Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 99 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Data center | Irvine 16842 Von Karman Ave 92606 Irvine USA | Hosting | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Irvine 2008 McGaw Ave 92614 Irvine USA | T-Mobile US | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Irvine Data Center 2640 Main Street CA 92614 Irvine United States | Alchemy Communications | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Irvine Data Center: SNA1 | DataBank | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Irvine Data Center: SNA2 | DataBank | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Irving 6431 Longhorn Drive TX 75063 Irving United States | Quality Technology Services (QTS) | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Irving Data Center | Microsoft | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | IS West (Agoura Ct) 30077 Agoura Ct 91301 Agoura Hills United States | keyinfo | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | IS West (Canwood) 29219 Canwood Street 91301 Agoura Hills United States | keyinfo | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | ISafeTECH Syracuse, NY 102 First Street, Suite 200 13209 Syracuse United States | ISafeTECH | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Iserv Company 5222 33rd St 49512 Grand Rapids United States | Iserv | MI (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Isocentric Data Center (IDC) 100 West 5th Street, STE 705 74103 Tulsa United States | Isocentric Networks | OK (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | IStreet Solutions Vernon 1075 Triangle Ct 95605 Vernon United States | IStreet Solutions | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | ixColo Buffalo 350 Main St. NY Buffalo United States | ixColo | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | J5 Piqua Data Center | J5 LLC | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Jackson 111 E Capitol Street 39202 Jackson United States | Netdoor | MS (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Jackson County Steam Plant Access Rd 35772 Stevenson USA | AL (city-level) | existing or reported | — | — | — | ATLAS data center map | |
| Data center | Jackson County Data Center | AL (city-level) | existing or reported | — | — | — | ATLAS data center map | |
| Data center | Jacksonville 6602 Executive Park Court N, Unit 105 FL 32216 Jacksonville United States | EdgeConneX | FL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Jacksonville 4905 Belfort Road FL 32256 Jacksonville United States | Flexential | FL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Jacksonville 8324 Baymeadows Way 32256-8221 Jacksonville USA | TierPoint | FL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Jacksonville (West Forsyth Street) 200 W Forsyth St #1010 32202 Jacksonville United States | CenturyLink | FL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Jacksonville 1 421 W Church St 32202 Jacksonville USA | Cologix | FL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Jacksonville 2 4800 Spring Park Rd 32207 Jacksonville USA | Cologix | FL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Jarvis Media Group: Montgomery Data Center | Jarvis Media Group | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | JAX1 | Cologix | FL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | JAX2 | Cologix | FL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | JeanComputech Corporation 37 Belmont St 02301-5225 Brockton USA | JeannComputech Corporation | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Jeffersonville Data Center | Meta | IN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Jersey City 95 Christopher Columbus Drive, 16th Floor 07302 Jersey City United States | Quality Technology Services (QTS) | NJ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Jersey City (Evertrust Plaza) 1 Evertrust Plz 07302 Jersey City United States | CenturyLink | NJ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Jet.AI Moapa Data Center | Jet.AI | NV (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | JMA NAC Los Angeles 530 West 6th Street 90014 Los Angeles United States | JMA Wired | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | JMA Wired San Francisco 360 Spear St. 94105 San Francisco United States | JMA Ventures | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Joes Datacenter 324 E. 11th St. 64024 Kansas City United States | Joes Datacenter | MO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | John Hancock Financial Center 601 Congress St 02210 Boston USA | John Hancock Financial Center | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | John Marshall CommonsTech Park | CTP-1 LLC | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | JPMorgan Chase - Oklahoma City 100 N Broadway Ave 73102-8614 Oklahoma City USA | JPMorgan Chase | OK (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Jumping Bison Greensburg Data Center | Jumping Bison LLC | IN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Justified Data | TeraWulf | KY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Kansas City 9050 NE Underground Dr 64161 Kansas City USA | LightEdge Solutions | NE (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Kansas City 1100 Walnut Street MO Kansas City United States | CenturyLink | MO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Kansas City 1100 Main St. 64105 Kansas City United States | Cogent Communications Inc. | MO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Kansas City 1111 Main St. 64105 Kansas City United States | CenturyLink | MO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Kansas City 10801 N Amity Ave 64153 Kansas City USA | TierPoint | MO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Kansas City 1 (Edmond Street) 825 Edmond St 64501-2737 St Joseph USA | Online Tech | MO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Kansas City 2 (South 58th Street) 1301 S 58th St 64507-7757 St Joseph USA | Online Tech | MO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Kansas City Data Center 10801 N. Amity Avenue MO 64153 Kansas City United States | CoSentry | MO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Kansas City Northland Campus | MO (city-level) | existing or reported | — | — | — | ATLAS data center map | |
