Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 8 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Jack Fusco Energy Center independent owner | Brazos Valley Energy | TX | operating | 676 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | McIntosh (AL) utility owner | PowerSouth Energy Cooperative | AL | operating | 676 | Gas | 1991 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Brownlee utility owner | Idaho Power Co | ID | operating | 675 | Hydro | 1958 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Riverside Energy Center utility owner | Wisconsin Power & Light Co | WI | operating | 675 | Gas | 2004 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Banita Creek- Spindlepop Solar under construction | Parliament Energy Holdings LLC | TX | planned | 674 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Arvah B Hopkins utility owner | City of Tallahassee - (FL) | FL | operating | 673 | Gas | 1977 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | IP Roman Wind approvals pending | Intersect USA, LLC | TX | planned | 671 | Wind | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pilgrim Nuclear Power Station independent owner | Entergy Nuclear Generation Co | MA | retired | 670 | Nuclear | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Columbia Energy Center (SC) utility owner | Dominion Energy South Carolina, Inc | SC | operating | 669 | Gas | 2004 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | E F Barrett utility owner | National Grid Generation LLC | NY | operating | 669 | Gas | 1956 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Virginia City Hybrid Energy Center utility owner | Virginia Electric & Power Co | VA | operating | 668 | Coal | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wilson Dam utility owner | Tennessee Valley Authority | AL | operating | 667 | Hydro | 1925 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Astoria Gas Turbines independent owner | NRG Astoria Gas Turbine Operations Inc | NY | retired | 666 | Gas | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bear Swamp independent owner | Bear Swamp Power Company LLC | MA | operating | 666 | Hydro | 1974 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | C D McIntosh Jr utility owner | City of Lakeland - (FL) | FL | operating | 666 | Gas | 1970 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hill Top Energy Center, LLC independent owner | Hill Top Energy Center, LLC | PA | operating | 665 | Gas | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sugar Creek Power utility owner | Northern Indiana Pub Serv Co | IN | operating | 665 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Capricorn Ridge Wind LLC independent owner | Capricorn Ridge Wind LLC | TX | operating | 663 | Wind | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lansing Smith utility owner | Florida Power & Light Co | FL | operating | 662 | Gas | 1971 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Williams utility owner | South Carolina Genertg Co, Inc | SC | operating | 660 | Coal | 1973 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Carlsbad Energy Center independent owner | NRG California Peaker Operations LLC | CA | operating | 659 | Gas | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Southwestern utility owner | Public Service Co of Oklahoma | OK | operating | 658 | Gas | 1952 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Leland Olds utility owner | Basin Electric Power Coop | ND | operating | 656 | Coal | 1966 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dogwood Energy Facility independent owner | Dogwood Power Management, LLC | MO | operating | 655 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Griffith Energy LLC independent owner | Griffith Energy LLC | AZ | operating | 655 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Russell City Energy Center independent owner | Russell City Energy Company LLC | CA | operating | 655 | Gas | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Somerset Operating Co LLC independent owner | Somerset Operating Co LLC | NY | retired | 655 | Coal | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Colorado Bend Energy Center independent owner | CER Colorado Bend Energy Partners LP | TX | operating | 654 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Empire Generating Co LLC independent owner | Empire Generating Co LLC | NY | operating | 654 | Gas | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | McWilliams utility owner | PowerSouth Energy Cooperative | AL | operating | 654 | Gas | 1954 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lower Mount Bethel Energy independent owner | Lower Mount Bethel Energy LLC | PA | operating | 652 | Gas | 2004 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Astoria Energy II independent owner | Astoria Energy II LLC | NY | operating | 650 | Gas | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hecate Energy Longhorn Solar LLC independent owner | Repsol Renewables NA | TX | operating | 650 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Luna Energy Facility utility owner | Public Service Co of NM | NM | operating | 650 | Gas | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wood River independent owner | Dynegy Midwest Generation Inc | IL | retired | 650 | Coal | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Jackson Generating Station utility owner | Consumers Energy Co - (MI) | MI | operating | 649 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Castle Bluff Energy Center planned, approvals not started | Union Electric Co - (MO) | MO | planned | 648 | Gas | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | A B Brown utility owner | Southern Indiana Gas & Elec Co | IN | operating | 647 | Gas | 1991 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Darden I Solar approvals received | Intersect USA, LLC | CA | planned | 646 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Darden II Solar approvals received | Intersect USA, LLC | CA | planned | 646 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Darden III Solar approvals received | Intersect USA, LLC | CA | planned | 646 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Darden IV Solar approvals received | Intersect USA, LLC | CA | planned | 646 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | North Omaha utility owner | Omaha Public Power District | NE | operating | 645 | Coal | 1954 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bayonne Energy Center independent owner | Bayonne Energy Center LLC | NJ | operating | 644 | Gas | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Eagle Valley (IN) utility owner | AES Indiana | IN | operating | 644 | Gas | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Edward C Hyatt utility owner | California Dept. of Water Resources | CA | operating | 644 | Hydro | 1968 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | High Bridge utility owner | Northern States Power Co - Minnesota | MN | operating | 644 | Gas | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Odyssey Energy Altura Cogen, LLC independent owner | Odyssey Operating Services | TX | operating | 644 | Gas | 1985 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Osprey Energy Center Power Plant utility owner | Duke Energy Florida, LLC | FL | operating | 644 | Gas | 2004 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | High Banks Wind independent owner | High Banks Wind, LLC | KS | operating | 643 