Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 88 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Data center | Baltimore Technology Park 1401 Russell Street 21230 Baltimore United States | Baltimore Technology Park | MD (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Baltimore Tide Point 1050 Hull Street 21230 Baltimore United States | Expedient | MD (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Bandwidth Exchange Building 900 Walnut 63102 St. Louis United States | Hostirian | MO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Bangor (Summer Street) 60 Summer St 04401-6446 Bangor USA | FirstLight | ME (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Bank of America | Bank of America | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Bank of America - Anaheim 300 S Harbor Blvd 92805 Anaheim USA | Bank of America | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Bauxite Data Center 1 | Rowan Digital Infrastructure | MD (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Bauxite Data Center 2 | Rowan Digital Infrastructure | MD (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Bauxite Data Center 3 | Rowan Digital Infrastructure | MD (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | BBT Midland Data Center | BBT | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | BCORE COPT DC-15 | BCORE COPT DC-15 LLC | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Beale Project Atlas | Beale Infrastructure | OK (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Beale Project Mustang | Beale Infrastructure | OK (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Beale Project Pilot Data Center | Beale Infrastructure | KS (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Beaumeade II 44610 Guilford Drive Ashburn United States | DBT DATA | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Beaumeade IV 21800 Beaumeade Circle Ashburn United States | DBT DATA | MD (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | BEAUMEADE LC PHASE III LLC | BEAUMEADE LC PHASE III LLC | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Becker Data Center | Microsoft | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Bedford Data Center 8 Commerce Drive NH 03110 Bedford United States | ColoSpace | NH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Bellingham 851 Coho Way, Suite 206 98225 Bellingham USA | Green House Data | WA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Belmont Innovation Campus | LOUDOUN GC LLC | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Beltsville 7020 Virginia Manor Road 20705 Beltsville United States | Unknown | MD (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Beltsville 11700 Montgomery Road 20705 Beltsville United States | Coloco | MD (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Beltsville (Montgomery Road) 11700 Montgomery Rd 20705 Beltsville USA | AiNET | MD (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Bemidji 1831 Anne St. NW MN 56601 Bemidji United States | Paul Bunyan Communications | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Bend 20845 Sockeye Place OR Bend United States | OneNeck | OR (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Berkeley County 1669 Garrott avenue SC 29461 Goose Creek United States | SC (city-level) | existing or reported | — | — | — | ATLAS data center map | |
| Data center | Berkeley County (Moncks Corner) Campus | SC (city-level) | existing or reported | — | — | — | ATLAS data center map | |
| Data center | Berry Hill (Melrose Ave) 708 Melrose Ave 37211 Berry Hill United States | CenturyLink | TN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Bestline Communications 1122 Colorado St, Suite 110 78701 Austin United States | Bestline Communications | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Bethlehem 3864 Courtney St, Ste 130 18017 Bethlehem USA | TierPoint | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | BHI NOC Corporate Way 7599 55344 Eden Prairie United States | BHI | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Bigbyte.cc Corp. 123 Central Ave. NW 87102 Albuquerque United States | Bigbyte.cc Corp. | NM (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Bilateral Energy Knox Ranch Data Center | Bilateral Energy LLC | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Binary.net 134 S. 13th St. 68508 Lincoln United States | Binary.net | NE (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Binghamton (Henry Street) 144 Henry St 13901 Binghamton United States | CenturyLink | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Binghamton (Henry Street) 70 Henry St 13901 Binghamton USA | FirstLight | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Birchwood AWS | Amazon | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Birmingham 1 Golden Flake Dr 35205-3312 Birmingham USA | DC Blox | AL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Birmingham (North 20th Street) 505 20th St N 35203 Birmingham United States | CenturyLink | AL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | BIT HOLDINGS FIFTY-FOUR | BIT HOLDINGS FIFTY-FOUR INC | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Black Mountain Power San Antonio | Black Mountain | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Black Mountain: Forest Hill | Black Mountain | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Black Pearl Bitcoin mining | Cipher Mining | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Blaisdell Property Data Center | TC Blaisdell of Delaware | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Blue Ash 4600 McAuley Pl, Floor 4 45242 Cincinnati USA | CyrusOne | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Blue Hill Plaza 2 Blue Hill Plaza | Blue Hill Data Services | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | BLUE SLING ACC 9 | BLUE SLING ACC 9 LLC | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | BlueBridge Networks 1255 Euclid Ave, Fifth Floor 44115 Cleveland United States | BlueBridge Networks | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Bluelock IN 6325 Morenci Trail IN 46268 Indianapolis United States | Bluelock | IN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Bluemile Columbus