Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 72 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Logan City utility owner | City of Logan - (UT) | UT | operating | 16 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Logansport Solar independent owner | Cardinal Renewables | IN | operating | 16 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Madison Dam utility owner | NorthWestern Energy (MT Hydro) | MT | operating | 16 | Hydro | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Malden utility owner | City of Malden - (MO) | MO | operating | 16 | Oil | 1957 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Marsh Hill Wind Farm independent owner | Invenergy Services LLC | NY | operating | 16 | Wind | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | MCAGCC Cogen Plant independent owner | DOD USMC Marine Air Ground Combat | CA | operating | 16 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | MCCo BESS Generating Facility under construction, over half done | The Medical Center Company | OH | planned | 16 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mt. Jackson Solar independent owner | Energix Mt. Jackson, LLC. | VA | operating | 16 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mulberry Farm LLC independent owner | Onward Energy | TN | operating | 16 | Solar | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nine Springs utility owner | Madison Gas & Electric Co | WI | operating | 16 | Gas | 1964 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nottely utility owner | Tennessee Valley Authority | GA | operating | 16 | Hydro | 1956 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ozark Beach utility owner | Empire District Electric Co | MO | operating | 16 | Hydro | 1931 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pasto Solar independent owner | Altus Power America Management, LLC | NY | operating | 16 | Solar | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Plant No 2 Orange County independent owner | Orange County Sanitation Dist - (CA) | CA | operating | 16 | Other | 1993 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pratt utility owner | City of Pratt- (KS) | KS | operating | 16 | Gas | 1958 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pratt 2 utility owner | City of Pratt- (KS) | KS | operating | 16 | Gas | 1994 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Providence Solar independent owner | Providence Solar Center, LLC | TN | operating | 16 | Solar | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Raft River Geothermal Power Plant independent owner | US Geothermal Inc. | ID | operating | 16 | Other | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Russell Downtown utility owner | City of Russell - (KS) | KS | operating | 16 | Gas | 1971 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Saint Marys Hospital Power Plant independent owner | St Mary's Hospital | MN | operating | 16 | Oil | 1971 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sand Bar Power Plant independent owner | Tri-Dam Power Authority | CA | operating | 16 | Hydro | 1986 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Schaghticoke independent owner | Erie Boulevard Hydropower LP | NY | operating | 16 | Hydro | 1908 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Selmer Farm LLC independent owner | Onward Energy | TN | operating | 16 | Solar | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Selmer I independent owner | Selmer North Solar I, LLC | TN | operating | 16 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Seward (AK) utility owner | City of Seward - (AK) | AK | operating | 16 | Oil | 1975 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Simplot Leasing Don Plant independent owner | Simplot Leasing Corp | ID | operating | 16 | Other | 1986 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Soft Maple independent owner | Erie Boulevard Hydropower LP | NY | operating | 16 | Hydro | 1925 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | South Main Street utility owner | Rochelle Municipal Utilities - (IL) | IL | operating | 16 | Oil | 1967 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Canadaville, LLC independent owner | SR Canadaville, LLC | TN | operating | 16 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Platte Solar Farm independent owner | SR Platte, LLC | CO | operating | 16 | Solar | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sunflower Solar independent owner | Sunflower Solar, LLC | NC | operating | 16 | Solar | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Temple SEGF independent owner | Temple University | PA | operating | 16 | Gas | 1993 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Terrora utility owner | Georgia Power Co | GA | operating | 16 | Hydro | 1925 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tinton Falls Solar Farm independent owner | Tinton Falls Solar | NJ | operating | 16 | Solar | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Two Mile Desert Project independent owner | Citizens Enterprises Corporation | NC | operating | 16 | Solar | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Underwood PV2 independent owner | Strata Manager, LLC | NC | operating | 16 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Upper Mechanicville utility owner | New York State Elec & Gas Corp | NY | operating | 16 | Hydro | 1983 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wallingford Solar independent owner | Wallingford Renewable Energy, LLC | CT | operating | 16 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | West Station (DE) independent owner | Calpine Mid-Atlantic Generation LLC | DE | operating | 16 | Oil | 1964 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Windom Wind Project independent owner | Midwest Power Partners LLC | MN | operating | 16 | Wind | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wise utility owner | Pacific Gas & Electric Co. | CA | operating | 16 | Hydro | 1917 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Antelope Expansion 3A independent owner | AES Distributed Energy | CA | operating | 15 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Arrowrock Hydroelectric Project independent owner | Boise-Kuna Irrigation District | ID | operating | 15 | Hydro | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Arvada utility owner | Basin Electric Power Coop | WY | operating | 15 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Badger 1 independent owner | Desert Sky Solar LLC | AZ | operating | 15 | Solar | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Baker City Solar independent owner | Adapture Renewables, Inc. | OR | operating | 15 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Beaufort Solar, LLC independent owner | Capital Power Corporation | NC | operating | 15 | Solar | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Biggs Ford Solar Center independent owner | Biggs Ford Solar Center, LLC | MD | operating | 15 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Black Walnut Energy Storage LLC independent owner | Black Walnut Energy Storage LLC | CA | operating | 15 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Blake independent owner | Erie Boulevard Hydropower LP | NY | operating | 15 | Hydro | 1957 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bonny Eagle independent