Explorer

Known data centers and power projects, with the source on every row.

A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.

11,405 results, page 95 of 115. Biggest first.

TypeNameOwnerWhereStatusMWFuelYearSource
Data centerEast Point Data CenterMicrosoftGA (city-level)existing or reported———ATLAS data center map
Data centerEast Twin Cities Data Cente MSP2DataBankMN (city-level)existing or reported———ATLAS data center map
Data centerEast Twin Cities Data Center
3255 Neil Armstrong Boulevard MN 55121 Eagan United States
DataBankMN (city-level)existing or reported———ATLAS data center map
Data centerEast Wenatchee CampusMicrosoftWA (city-level)existing or reported———ATLAS data center map
Data centerEastgate
401 Shadeland Ave 46219 Indianapolis USA
Lifeline Data CenterIN (city-level)existing or reported———ATLAS data center map
Data centerEastgate Cincinnati
4270 Ivy Pointe Blvd 45245-0001 Cincinnati USA
ImmedionOH (city-level)existing or reported———ATLAS data center map
Data centerEdge data center RA1American TowerNC (city-level)existing or reported———ATLAS data center map
Data centerEdgeBCC
1435 Northridge Circle NE 50009 Altoona United States
EdgeBCCNE (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX Ashville Data CenterEdgeConneXOH (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX ATL01EdgeConneXGA (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX ATL02EdgeConneXGA (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX ATL11-13EdgeConneXGA (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX AUS02EdgeConneXTX (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX BOS01EdgeConneXMA (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX CHI01EdgeConneXIL (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX CHI02EdgeConneXIL (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX DEN01EdgeConneXCO (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX DEN02EdgeConneXCO (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX DET01EdgeConneXMI (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX HOU01EdgeConneXTX (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX JAX01EdgeConneXFL (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX LAS01EdgeConneXNV (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX MAD01EdgeConneXWI (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX MEM01EdgeConneXTN (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX MIA01EdgeConneXFL (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX MIA02EdgeConneXFL (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX MSP01EdgeConneXMN (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX NAS01EdgeConneXTN (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX New Albany CampusEdgeConneXOH (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX NOR01EdgeConneXVA (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX PHX01EdgeConneXAZ (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX PHX11EdgeConneXAZ (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX PIT01EdgeConneXPA (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX POR01EdgeConneXOR (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX POR02EdgeConneXOR (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX POR03-04EdgeConneXOR (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX RIC01EdgeConneXVA (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX SAC01EdgeConneXCA (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX SDG01EdgeConneXCA (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX SEA01EdgeConneXWA (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX SLC01EdgeConneXUT (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX SLI01EdgeConneXLA (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX SVC01EdgeConneXCA (city-level)existing or reported———ATLAS data center map
Data centerEdgeConneX TAL01EdgeConneXFL (city-level)existing or reported———ATLAS data center map
Data centerEdgeCore AS01 and AS02EdgeCoreVA (city-level)existing or reported———ATLAS data center map
Data centerEdgeCore DullesEdgeCoreVA (city-level)existing or reported———ATLAS data center map
Data centerEdgeCore Mesa: PH03EdgeCoreAZ (city-level)existing or reported———ATLAS data center map
Data centerEdgeCore Shannon Hill CampusEdgeCoreVA (city-level)existing or reported———ATLAS data center map
Data centerEdged ATL01-01EdgedGA (city-level)existing or reported———ATLAS data center map
Data centerEdged ATL01-02EdgedGA (city-level)existing or reported———ATLAS data center map
Data centerEdged ATL01-03EdgedGA (city-level)existing or reported———ATLAS data center map
Data centerEdged Chicago ORD01-1EdgedIL (city-level)existing or reported———ATLAS data center map
Data centerEdged Chicago ORD01-2EdgedIL (city-level)existing or reported———ATLAS data center map
Data centerEdged Des MoinesEdgedIA (city-level)existing or reported———ATLAS data center map
Data centerEdged DFW Data CenterEdgedTX (city-level)existing or reported———ATLAS data center map
Data centerEdison, New Jersey
3003 Woodbridge Ave 08837 Edison USA
Steadfast NetworksNJ (city-level)existing or reported———ATLAS data center map
Data centerEDS - Tulsa
7400 N Lakewood Ave 74117-1308 Tulsa USA
Hewlett Packard (HP)OK (city-level)existing or reported———ATLAS data center map
Data centerEdwards AFB Data Center—CA (city-level)existing or reported———ATLAS data center map
