | NV | operating | 100 | Solar | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Third Coast BESS, LLC approvals received | Cypress Creek Renewables | TX | planned | 100 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Three Rivers Solar Power, LLC under construction, over half done | Three Rivers Solar Power, LLC | ME | planned | 100 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tierra Seca independent owner | Tierra Seca BESS, LLC | TX | operating | 100 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Timber Cove Solar planned, approvals not started | Freestone Solar LLC | TX | planned | 100 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tres City Power LLC independent owner | Tres Power Victoria LLC | TX | operating | 100 | Gas | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tres Port Power, LLC independent owner | Tres Power Victoria LLC | TX | operating | 100 | Gas | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Triune Solar planned, approvals not started | Triune Solar LLC | TX | planned | 100 | Solar | 2030 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tuscola Wind II LLC independent owner | Tuscola Wind II LLC | MI | operating | 100 | Wind | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TX10 Hummingbird Storage independent owner | Key Capture Energy | TX | operating | 100 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TX12 Silicon Hill Storage independent owner | Key Capture Energy | TX | operating | 100 | Battery storage | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TX15 Limousin Oak Storage independent owner | Key Capture Energy | TX | operating | 100 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Victoria Port II independent owner | Victoria Port Power II | TX | operating | 100 | Gas | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Voyager Energy Storage under construction, over half done | Voyager Energy Storage LLC | MI | planned | 100 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Walnut Bend Solar Station PV utility owner | Entergy Arkansas LLC | AR | operating | 100 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wapello Solar LLC independent owner | Wapello Solar LLC | IA | operating | 100 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Weld Energy Storage under construction, over half done | Weld Energy Storage, LLC | CO | planned | 100 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | West Line Solar, LLC independent owner | Foster Clean Power A LLC | AZ | operating | 100 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | West of the Pecos Solar independent owner | RWE Clean Energy | TX | operating | 100 | Solar | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wheatridge 1 utility owner | Portland General Electric Co | OR | operating | 100 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | White Rock West Wind Project independent owner | White Rock Wind West, LLC | OK | operating | 100 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | White Tank Energy Storage under construction | White Tank Energy Storage LLC | AZ | planned | 100 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wildflower Solar, LLC (MS) independent owner | Deriva Energy | MS | operating | 100 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wildhorse Mountain Wind Facility independent owner | Southern Power Co | OK | operating | 100 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wildwood Solar Plant independent owner | Wildwood Solar, LLC | MS | operating | 100 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Agricola Wind planned, approvals not started | Liberty Renewables Incorporated | NY | planned | 99 | Wind | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | AMEA Peaking utility owner | Alabama Municipal Elec Authority - (AL) | AL | operating | 99 | Gas | 2004 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Aulander Holloman Solar, LLC independent owner | Aulander Holloman Solar, LLC | NC | operating | 99 | Solar | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blue Canyon Windpower V LLC independent owner | Blue Canyon Windpower V LLC | OK | operating | 99 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blue Summit II Wind independent owner | Blue Summit II Wind, LLC | TX | operating | 99 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.