| Data center | Karis Critical DeKalb Campus | Karis Critical | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Karis Critical New Albany Data Center | Karis Critical | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Karis Critical: Merrillville | Karis Critical | IN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | KCI-29 Data Center | PORT KC | MO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | KDWEB San Jose 50 W San Fernando, 18th Floor 95122 San Jose United States | KDweb | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Keene (Marlboro Street) 310 Marlboro St 03431 Keene USA | FirstLight | NH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Kenosha Campus | Microsoft | WI (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Keyser Farm | Red Ace, Keyser Family | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | KeySpan Brentwood NY POP 1650 Islip Ave 11717 Brentwood United States | KeySpan Communications | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | King George Technology Center | Green Energy Ventures | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | King of Prussia Data Center 630 Clark Ave 19406-1407 King of Prussia USA | Carter Validus Mission Critical REIT | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Kings Mountain 140 Riverside Ct NC Kings Mountain United States | Ensono | NC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Kingsboro Data Center Campus | Energy Storage Solutions | NC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Kingsbury Data Center | — | IN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Klondike Wyalusing Data Center | New Fortress Energy | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Knoxville 500 W Summit Hill Dr SW 37902 Knoxville USA | Nexus Group | TN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Kroozin at SH-249 | Altaf Makanojiya | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Kuna Data Center | Meta | ID (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | La Porte Data Center | Microsoft | IN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | La Vista Nebraska 10928 Harry Watanabe Pkwy NE La Vista United States | Oath | NE (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | LAK1 | Cologix | FL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Lake Anna Tech Campus | Amazon | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Lake Hawkeye | TeraWulf | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Lake Mariner - CB-1 and CB-2 | TeraWulf | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Lake Mariner - CB-3, CB-4 & CB-5 | TeraWulf | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Lake Mariner expansion | TeraWulf | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Lakeland 1 2850 Interstate Dr 33805-2378 Lakeland USA | Cologix | FL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Lakeside Commerce Park | Microsoft | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Lambda Kansas Data Center | Lambda | MO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Lancaster Data Center - Phase 1 | OH (city-level) | existing or reported | — | — | — | ATLAS data center map | |
| Data center | Lancaster Data Center - Phase 2 | OH (city-level) | existing or reported | — | — | — | ATLAS data center map | |
| Data center | Laredo 13619 Cabezut Dr 78045 Laredo USA | MDC (McAllen Data Center) | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Laredo 520 Matamoros St 78040 Laredo USA | Grande Communications Networks LLC | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Laredo 520 Matamoros St 78040 Laredo USA | VTX1 Companies | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Laredo POP 302 Washington St 78040-4544 Laredo USA | Crown Castle | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Las Vegas 1541 Pama Lane NV 89119 Las Vegas United States | EdgeConneX | NV (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Las Vegas 2475 Arden Avenue 89104 Las Vegas United States | Switch | NV (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Las Vegas 6825 W Post Rd NV 89118 Las Vegas United States | Pair Networks | NV (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Las Vegas (Silvestri Lane) 3944 Silvestri Ln 89120-3977 Las Vegas USA | CenturyLink | NV (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Las Vegas 1-6 4495 E Sahara Ave NV 89104 Las Vegas United States | Switch | NV (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Las Vegas 7 7135 South Decatur Boulevard NV 89118 Las Vegas United States | Switch | NV (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Las Vegas 8 W Warm Springs Road 89139 Las Vegas USA | Switch | NV (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Las Vegas 9 Westwind Rd 89139 Las Vegas USA | Switch | NV (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Las Vegas Campus - Phase 1 | Novva | NV (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Las Vegas Data Center: LAS1 | DataBank | NV (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Las Vegas/Henderson 2240 Corporate Cir, 1st floor 89074-7748 Henderson USA | XO Communications | NV (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | LAS1 1110 Palms Airport Dr NV 89119 Las Vegas United States | Fiberhub | NV (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | LasVegas.Net 2595 Fremont St NV 89104 Las Vegas United States | LV.net | NV (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Latisys CHI2 1808 Swift Dr, Unit B IL 60523 Oak Brook United States | Latisys | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Latisys-Ashburn 21635 Red Rum Drive, Suite 100 20147 Ashburn United States | Latisys | DC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Latisys-Chicago 1808 Swift Drive, Unit C 60523 Oak Brook United States | Latisys | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.