Data centerEl Paso
11455 Cedar Oak Dr 79936-6009 El Paso USA
MDC (McAllen Data Center)TX (city-level)existing or reported———ATLAS data center map
Data centerEl Paso (East Main Street)
201 E Main St 79901 El Paso USA
CenturyLinkTX (city-level)existing or reported———ATLAS data center map
Data centerEl Paso (West Overland)
500 W Overland Ave 79901 El Paso USA
CenturyLinkTX (city-level)existing or reported———ATLAS data center map
Data centerElgin Data Center
2455 Alft Ln 60124-7864 Elgin USA
Carter Validus Mission Critical REITIL (city-level)existing or reported———ATLAS data center map
Data centerElmsford
401 Fieldcrest Drive NY 10523 Elmsford United States
EquinixNY (city-level)existing or reported———ATLAS data center map
Data centerEmeryville
1400 65th St 94608 Emeryville USA
EvocativeCA (city-level)existing or reported———ATLAS data center map
Data centerEneus Energy Cameron Data CenterEneus EnergyTX (city-level)existing or reported———ATLAS data center map
Data centerEnglewood Colorado Data Center
76 Inverness Drive East, Suite B 80112 Englewood United States
Negma Business Solutions, IncCO (city-level)existing or reported———ATLAS data center map
Data centerEnglewood Data Center DEN1DataBankCO (city-level)existing or reported———ATLAS data center map
Data centerENGUARD Data Center
2448 East 81st street 74137 Tulsa United States
EnguardOK (city-level)existing or reported———ATLAS data center map
Data centerEnon Road TechnologiesENON RD LLCVA (city-level)existing or reported———ATLAS data center map
Data centerEnterhost
801 Cherry Street, Suite LLG50 76102 Fort Worth United States
EnterhostTX (city-level)existing or reported———ATLAS data center map
Data centerEphrata
140 Akron Rd 17522-2602 Ephrata USA
Windstream Services, LLCPA (city-level)existing or reported———ATLAS data center map
Data centerEpsilon Global Hubs - New York
60 Hudson Street
EpsilonNY (city-level)existing or reported———ATLAS data center map
Data centerEQUINEX DC13EquinixVA (city-level)existing or reported———ATLAS data center map
Data centerEquinixEquinixVA (city-level)existing or reported———ATLAS data center map
Data centerEquinix DA12EquinixTX (city-level)existing or reported———ATLAS data center map
Data centerEquinix DC 97LDI PROPCO 2 LLCVA (city-level)existing or reported———ATLAS data center map
Data centerEQUINIX DC21EquinixVA (city-level)existing or reported———ATLAS data center map
Data centerEQUINIX LLCEquinixVA (city-level)existing or reported———ATLAS data center map
Data centerEquinix NY9
111 8th Avenue
EquinixNY (city-level)existing or reported———ATLAS data center map
Data centerEquinix SV12 San JoseEquinixCA (city-level)existing or reported———ATLAS data center map
Data centerETC-LITH
920 East Oak Street #4 60156 Lake in the Hills United States
Excalibur TechnologyIL (city-level)existing or reported———ATLAS data center map
Data centerEverett
2707 Colby Ave, suite 705 98201 Everett USA
Green House DataWA (city-level)existing or reported———ATLAS data center map
Data centerEvocative JFK2
480 N Bedford Rd
Evocative Data CentersNY (city-level)existing or reported———ATLAS data center map
Data centerEvoque TN campus (including expansion)Centersquare (formerly Evoque)TN (city-level)existing or reported———ATLAS data center map
Data centerEWR1
101 Possumtown Road NJ 08854 Piscataway United States
Net2EZNJ (city-level)existing or reported———ATLAS data center map
Data centerEX West Green Data CenterCorporate Office Properties TrustTX (city-level)existing or reported———ATLAS data center map
Data centerEXA DC New York
60 Hudson Street
EXA InfrastructureNY (city-level)existing or reported———ATLAS data center map
Data centerEzell Drive CampuAmazonTX (city-level)existing or reported———ATLAS data center map
Data centerFadeley CampusAmazonVA (city-level)existing or reported———ATLAS data center map
Data centerFairburn Technology CenterBohannon Road VentureGA (city-level)existing or reported———ATLAS data center map
Data centerFairfax
8613 Lee Hwy, 1st floor 22031 Fairfax USA
XO CommunicationsVA (city-level)existing or reported———ATLAS data center map
Data centerFairview Crossroads Data CenterFairview Crossroads LLCPA (city-level)existing or reported———ATLAS data center map
Data centerFairwater 1 - Mount PleasantMicrosoftWI (city-level)existing or reported———ATLAS data center map
Data centerFairwater 2 - AtlantaMicrosoftGA (city-level)existing or reported———ATLAS data center map
Data centerFairwater Expansion - Durand AveMicrosoftWI (city-level)existing or reported———ATLAS data center map
Data centerFairwater Expansion - International DrMicrosoftWI (city-level)existing or reported———ATLAS data center map
Data centerFall River
456 Bedford Street 02720 Fall River United States
Granite Block Global Data Center Inc.MA (city-level)existing or reported———ATLAS data center map
Data centerFarmingdale, NY
115 Bi County Boulevard 11735 Farmingdale United States
Crown CastleNY (city-level)existing or reported———ATLAS data center map
Data centerFDCservers.net Chicago
141 West Jackson Blvd., Suite 1135 60604 Chicago United States
FDCservers.net LLCIL (city-level)existing or reported———ATLAS data center map
Data centerFedConnect San Francisco
60 Federal Street 94103 San Francisco United States
60 Fed LLCCA (city-level)existing or reported———ATLAS data center map

Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.

Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.