owner | Brookfield White Pine Hydro LLC | ME | operating | 15 | Battery storage | 1910 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Boysen utility owner | U S Bureau of Reclamation | WY | operating | 15 | Hydro | 1952 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Buxton utility owner | North Carolina El Member Corp | NC | operating | 15 | Oil | 1991 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Castle Rock utility owner | Wisconsin River Power Company | WI | operating | 15 | Hydro | 1950 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | CED Ducor 3 independent owner | RWE Clean Energy | CA | operating | 15 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Clearwater 1 utility owner | PacifiCorp | OR | operating | 15 | Hydro | 1953 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Conemaugh Hydro Plant independent owner | Pennsylvania Renewable Resources | PA | operating | 15 | Hydro | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cosmo Specialty Fibers Plant independent owner | Cosmo Specialty Fibers | WA | operating | 15 | Other | 1957 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cumblerland Land Holdings, LLC independent owner | Cumberland Land Holdings, LLC | AL | operating | 15 | Solar | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Depot Solar Center, LLC independent owner | Emerald Hills Holding I, LLC | VA | operating | 15 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dexter utility owner | USACE Northwestern Division | OR | operating | 15 | Hydro | 1955 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Electric City Solar independent owner | Greenbacker Renewable Energy Corporation | MI | operating | 15 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Elevate Arthur Kill built, not yet in commercial operation | Lighthouse Arthur Kill, LLC | NY | planned | 15 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Elk Hill Solar 2 independent owner | Lightsource Renewable Energy Asset Management, LLC | PA | operating | 15 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Five Points Solar Station utility owner | Pacific Gas & Electric Co. | CA | operating | 15 | Solar | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ford Utilities Center independent owner | University of New Mexico | NM | operating | 15 | Gas | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Forks of Butte Hydro Project independent owner | Hypower Energy, LLC | CA | operating | 15 | Hydro | 1992 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Foul Rift Solar Farm independent owner | NJR Clean Energy Ventures Corporation | NJ | operating | 15 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | French Meadows utility owner | Placer County Water Agency - (CA) | CA | operating | 15 | Hydro | 1966 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Grissom Solar, LLC independent owner | SunStrong Management | NC | operating | 15 | Battery storage | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hardin Hilltop Wind LLC independent owner | Hardin Holdco LLC | IA | operating | 15 | Wind | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Henry Station utility owner | City of Bay City - (MI) | MI | operating | 15 | Gas | 1993 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | High Falls - Saranac NY utility owner | New York State Elec & Gas Corp | NY | operating | 15 | Hydro | 1948 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | HP Hood CT independent owner | HP Hood LLC | VA | operating | 15 | Gas | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hurricane City Power utility owner | Hurricane City Power - (UT) | UT | operating | 15 | Gas | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hydro Kennebec Project independent owner | Hydro Kennebec LLC | ME | operating | 15 | Hydro | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Inks utility owner | Lower Colorado River Authority | TX | operating | 15 | Hydro | 1938 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kiefer Landfill independent owner | Sacramento County of Dpt Waste | CA | operating | 15 | Other | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kings Beach utility owner | Liberty Utilities (CalPeco Electric) LLC | CA | operating | 15 | Oil | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lanikuhana Solar LLC independent owner | Lanikuhana Solar LLC | HI | operating | 15 | Solar | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Latitude Solar Center independent owner | Arevon Energy, Inc. | TN | operating | 15 | Solar | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lawrence Hydroelectric Associates independent owner | Central Rivers Power US, LLC | MA | operating | 15 | Hydro | 1981 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Letts Creek Solar, LLC independent owner | AES Distributed Energy | MI | operating | 15 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Listonburg Solar independent owner | Listonburg Solar, LLC | PA | operating | 15 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Livingston Generating Facility utility owner | Hoosier Energy R E C, Inc | IL | operating | 15 | Other | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mammoth G2 independent owner | Ormat Nevada Inc | CA | operating | 15 | Other | 1990 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mammoth G3 independent owner | Ormat Nevada Inc | CA | operating | 15 | Other | 1990 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Marshall Solar Plus LLC utility owner | Western Minnesota Mun Pwr Agny | MN | operating | 15 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | McLauchin utility owner | North Carolina El Member Corp | NC | operating | 15 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Metro Wastewater Reclamation District independent owner | ENGIE Denver Metro LLC | CO | operating | 15 | Other | 1985 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mill Run Windpower LLC independent owner | Sequitur Renewables, LLC | PA | operating | 15 | Wind | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mocksville Solar utility owner | Duke Energy Carolinas, LLC | NC | operating | 15 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Monroe Street utility owner | Avista Corp | WA | operating | 15 | Hydro | 1992 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mont Belvieu Cogeneration Unit independent owner | Targa Co-Generation LLC | TX | operating | 15 | Gas | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Morelos del Sol independent owner | Southern Power Co | CA | operating | 15 | Solar | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nellis Solar PV II utility owner | Nevada Power Co | NV | operating | 15 | Solar | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | North Stonington Solar Center, LLC independent owner | Adapture Renewables, Inc. | CT | operating | 15 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | NSF Union independent owner | NJR Clean Energy Ventures Corporation | NY | operating | 15 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Osage City utility owner | City of Osage City - (KS) | KS | operating | 15 | Gas | 1955 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Parker Road Solar independent owner | NJR Clean Energy Ventures Corporation | NJ | operating | 15 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.