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Boardman utility owner | Portland General Electric Co | OR | retired | 642 | Coal | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | New Haven Steam independent owner | Generation Bridge II Connecticut, LLC | CT | operating | 642 | Oil | 1975 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | South Oak Creek utility owner | Wisconsin Electric Power Co | WI | operating | 642 | Coal | 1965 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bailly utility owner | Northern Indiana Pub Serv Co | IN | retired | 641 | Coal | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Grand Tower Energy Center LLC independent owner | Mainline Generation LLC | IL | retired | 641 | Gas | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gowanus Gas Turbines Generating independent owner | Astoria Generating Company, L.P. | NY | operating | 640 | Oil | 1971 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cheswick Power Plant independent owner | GenOn Power Midwest, LP | PA | retired | 637 | Coal | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Reid Gardner utility owner | Nevada Power Co | NV | retired | 637 | Coal | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sutter Energy Center independent owner | Calpine Corp-Sutter | CA | operating | 636 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Graham independent owner | Luminant Generation Company LLC | TX | operating | 635 | Gas | 1960 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Metcalf Energy Center independent owner | Calpine Corp - Metcalf Energy Center | CA | operating | 635 | Gas | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Shawville independent owner | Shawville Power, LLC | PA | operating | 632 | Gas | 1954 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Haymaker Hybrid planned, approvals not started | Haymaker Energy Project LLC | MT | planned | 630 | Wind | 2031 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rock Island utility owner | PUD No 1 of Chelan County - (WA) | WA | operating | 629 | Hydro | 1931 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nelson Energy Center independent owner | Invenergy Services LLC | IL | operating | 628 | Gas | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Richard B Russell utility owner | USCE-Savannah District | GA | operating | 628 | Hydro | 1985 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Short Creek Solar interconnection agreement signed 2024-10; online expected 2027-12; request 24INR0201; financial security poste | — | Wichita Co., TX | planned | 628 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | DeCordova Steam Electric Station independent owner | Luminant Generation Company LLC | TX | operating | 627 | Gas | 1990 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dunkirk Generating Plant independent owner | Dunkirk Power LLC | NY | retired | 627 | Coal | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Presque Isle utility owner | Wisconsin Electric Power Co | MI | retired | 625 | Coal | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | J Lamar Stall Unit utility owner | Southwestern Electric Power Co | LA | operating | 624 | Gas | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Elk Hills Power LLC independent owner | Elk Hills Power LLC | CA | operating | 623 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sim Gideon utility owner | Lower Colorado River Authority | TX | operating | 623 | Gas | 1965 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Coleto Creek independent owner | Coleto Creek Power LP | TX | operating | 622 | Coal | 1980 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hermiston Generating Plant independent owner | Hermiston Generating Co LP | OR | operating | 621 | Gas | 1996 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gateway Generating Station utility owner | Pacific Gas & Electric Co. | CA | operating | 620 | Gas | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bastrop Energy Center independent owner | Bastrop Energy Partners, LP | TX | operating | 619 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fox Energy Center utility owner | Wisconsin Public Service Corp | WI | operating | 619 | Gas | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gila River Power Block 1 utility owner | Salt River Project | AZ | operating | 619 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gila River Power Block 2 utility owner | Salt River Project | AZ | operating | 619 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gila River Power Block 3 utility owner | Salt River Project | AZ | operating | 619 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gila River Power Block 4 utility owner | Salt River Project | AZ | operating | 619 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Five Wells Solar Center - Hybrid independent owner | Five Wells Solar Center, LLC | TX | operating | 618 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Illinois Generation LLC approvals received | Pattern Operators LP | IL | planned | 617 | Wind | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Newton independent owner | Illinois Power Generating Co | IL | operating | 617 | Coal | 1977 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Liberty Electric Power Plant independent owner | Liberty Electric Power LLC | PA | operating | 614 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | R E Ginna Nuclear Power Plant independent owner | Constellation Nuclear | NY | operating | 614 | Nuclear | 1970 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | State Line Energy independent owner | State Line Energy LLC | IN | retired | 614 | Coal | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cuchillas PV and BESS approvals pending | Gransolar Texas Two LLC | TX | planned | 613 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Shady Hills Combined Cycle Facility built, not yet in commercial operation | Shady Hills Energy Center, LLC | FL | planned | 612 | Gas | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Beaver utility owner | Portland General Electric Co | OR | operating | 611 | Gas | 1974 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cordova Energy independent owner | Cordova Energy Co LLC | IL | operating | 611 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kahe utility owner | Hawaiian Electric Co Inc | HI | operating | 610 | Oil | 1963 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sewaren independent owner | Parkway Generation Sewaren Urban Renewal Entity LLC | NJ | operating | 610 | Gas | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Indian River utility owner | Orlando Utilities Comm | FL | operating | 609 | Gas | 1960 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | John W Turk Jr Power Plant utility owner | Southwestern Electric Power Co | AR | operating | 609 | Coal | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lost Pines 1 Power Project utility owner | Lower Colorado River Authority | TX | operating | 609 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Newington Energy Center independent owner | Essential Power Operating Services, LLC | NH | operating | 606 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Short Creek Solar approvals pending | Wichita Solar I, LLC | TX | planned | 606 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kearny Generating Station independent owner | Parkway Generation Operating, LLC | NJ | operating | 605 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.