DC 226 North 5th Street, Third Floor 43215 Columbus United States | Bluemile | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Blueprint Projects: Taylor City | Blueprint Projects | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | BluSky AI Delta Data Center | BluSky AI | UT (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | BluSky AI Milford Campus | BluSky AI | UT (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Blythewood Data Center 10301 Wilson Blvd 29016-9018 Blythewood USA | Carter Validus Mission Critical REIT | SC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boardman Rippee Road OR Boardman United States | Amazon | OR (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boca Raton 3500 NW Boca Raton Blvd, Bldg 900 33431 Boca Raton USA | 365 Data Centers | FL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boca Raton (Conference Way North) 5050 Conference Way North 33431 Boca Raton United States | Cogent Communications Inc. | FL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boise 9700 W. Bethel Court 83709 Boise United States | The Benaroya Company | ID (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boise 1450 S Eagle Flight Way ID 83709 Boise United States | Involta | ID (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boise (North Capitol) 199 N Capitol Blvd 83702 Boise United States | CenturyLink | ID (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boise (West Airportway) 2223 W Airportway 83702 Boise United States | CenturyLink | ID (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Borman Data Center 11756 Borman Drive 63146 St. Louis United States | Hostirian | MO (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boston 451 D Street, 3rd floor 02210 Boston United States | XO Communications | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boston 22 Linnell Circle MA 01821 Billerica United States | EdgeConneX | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boston 1 Cabot Road 02155 Medford United States | Expedient | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boston 70 Inner Belt Rd 02143 Somerville USA | CoreSite | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boston 486 Arsenal St 02472 Watertown USA | Brookfield Infrastructure Partners LP | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boston (Innerbelt Road) 59 Innerbelt Road 02143 Somerville United States | Cogent Communications Inc. | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boston 1 74 West St, 1st Floor 02451 Waltham United States | Equinix | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boston 1 70 Innerbelt Rd MA 02413 Somerville United States | INAP (Internap Corporation) | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boston 2 41 Alexander Road MA 01821 Billerica United States | Equinix | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boston 2 50 Inner Belt MA 02143 Somerville United States | INAP (Internap Corporation) | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boston 2 Alexander Rd 41 01821 Billerica United States | Equinix | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boston BOS-020 data center 20 Overland St MA 02215 Boston United States | Sungard | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boston BOS-70 data center Inner Belt Rd 70 02143 Somerville United States | Sungard | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boston Data Center 34 St Martin Dr, Suite 3 01752-3021 Marlborough USA | Colocation America | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boston Data Center (Somerville) 70 Inner Belt Road MA 02143 Somerville United States | ColoSpace | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boston-Andover 15 Shattuck Rd 01810-2429 Andover USA | TierPoint | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boston-Charlestown 500 Rutherford Ave 02129 Boston USA | TierPoint | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boston-Marlborough 34 St Martin Dr 01752-3021 Marlborough USA | TierPoint | MA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Botique Data Center | Donato Solar | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | BOURZOU VENTURES LLC (CloudHQ) | BOURZOU VENTURES LLC (CloudHQ) | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Bowling Green Data Center | Meta | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boyd Farms Data Center | Microsoft | NC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boydton Campus | Microsoft | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Boydton Virginia Plank Road Industrial Park, Herbert Dr & Route 58 VA Boydton United States | Microsoft | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Brazil Data Center | — | IN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Breaker Street Data Center | Catalyst Commercial Development | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Bresco Broadband 180 E. Broad Street 43215 Columbus United States | Bresco Broadband | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Brewster Mountain Top Data Center | Brewster Land Company | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Bristolville 25 Lordstown Data Center | Bristolville 25 Developer | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Bristow Campus | Microsoft | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Broadband One 3500 NW Boca Raton Blvd, Bldg 900 33431 Boca Raton United States | Host.net | FL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | BroadRiver DC1 1000 Hemphill Ave, NW 30318 Atlanta United States | BroadRiver | GA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | BroadRiver DC3 1120 Curran Street NW 30318 Atlanta United States | BroadRiver | GA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Brookfield 13935 Bishops Dr 53005 Brookfield USA | Windstream Services, LLC | WI (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Brookhaven Logistics Center | Unknown | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Brooklyn 882 3rd Avenue, 8th Floor 11232 Brooklyn United States | ColoGuard | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Brooklyn Park Data Center MSP3 | DataBank | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.